VCE Vblock Systems Deployment and Implementation - Core - 210-010 模擬練習

What is the purpose of the EMC VNXe Connection Utility installed on the Vblock System 320 array management server?

正解: D
You are adding a new VLAN from the Cisco Nexus 1000V. You use the state enabled command.
What is the result of this command?

正解: D
During a Vblock System 320 deployment, the customer wants to disassociate four half-width blades in a single chassis for a future project.
Which tool is used to perform this compute reconfiguration?

正解: A
What is a valid method to install EMC PowerPath/VE onto a VMware ESXi host?

正解: C
A Vblock System 720 has been configured in the factory according to the VCE Logical Build Guide.
Which statement is correct?

正解: D
Which protocol is used to provide unified file storage connectivity to a Vblock System 320?

正解: C
What information is displayed when an administrator uses the show vsan membership command on a Cisco MDS switch?

正解: C
During a Vblock System 200 deployment, a single server did not power on and a replacement has been received.
Which management interface is used to prepare the server for installation?

正解: C
A customer would like to add a new production VLAN to their Vblock System with UIM/P. The VLAN was added to the UIM/P service profile, and the connected Cisco Nexus 5000. The customer is still not able to use the new VLAN with a virtual machine.
Which step must the customer complete?

正解: A
Customers provide the information used to develop the Logical Configuration Survey (LCS) before manufacturing begins.
What information is required? (Choose two.)

正解: A,D