Autodesk Certified Professional in BIM Management for Building Design - BIM_MGT_101 模擬練習
A Revit model has become very slow for the team immediately after a regularly scheduled file distribution across all disciplines.
What two steps can the BIM manager take to review issues across the connected files? (Select two.)
What two steps can the BIM manager take to review issues across the connected files? (Select two.)
正解: A,D
解説: (PassTest メンバーにのみ表示されます)
A design team requests a focused coordination review between the Architectural and Structural published design models. They want to exclude all other trades from the clash matrix.
What should the BIM manager do to ensure only the Architectural and Structural models are included in clash detection?
What should the BIM manager do to ensure only the Architectural and Structural models are included in clash detection?
正解: A
解説: (PassTest メンバーにのみ表示されます)
Refer to the exhibits.




A BIM manager is preparing a site model that includes three separate buildings. Which exhibit shows the correct way to assemble and position the individual building models on the site while maintaining proper coordinates and orientation?








A BIM manager is preparing a site model that includes three separate buildings. Which exhibit shows the correct way to assemble and position the individual building models on the site while maintaining proper coordinates and orientation?




正解: C
解説: (PassTest メンバーにのみ表示されます)
Which of the following would typically be included in an AECO BIM data handover package at project closeout?
正解: C
解説: (PassTest メンバーにのみ表示されます)
A campus project of several duplicated links of a building model has received an updated civil background, with revised GIS coordinates.
Drag and drop to indicate the correct order of steps the BIM manager should perform to revise the architectural model.

Drag and drop to indicate the correct order of steps the BIM manager should perform to revise the architectural model.

正解:

The BIM manager is working in an Architectural model that uses the phases Existing and New Construction. They have linked in a Structural model that uses only Phase 1 for existing and Phase 2 for new construction. After linking, they notice that demolition elements from the Structural model do not display correctly in the demolition views.
Which approach allows the BIM manager to display linked elements correctly based on this phase setup, without changing the phases in the linked model?
Which approach allows the BIM manager to display linked elements correctly based on this phase setup, without changing the phases in the linked model?
正解: B
解説: (PassTest メンバーにのみ表示されます)