AACE International Planning & Scheduling Professional (PSP) - AACE-PSP 模擬練習

When are project planning and scheduling specifications established?

正解: B
Using the "normal" schedule, what is the early finish date of activity 10002 and its total float?

正解: B
解説: (PassTest メンバーにのみ表示されます)
Determine the correct formula and date for the late finish for Activity 9004.

正解: A
解説: (PassTest メンバーにのみ表示されます)
Based on the stated costs, what percentage of the total cost comes from the 2000 series of activities?

正解: A
解説: (PassTest メンバーにのみ表示されます)
Determine the driving activity for Activity 10001.

正解: C
解説: (PassTest メンバーにのみ表示されます)
A KPI is an acronym for:

正解: D
A good change management plan___________.

正解: A
解説: (PassTest メンバーにのみ表示されます)
What does the narrow band at "Y" represent?

正解: C
解説: (PassTest メンバーにのみ表示されます)
Which of the following project planning situations is the most frequent contributor to cost overruns?

正解: C
解説: (PassTest メンバーにのみ表示されます)
What is a key first step in developing a critical path method schedule?

正解: A
解説: (PassTest メンバーにのみ表示されます)
Schedule Risk may affect the following:

正解: A
SUBCO is a potential concrete bridge contractor based in a metropolitan area 300 miles away from your project. They have offered to supply manpower and equipment t BILCO at a per diem rate of $3,000 above their direct labor and equipment rates. In doing a cost benefit analysis, which of the following is NOT a consideration?

正解: D
解説: (PassTest メンバーにのみ表示されます)
When should the Project Plan have incorporated the relevant interfaces and requirements of the project contract documents?

正解: D