Veeam Certified Engineer 2020 - VMCE2020 模擬練習
The backup administrator configured replication for a VM from Data Center 1 to Data Center 2, which runs every day at 1 a.m. A power surge takes out Data Center 1 at 7 a.m. and the administrator fails over the replica at 8 a.m. When the power comes back on, the administrator performs the "failback" action at 2 p.m.
and checks the state of the original VM. They recognize that not all data is available. What is missing?
and checks the state of the original VM. They recognize that not all data is available. What is missing?
正解: C
解説: (PassTest メンバーにのみ表示されます)
A company has replicated their critical application VMs to a second data center in another region. Their key application includes two database VMs and three application VMs. For proper operation, the database VMs need to start before the application VMs. What needs to be configured in Veeam to prepare for a disaster recovery situation?
正解: A
Exhibit:

Look at the diagram. This daily backup job has been running for over 30 days and no active full backups have been taken since the first run. Which of the following best describes the backup job?

Look at the diagram. This daily backup job has been running for over 30 days and no active full backups have been taken since the first run. Which of the following best describes the backup job?
正解: C
A NAS backup job has been configured within Veeam Backup & Replication, and is completing successfully, but restore operations have been failing for the last few days. What is causing the failure?
正解: A
When configuring a SureBackup job, what are some of the criteria for adding servers to an application group?
(Choose two.)
(Choose two.)
正解: A,E