Which of the following statement about agile distributed scheme is correct? (Multiple choice)
正解: A,C
AP8030DN placed in the roof covering the outdoor area, usually can also cover the indoor area.
正解: B
How much dB does the directional antenna attenuate the antenna's main lobe width?
正解: A
WLAN security access authentication technology, which way empty port packets must be encrypted transmission (multiple choice)
正解: A,D
255.While surveying, the engineers need to determine the the coverage target that customers require. The coverage targets are mainly: the main coverage targets, secondary coverage targets and special objectives, the filed strength in the main coverage target should reach among -65dBm-85dBm.
正解: B
What are the factors mainly related to AP number estimation? (Multiple choice)
正解: C,D
Which description of the antenna is hanging high is correct when the WLAN is covered?
正解: B
The distance between two points in a project is 4.5km, in order to achieve data back between the two points, which of the following information does engineers need to collect? (Multiple choice)
正解: B,C,D
Huawei box switch S127XX with the board AC X1E board number, the relationship with the manageable AP scale is: the number of AC board * the number of AP supported by the board.
正解: B
The following description of the role of the coupler, which is wrong? (Multiple choice)
正解: A,C,D
The following is true about WLAN channel planning? (Multiple choice)
正解: A,B
What is the purpose of using the WLAN Tester 2.0 tool to conduct an engineering survey at the beginning of the project? (Multiple choice)
正解: A,B,D
What about the following SSID planning is not achievable in the WLAN Enterprise Network?
正解: C