Oracle Manufacturing Cloud 2024 Implementation Professional - 1z0-1075-24 模擬練習
An employee is responsible for dealing with different manufacturing practices and processes, machines, tools, and equipment that turn raw material into a product.
Which seeded job role must you assign to this employee?
Which seeded job role must you assign to this employee?
正解: B
解説: (PassTest メンバーにのみ表示されます)
You create a work order, in which some of the operations have components with the Push supply type. While reporting material consumption on the Report Material Transaction page, you want the Push components to default whenever the operator selects Show Components.
Which setup task must you perform in the Manage Plant Parameters section to achieve this?
Which setup task must you perform in the Manage Plant Parameters section to achieve this?
正解: D
解説: (PassTest メンバーにのみ表示されます)
Your client has asked you to implement the functionality to ensure that the system checks for Qualified Operators when reporting labor usage.
Which statement is NOT true?
Which statement is NOT true?
正解: B
解説: (PassTest メンバーにのみ表示されます)
A Plant Manager bought several machines for their ABC manufacturing plant. The plant is set up with a separate cost element set, ABC, in Manufacturing Cloud.
How must the Plant Manager configure these machines so that they are costed to the work order for which operations are performed on them?
How must the Plant Manager configure these machines so that they are costed to the work order for which operations are performed on them?
正解: D
解説: (PassTest メンバーにのみ表示されます)
Your client is planning to override the Plant Production Calendar with One or More Date-Effective Work Center Calendars. You need to explain the consideration when using the Override the Plant Production Calendar with One or More Date-Effective Work Center Calendars feature.
Which three statements are true when overriding the production calendar?
Which three statements are true when overriding the production calendar?
正解: C,D,E
解説: (PassTest メンバーにのみ表示されます)
During a Manufacturing Cloud implementation, a Production Supervisor wants to close the work orders for the previous month and make sure that they include the correct cost.
What must they do to achieve this?
What must they do to achieve this?
正解: C
解説: (PassTest メンバーにのみ表示されます)