
[2026年02月] 合格させるSAP E-S4CON-2505テストエンジンPDFで完全版無料問題集
SAP Certified Specialist - SAP S/4HANA Conversion and SAP System Upgrade練習テスト2026年最新のE-S4CON-2505ストレスなしで合格!
SAP E-S4CON-2505 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
質問 # 22
Which of the following scenarios does Software Update Manager cover? Note: There are 2 correct answers to this question
- A. Conversion to SAP S/4HANAA on-premise
- B. Conversion to SAP S/4HANAA Cloud Public Edition
- C. Conversion to SAP S/4HANAA Cloud Private Edition
- D. New Implementation
正解:A
質問 # 23
You are performing an SAP S/4HANA conversion.
When does the silent data migration (SDM) take place using the SUM defaults?
- A. Before the start of the SUM technical downtime
- B. After SUM has ended
- C. During the Post processing roadmap step
- D. During the Preprocessing roadmap step
正解:B
質問 # 24
Which preoperational steps must be performed for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. Perform the custom code adjustment.
- B. Install add-on SAP Gateway 7.50.
- C. Delete client 066 (Early-Watch client).
- D. Uninstall SAP Fiori apps NO T released for SAP_UI 7.50.
正解:C、D
質問 # 25
You are planning an SAP S/4HANA conversion.
Which conversion-specific tasks must be performed during the preparation phase?
- A. Perform the migration of data to the new data structure.
- B. Solve problems from the simplification item (SI) checks.
- C. Check the compatibility of custom code with SAP S/4HANA.
- D. Run the database migration to the SAP HANA database.
正解:C
質問 # 26
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE MIG_DT_RUN is running In the Charts Control Center, you can see 400 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
- A. SUM is still running in uptime; the 40 defined R3load processes are considered.
- B. There are 40 R3load processes used for copying and 40 R3load processes for table count verification.
- C. These are 40 pairs of R3load processes, so there are 80 R3load processes running
- D. Without table contents comparison, only 40 R3load processes are being started.
正解:C
質問 # 27
You are performing an SAP S/4HANA conversion with DMO. You entered a specific number of R3load processes during the Extraction Roadmap step.
Where can you change this during the migration via the Utilities option of the SUM UI?? Note: There are 2 correct answers to this question.
- A. In SUM Parameters
- B. In Process Control Center
- C. In DMO Migration Preparation
- D. In SUM Analysis
正解:A、B
質問 # 28
You are running an SAP ECC system with SAP BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.
- A.
- B.
- C.
- D.
- E.
正解:A、B、E
質問 # 29
You are performing an in place SAP S/4HANA conversion including DMO.
What is the latest point in time when you can reset the procedure without losing business data?
- A. The start of the business downtime
- B. The end of the business downtime
- C. The start of the Execution roadmap step
- D. The end of the database migration
正解:B
質問 # 30
What is the minimum SAP BASIS release of an SAP ECC system that can be converted t o an SAP S/4HANA Server 2023?
- A. 0
- B. 1
- C. 2
- D. 3
正解:D
質問 # 31
Which orchestration tool facilitates a move to SAP cloud by wrapping different scenarios such as Lift&Shift or system conversion to SAP S/4HANA?
- A. Software Orchestrator
- B. SAP migration cockpit
- C. RISE with SAP system transition workbench
- D. SAP Business Transformation Center
正解:C
質問 # 32
During a SUM run, you want to check if the PARCONV_UPG phase is still running property. Where can you find information about this? Note: There are 2 correct answers to this question.
- A. Check for running R3trans processes on the host where SUM is running
- B. Check the latest log files in the SUM directory, subdirectory a bap, subdirectory tmp.
- C. Check the running batch job via Job Overview (SM37).
- D. Check for running R3load processes on the host where SUM is running
正解:B、C
質問 # 33
When using the DMO of SUM, which files can be handled by SUM in the download directory? Note:
There are 2 correct answers to this question.
- A. Breakpoint configuration file SAPUPPHAS.BRK
- B. MIGRATE_DT_DUR.XML file from a previous run
- C. Stack XML file calculated by the maintenance planner
- D. Parameter file SAPup_add.par
正解:B、C
質問 # 34
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system before SUM continues? Note: There are 2 correct answers to this question.
- A. Assign the transport request as a modification adjustment transport.
- B. Manually activate the adjusted dictionary objects.
- C. Create new versions of the objects you need to adjust.
- D. Release the transport request containing the modification adjustment.
正解:A、C
質問 # 35
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?
- A. EU CLONE MIG_DT_RUN
- B. EU_CLONE MIG_DT_CREATTE
- C. EU IMPORT ALL
- D. EU_CLONE MIG SOT RUN
正解:A
質問 # 36
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?
- A. To optimize the main import
- B. To optimize the conversion
- C. To optimize the activation
- D. To optimize the migration
正解:D
質問 # 37
What is the name of the additional server that is used for a transition to SAP S/4HANA Cloud Private Edition?
- A. Migration Server
- B. Migration Hub
- C. Transition Server
- D. Central Instance
正解:A
質問 # 38
......
時間限定!今すぐ無料アクセスE-S4CON-2505練習試験用問題:https://drive.google.com/open?id=1ElmuwJ3CDSLSwI3VNK2GzcR5Cy2dXUgx
オンライン試験練習テストと詳細な解説付き!:https://www.passtest.jp/SAP/E-S4CON-2505-shiken.html