Which one of the following statements best describes the requirements of Time for Completion?

正解: A
解説: (PassTest メンバーにのみ表示されます)
The procurement process of a project executed based on any FIDIC Contract model is exactly the same in terms of definitions, time and steps, which makes it universal and more easy to use worldwide. Is this statement true or false?

正解: B
解説: (PassTest メンバーにのみ表示されます)
Which of the following form a Contractor ' s entitlement, in case the Contractor does not receive an interim payment within the allocated contractual deadline for payment? (2 correct answers apply) Choose all of the correct answers (multiple possibilities).

正解: B,D
解説: (PassTest メンバーにのみ表示されます)
A large sewage pump installation has been constructed under the FIDIC Yellow Book (edition 1999). Prior to commencement of the Tests on Completion, the Employer requires the Contractor to issue the Operation and Maintained Manuals. All contract documents are to be drafted in the English language as per Sub-Clause 1.4.
However, the Employer discovers all documents are drafted in a different language: French. The Contractor explains that the territory where the Plant was constructed is a region with French as a second official language, as result of which, this approach is acceptable. This also works for the proposed maintenance company, which is Paris-based. The Employer is surprised and asks you what to do. Select the best fitting advice you should give the Employer.

正解: D
解説: (PassTest メンバーにのみ表示されます)
(In the FIDIC Yellow Book (edition 1999), the Contractor has to provide the Engineer with documents as stated in Sub-Clause 5.2. Who is responsible for ensuring there is sufficient time allocated for reviewing these documents in relation to the Schedule of the Works?)

正解: B
解説: (PassTest メンバーにのみ表示されます)
Towards the end of implementing a varied work (initiated originally by the Contractor as a " Value Engineering Proposal " , relevant designs provided by the Contractor) it turned out, that there is some part of it not complying with the otherwise prevailing standards. Which statements are correct in this situation?
[FIDIC Red Book, 2017 Edition]
Choose all of the correct answers (multiple possibilities).

正解: C,D
解説: (PassTest メンバーにのみ表示されます)
Under the FIDIC Red, Yellow, and Silver Books (both editions), the Employer has an obligation to give a detailed notice to the Contractor about intended changes that are material to its financial arrangements.

正解: A
解説: (PassTest メンバーにのみ表示されます)
Which of the following statements are relevant to continuing effect claims? [FIDIC 2017 Edition] (2 correct answers apply)

正解: B,C
解説: (PassTest メンバーにのみ表示されます)