ASQ Certified Quality EngineerExam - CQE 模擬練習
What type of test should be used to detect certain kinds of subsurface flaws?
正解: A
解説: (PassTest メンバーにのみ表示されます)
During a daily production meeting, the materials manager discusses a priority shipment that is being delayed due to material being placed on hold from a nonconformance. The process engineer was present when the material was placed on hold and states that the nonconformance will not impact fit. form or function. The manufacturing manager shares that per the ISO standard, the risk should be accepted and the product should be shipped. Which action would be most appropriate for the quality engineer to take first?
正解: A
解説: (PassTest メンバーにのみ表示されます)
Quality planning is an activity that identifies the needs of which of the following stakeholders?
正解: A
解説: (PassTest メンバーにのみ表示されます)
Temperature measured in degrees centigrade is an example of what type of measurement scale?
正解: B
解説: (PassTest メンバーにのみ表示されます)
A test-retest study is performed to a coordinate measuring machine (CMM) using a working standard of
100.00 ± 0.001 mm (95% confidence). The length of the standard is measured 30 rimes. The mean and standard deviation of the measurements are x = 107.88: mm and 5 = 2.497 mm. All of the measurements are made are the same location on the standard and are taken by the same technician, who mounts and dismounts the unit for each measurement.
The necessary correction for the CMM is estimated to be
100.00 ± 0.001 mm (95% confidence). The length of the standard is measured 30 rimes. The mean and standard deviation of the measurements are x = 107.88: mm and 5 = 2.497 mm. All of the measurements are made are the same location on the standard and are taken by the same technician, who mounts and dismounts the unit for each measurement.
The necessary correction for the CMM is estimated to be
正解: C
解説: (PassTest メンバーにのみ表示されます)
The primary characteristic of risk management is being
正解: C
解説: (PassTest メンバーにのみ表示されます)
Which of the following statements is true about the average outgoing quality limit (AOQL)?
正解: C
解説: (PassTest メンバーにのみ表示されます)
Risk control includes making decisions using which of the following pieces of information?
正解: A
解説: (PassTest メンバーにのみ表示されます)
Which of the following information should be contained in work instructions?
正解: D
解説: (PassTest メンバーにのみ表示されます)
Which of the following tools is effective for evaluating all possible causes of a problem and isolating the probable causes?
正解: D
解説: (PassTest メンバーにのみ表示されます)
A process produces rejects at a rate of 6° o. If multiple samples of 5 are drawn from a population of 100.000.
what is the expected number of rejects per sample?
what is the expected number of rejects per sample?
正解: A
解説: (PassTest メンバーにのみ表示されます)
Which of the following statements BEST describes a bimodal distribution?
正解: A
When trying to find all possible causes of a problem, which of the following tools would be useful?
. Systematic troubleshooting and brainstorming.
. Fishbone diagrams and histograms.
. Checklists and scatter diagrams.
. Control charts and graphs.
. Systematic troubleshooting and brainstorming.
. Fishbone diagrams and histograms.
. Checklists and scatter diagrams.
. Control charts and graphs.
正解: C
Which of the following tools can be used to show a frequency distribution?
正解: C
解説: (PassTest メンバーにのみ表示されます)