
2026年03月22日合格確定ガイド準備C_ARSOR_2404試験知能問題集
無料最新SAP Certified Associate C_ARSOR_2404リアル試験問題と回答2026年更新
SAP C_ARSOR_2404 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|
質問 # 22
What does Desktop File Sync/ActiveX do?
- A. It syncronizes responses from suppliers
- B. It streamlines document revisions;
- C. It exports reports directly to MExcel
- D. It generates content in the Sourcing library
正解:B、C
質問 # 23
Which of the following system groups are considered user licenses? Note: there are 2 correct answers to this question.
- A. Commodity Manager
- B. Senior Analyst
- C. Contract Approver
- D. Sourcing Agent
正解:A、D
質問 # 24
You are creating event content in Microsoft Excel.
What can potentially cause errors when you upload a Microsoft Excel file into an SAP Ariba Sourcing event?
Note: There are 3 correct answers to this question.
- A. Adding new rows
- B. Exporting data from one event into another
- C. Creating a system ID for new rows
- D. Editing the column headers
- E. Editing the tab labels
正解:A、D、E
質問 # 25
You are creating a new sourcing event. When would you create and import event content via Microsoft Excel? Note: There are 2 correct answers to this question.
- A. When an individual needs to contribute to content creation but does NOT have an SAP Ariba account
- B. When creating a large number of lots
- C. When loading translations to event content
- D. When a supplier reports a technical issue and CANNOT submit their response
正解:A、B
質問 # 26
Which activity in the sourcing process takes place in SAP Ariba Sourcing? Please choose the correct answer.
- A. Negotiate contract terms.
- B. Analyze supplier bids.
- C. Request periodic changes to supplier information.
- D. Monitor long-term supplier performance.
正解:B
質問 # 27
What setting dictates the language displayed on the supplier user interface?
- A. Prefered language
- B. Locale
- C. Default currency
- D. Browser language
正解:D
質問 # 28
Which auction types must include "Serial" for the event rule "Specify how lot bidding will begin and end"?
Note: there are 2 correct answers to this question.
- A. English reverse auction
- B. Japanese reverse auction
- C. Dutch reverse auction
- D. Traffic light auction
正解:A、C
質問 # 29
What preference needs to be set with a value of 1 or above to make content scorable?
- A. Overall percentage
- B. Importance
- C. Target grade
- D. Weight
正解:B
質問 # 30
Which of the following methods can be used to add suppliers to a sourcing event? There are 2 correct answers to this question.
- A. Search for suppliers using the Ul (Invite Participant button)
- B. Added automatically from a test event
- C. Added automatically from an SAP Ariba Discovery posting
- D. Added manually vie Excel import
正解:A、D
質問 # 31
What SAP Ariba solution allows you to find new suppliers for future events?
- A. SAP Ariba Knowledge
- B. SAP Ariba Supplier Lifecycle and Performance
- C. SAP Ariba Discovery
- D. SAP Ariba Connect
正解:C
質問 # 32
You are a consultant on an SAP S/4HANA Cloud greenfield project. As part of their clean core journey, the customer must analyze the current IT landscape to eliminate redundant systems and establish an efficient architectural design.
Which of the following can you use to do the analysis?
- A. SAP Cloud ALM
- B. SAP Solution Manager
- C. Lean IX
- D. SAP Best Practices
正解:C
質問 # 33
How do suppliers bid in a Dutch reverse auction?
- A. They read the buyers specifications and submit their best price
- B. They submit technical qualifications only with no pricing data
- C. They submit progressively lower bids to beat their competitors
- D. They watch the buyer increase the price periodically and bid at their lowest acceptable price
正解:D
質問 # 34
Which of the following considerations should you keep in mind when using auction templates? Note: There are 2 correct answers to this question.
- A. Price is the most important factor
- B. Expected low competition between strategic and preferred suppliers
- C. Contains high price variance
- D. Runs over a short period of time
正解:C、D
質問 # 35
Which project types can contain custom header fields created within field configuration? Note: there are 3 correct answers to this question.
- A. Sourcing request
- B. Supplier registration questionnaire
- C. Contract workspace
- D. Sourcing project
- E. Knowledge project
正解:A、C、D
質問 # 36
What limitations do large capacity events have outside of the user interface? Note: There are 2 correct answers to this question.
- A. The system limit is 30 terms per line.
- B. The system limits the bidding through Microsoft Excel only.
- C. The system limit is 2000 line items.
- D. The system limit is 125 suppliers.
正解:B、D
質問 # 37
How can a customer run reports that identify the business units assigned to each sourcing project? There are 2 correct answers to this question.
- A. Use the Ship To data for the creator of the sourcing project.
- B. Add a new question to the full sourcing project template.
- C. Create a custom header field and make this field reportable.
- D. Use one of the existing header fields, such as Departments.
正解:C、D
質問 # 38
What activities should be completed before an auction begins?
- A. Conduct practice events for internal stakeholders and suppliers
- B. Identify the strategy for awarding the business
- C. Negotiate contract terms with the suppliers
- D. Initiate the supplier performance management process
- E. Complete supplier outreach and data collection
正解:A、B、E
質問 # 39
Which of the following activities does the SAP Ariba Strategic Sourcing Suite facilitate? Note: there are 2 correct answers to this question.
- A. See supplier inventory in an external application
- B. Send pricing information to external applications
- C. View supplier qualification data
- D. Order direct materials from a supplier
正解:B、C
質問 # 40
You want to ensure that any user creating an event can enable scoring and ensure that participants never see the scoring weights.
What settings do you select in the Scoring Rule section of the event template to achieve this?
- A. Set Enable scoring on participants response to Yes and delegated; Set allow partcipants to see scoring weights to No and Read only
- B. Set Enable scoring on participants response to Yes and delegated; Set allow partcipants to see scoring weights to Yes and delegated
- C. Set Enable scoring on participants response to No and Read only Set allow partcipants to see scoring weights to No and delegated
- D. Set Enable scoring on participants response to Yes and Hidden; Set allow partcipants to see scoring weights to Yes and delegated
正解:A
質問 # 41
Which steps are required to set up a total cost term? Note: there are 3 correct answers to this question.
- A. Add each term to the event template
- B. Set the answer type and acceptable value for all non-numeric terms
- C. Access the sourcing Library for a list of approved terms
- D. Designate if the term is an adder, subtracter, multiplier, or percentage discount
- E. Create a line item within the event
正解:B、D、E
質問 # 42
......
究極な準備用ガイドC_ARSOR_2404認定試験SAP Certified Associate:https://www.passtest.jp/SAP/C_ARSOR_2404-shiken.html
C_ARSOR_2404究極な学習ガイド:https://drive.google.com/open?id=1s4uxFdiN0BknKr8PPUZDTriF2zH_0BMl