ISQI ISTQB Certified Tester Advanced Level - Test Analyst (Syllabus 2012) - CTAL-TA_Syll2012 模擬練習

Working together with the test manager during test planning, which of the following activities is NOT expected to be performed by the test analyst?
[K2] 1 credit

正解: C
As a test analyst you are gathering data to support accurate metrics. Which of the following metrics would be MOST appropriate to use to monitor product quality?
[K2] 1 credit

正解: A,C,E
Which of the following is a type of testing that someone in the role of a test analyst, working with the test manager, should typically consider and plan for?
[K2] 1 credit

正解: C
As part of defining an approach the usability, acceptance criteria need to be defined. Which of the following acceptance criteria would be appropriate for operability?
[K4] 3 credits

正解: A
Tax system
A tax system needs to be updated due to new legislation. For a person with a salary of less than EUR
20.000 and who is married, the tax needs to be re-calculated. If the person also has more than two and less than five children, an additional 10% reduction is applicable.
How many input classes can be distinguished when applying equivalence partitioning to the "Tax System" specification?
[K3] 2 credits

正解: C
Apart from state transition testing, which other specification-based technique would you additionally choose to test the interfaces between components of "Route Calculation" and thus typically find different types of defects?

Identify the MOST likely technique from the following list.
[K4] 3 credits

正解: C