Huawei HCSA-Presales-Data Center Facility(Modular DC) V1.0 - H19-132_V1.0 模擬練習

Which of the following verification outcomes does not affect BOQ submission?

正解: C
解説: (PassTest メンバーにのみ表示されます)
The FusionModule500 uses the typical configuration mode, with core components preinstalled at the factory.
How long does it take to roll out services on site?

正解: D
解説: (PassTest メンバーにのみ表示されます)
Huawei FusionDC1000 Prefabricated Modular Data Center Solution includes _____.
Select All that Apply.

正解: A,B,C
解説: (PassTest メンバーにのみ表示されます)
For how long can the FusionDC1000A prefabricated integrated data center endure the C4 corrosion-resistance durability test?

正解: D
解説: (PassTest メンバーにのみ表示されます)
Which of the following Sparts can be ordered through the SCT?

正解: B
解説: (PassTest メンバーにのみ表示されます)
Which of the following tasks does SCT support?
Select All that Apply.

正解: A,B,C,D
解説: (PassTest メンバーにのみ表示されます)
Which of the following pieces of equipment is the key equipment in the FusionModule2000 cooling system?

正解: D
解説: (PassTest メンバーにのみ表示されます)
Which of the following actions can be performed on a BOQ from theMy Quotationpage?
Select All that Apply.

正解: A,B,C,D
解説: (PassTest メンバーにのみ表示されます)