Oracle Database 19c: RAC, ASM, and Grid Infrastructure Administration - 1z0-078 模擬練習

Identify three prerequisites for the successful installation of Oracle Grid Infrastructure 19c when using Full Featured Grid Naming Service (GNS). (Choose three.)

正解: D,E,F
Which two steps must always be performed to delete node host04 from an Oracle 19c Clusterware cluster that does not use Grid Naming Service (GNS)? (Choose two.)

正解: B,E
Which two statements are true regarding the default service that is automatically created upon PDB creation in a RAC database environment? (Choose two.)

正解: B,D
Examine these descriptions of ASM instance shutdown behavior:
1) The ASM instance shuts down immediately without an orderly dismount of disk groups.
2) Active SQL statements are allowed to complete before an orderly dismount of all disk groups occurs and then the ASM instance shuts down without waiting for connected sessions to disconnect. If any ASM clients are connected to the instance, then the shutdown returns an error.
3) Active SQL statements are allowed to complete before an orderly dismount of all of disk groups occurs and then the ASM instance shuts down after waiting for connected sessions to disconnect. If any ASM clients are connected to the instance, then the shutdown returns an error.
Which two lists are correct matches for these descriptions? (Choose two.)

正解: A,B
You must deploy several Oracle 19c databases on an Oracle Grid Infrastructure Managed Cluster, and are required to have the ability to perform these actions without down time:
1. Apply a Grid Infrastructure interim patch.
2. Apply a Grid Infrastructure Patch Set Update (PSU).
3. Apply a database on-line patch.
4. Apply a Grid Infrastructure patchset.
5. Apply a database patchset.
6. Upgrade Grid Infrastructure from one release to another.
7. Upgrade databases from one release to another.
Your plan is to perform these tasks:
1. Install and configure Oracle Grid Infrastructure on a local file system.
2. Install Oracle Database software on an ACFS file system.
3. Create several RAC One Node databases.
Which of the seven requirements are met by your plan?

正解: F
Which three statements are true concerning activation of a user-defined policy in Oracle 19c Clusterware? (Choose three.)

正解: B,E,F
Which three statements are true about diagnostic reporting for the OCR and OLR files? (Choose three.)

正解: A,B,C
Which two statements are true about initialization parameters for Clustered ASM instances? (Choose two.)

正解: B,C