In general, which of the following is the least expensive and easiest way to finance an energy project?
正解: B
What term describes the difference between the control signal value and the set point?
正解: D
Using an interest rate of 15%, an energy project has a net-present value (NPV) of $3,500. Which statement is true about the project's internal rate of return (IRR)?
正解: D
A building has a 100 m² wall with an R-value of 14.4 (m²-C/W) in a climate with 3,500 heating degree days (HDD). The building heater is 85% efficient [based on the fuel's higher-heating value (HHV)]. The fuel cost is $5.00/GJ [based on the fuel's higher-heating value (HHV)]. What is the annual cost of the heat loss through the wall?
正解: C
You can buy air compressor A for $15,000 or air compressor B for $6,000. Compressor A will cost $10,000 per year to operate. Compressor B will cost $11,500 per year to operate. If both air compressors have a 10- year life and your required return on investment is 12%, which air compressor has the lowest total life-cycle cost?
正解: C
Which of the following instruments is most useful for tracking long-term boiler performance?
正解: B
解説: (PassTest メンバーにのみ表示されます)
A cooling tower delivers 29°C water to a central chilled water plant. The cooling tower is capable of delivering water to the chilled-water plant with a 6°C approach temperature to the ambient wet bulb temperature. Using this information, what type of control strategy would you recommend be added to the cooling tower operation to save additional energy?
正解: C
A large office building is entirely fitted out with ten-thousand new T5 fluorescent lamps today, which will be operational for 2,500 hours per year. The lamps are supposed to last 17,860 hours. How many months from today will be the best schedule for group relamping (total replacement of all the T5 fluorescent lamps in the building)?
正解: B
A compressed-air distribution system has one section that frequently has low pressure when demand for compressed air is high. How can you resolve the problem without increasing energy consumption?
正解: C
When should commissioning be included in the design and construction of a facility?
正解: C