API Pipeline Construction Inspector - API-1169 模擬練習

All pipe installed in navigable river, stream or harbor must be installed with a min of __________ in of rock cover.
49 CFR 192.327

正解: A
What is the min stress relieving temp for ferritic alloy steels?
-1150 deg F
-1200 deg F
-1100 deg F
-1350 deg F

正解: A
Define Owners/Operators Representative

正解: B
In order to ensure the env. protection and pollution control regulatory compliance, the inspector shall have basic knowledge of?

正解: A
29 CFR Part 1926

正解: C
The cross company will identify areas where blasting will be used along the route within how many feet of the existing facilities to be crossed?

正解: D
Which pressure test is designed to establish the operating pressure limit of a pipe?
-Strength pressure
-Hydrostatic pressure
-Spike pressure
-Leak pressure

正解: C
when crossing a wetland, where do you put the ditch plug?
-at edge
-10 ft past
-65 ft after
- no plug required

正解: D
Inspectors during stringing (should or should not?) inspect for which of the following:
-tag ropes and frayed cables
- pipe spacers and skid count
-pipe placement and it,s wall thickness?

正解: D
The inspector should check and ensure that soft earth padding at least ____________ thick is in place in Rocky train in accordance with job specifications.

正解: B
Blue

正解: B