USGBC LEED AP Building Design + Construction (LEED AP BD+C) - LEED-AP-BD-C 模擬練習
During the early stages of a LEED for Schools project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected paint color whose light reflectance value was 75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?
正解: C
解説: (PassTest メンバーにのみ表示されます)
Which of the following documents contains the design team's interpretation of the Owner's Project Requirements?
正解: C
解説: (PassTest メンバーにのみ表示されます)
A school project is located in a basin. Snow melts in the spring on the nearby mountains which replenishes the local water supply. The nearby highways are sometimes closed during the winter due to the winter storm. What is the top priority the project team should focus on?
正解: A
解説: (PassTest メンバーにのみ表示されます)
Minimizing light trespass is a key component of which of the following credits?
正解: D
解説: (PassTest メンバーにのみ表示されます)
Which of the following should be evaluated to assess a project's human-use and health impacts?
正解: C
解説: (PassTest メンバーにのみ表示されます)
Which of the following is an example of nonpotable water that can be effectively used for landscape irrigation to improve water efficiency?
正解: A
解説: (PassTest メンバーにのみ表示されます)
What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?
正解: C
解説: (PassTest メンバーにのみ表示されます)
An owner has requested that the project team redesign a large office building. As part of the redesign, the owner would like to move the main entrance to the opposite side of the building. Achievement of which credit may be affected by the move?
正解: A
解説: (PassTest メンバーにのみ表示されます)
Which of the following design features helps ensure thermal safety in buildings during extreme heat events by allowing passive cooling?
正解: B
解説: (PassTest メンバーにのみ表示されます)
Questions 1-5 are based on the same project scenario. Please use the scenario information when answering.
A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.
The original hospital achieved the Gold certification level and was built with the capacity to add three floors-levels six through eight-to the top of the structure. This addition requires partial demolition of the roof and the floor below.
The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.
The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.
The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.
The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.
The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.
Based on the project design and the credit options that the project team may attempt, what is the highest LEED certification level that can be achieved?
A hospital certified underLEED V5in 2018 is designing and constructing a 21,000 ft² (1,950.96 m²) vertical addition, plus vegetated terraces and a mechanical penthouse.
The original hospital achieved the Gold certification level and was built with the capacity to add three floors-levels six through eight-to the top of the structure. This addition requires partial demolition of the roof and the floor below.
The project is designed to be architecturally cohesive with the existing building façade and is targeting Platinum certification under LEED v5.
The campus is in a dense urban area adjacent to several bus stops, a light-rail transit station within a 2,500 ft. (762 m) walking distance, and a bicycle docking point at the main entrance to the property. An on-campus shuttle service connects patients, visitors, and staff from the parking areas to each medical building and the light-rail station.
The healthcare campus has existing infrastructure; therefore, no new roads, sidewalks, parking structures, or ground-level landscaping will be installed.
The new floors have separate mechanical systems in the penthouse, but piping for public and patient restrooms, janitor closets, and staff break rooms connects directly to the main hospital plumbing system.
The newly installed medical equipment uses gas, steam, and chilled water supplied by the campus central plant.
Based on the project design and the credit options that the project team may attempt, what is the highest LEED certification level that can be achieved?
正解: A
解説: (PassTest メンバーにのみ表示されます)
A project team is providing additional ventilation under Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies. What credit could this adversely affect?
正解: A
解説: (PassTest メンバーにのみ表示されます)
A facility manager cleaning highly reflective paving material is
正解: B
解説: (PassTest メンバーにのみ表示されます)