お手軽に合格させる 最新SAP C-TS462-2021問題集には82問があります [Q48-Q68]

Share

お手軽に合格させる 最新SAP C-TS462-2021問題集には82問があります

最新のC-TS462-2021学習ガイド2023年最新の- 提供するのはテストエンジンとPDF


SAP C-TS462-2021 認定試験は、SAP S/4HANA Sales 分野における候補者の知識とスキルをテストするために設計されています。この認定は、営業のキャリアを追求し、SAP S/4HANA Sales アプリケーションの専門知識を証明したい個人を対象としています。この試験では、受注管理、価格設定、請求、出荷と輸送、および顧客マスターデータ管理など、さまざまなトピックがカバーされます。

 

質問 # 48
You want to configure that only complete sales documents can be saved. How can you achieve this?

  • A. Set the Dialog Message for Incompletion flag in the configuration of all sales document types.
  • B. Set the No Change Possible flag in the partner determination procedure of the sold-to party.
  • C. Assign an incompleteness procedure to all schedule line categories used in sales.
  • D. Assign an incompleteness procedure to all item categories used in sales.

正解:C


質問 # 49
When an outbound delivery is created for a sales order, from which object does the system determine the default delivery type to be used?

  • A. Sales order item category
  • B. Sales order type
  • C. Shipping point
  • D. Shipping conditions

正解:B


質問 # 50
How is the link between SAP S/4HANA Sales and SAP S/4HANA Finance set up?

  • A. Via a unique assignment of a sales organization to a company code
  • B. Via the general billing interface
  • C. Via the link between a billing document request and an accounting document
  • D. Via a unique assignment of a sales area to a company code

正解:A


質問 # 51
You investigate the standard behavior of the two sales document types Delivery Free of Charge (FD) and Subsequent Delivery Free of Charge (SD). What do you find out? Note: There are 2 correct answers to this question.

  • A. In both cases, materials are priced and billed normally but the shipping is free of charge.
  • B. A Subsequent Delivery Free of Charge has to be created with reference to a preceding document.
  • C. A Delivery Free of Charge is used to deliver material due to a complaint.
  • D. Documents of both document types can use the same item category.

正解:B、D


質問 # 52
Which fields are used to determine the delivery item category? Note: There are 3 correct Answers to this question.

  • A. Higher-level item category
  • B. Shipping point
  • C. Item category group
  • D. Delivery type
  • E. MRP type

正解:A、C、D


質問 # 53
Which controls can you set when you configure a schedule line category? Note: There are 2 correct Answers to this question.

  • A. Delivery relevance
  • B. Goods movement type
  • C. Create delivery group
  • D. Structure scope

正解:A、B


質問 # 54
To what do you assign a material listing procedure?

  • A. Sales organization and sales document type
  • B. Sales area, document pricing procedure, and customer pricing procedure
  • C. Sales document type
  • D. Sales item category

正解:C


質問 # 55
What can you set up in copying control for billing documents? Note: There are 2 correct answers to this question.

  • A. Billing type for cancellation
  • B. Update pricing
  • C. Assignment number
  • D. Update document flow

正解:B、C


質問 # 56
For which type of outline agreement do you determine the material from the item category?

  • A. Scheduling agreement
  • B. Value contract
  • C. Quantity contract
  • D. Condition contract

正解:A


質問 # 57
How can you reduce the maintenance effort for customer master data? Note: There are 2 correct answers to this question.

  • A. Use business partner roles.
  • B. Use the common master data concept.
  • C. Use customer-vendor integration.
  • D. Use multi-address handling.

正解:A、B


質問 # 58
You are using incompleteness procedures in your system. To which elements can they be assigned? Note:
There are 3 correct answers to this question.

  • A. Schedule line category
  • B. Item category
  • C. Partner function
  • D. Business partner category
  • E. Material type

正解:A、B、C


質問 # 59
You want to automatically supply your customers with another material if the ordered material is not available.
How would you do this?

  • A. Deactivate the material availability check and use material determination instead.
  • B. Create a material listing that includes both the ordered and substitution materials.
  • C. Ensure future replenishments of the ordered material are excluded from the material availability check.
  • D. Create a material determination record with an appropriate substitution reason.

正解:B


質問 # 60
You are configuring the organizational structure in your system. Which assignments are possible? Note: There are 3 correct answers to this question.

  • A. Assign multiple distribution channels to one company code.
  • B. Assign a plant to multiple sales organizations/distribution channels.
  • C. Assign a shipping point to multiple plants.
  • D. Assign multiple plants to one company code.
  • E. Assign multiple loading points to a plant.

正解:B、C、D


質問 # 61
Which of the following are characteristics of an invoice list process? Note: There are 2 correct answers to this question.

  • A. You must create an invoice list at specified time intervals or on specific dates.
  • B. You use preliminary billing documents for the invoice list creation.
  • C. You must set up a periodic billing plan for the invoice list creation.
  • D. You must send the payer a single invoice list instead of the individual invoices.

正解:A、D


質問 # 62
Which of the following settings are required to be able to deliver a product? Note: There are 2 correct answers to this question.

  • A. You need to set up the item category as relevant for delivery-related billing.
  • B. You need to set the Item Relevant for Delivery indicator in the item category.
  • C. You need to set the Schedule Lines Allowed indicator in the item category.
  • D. You need to set up copying control in Logistics Execution System for the item category.

正解:A、C


質問 # 63
How can you enable partial deliveries for a sales order, while making sure to get as few deliveries as possible?

  • A. In each order item, set complete delivery to be required.
  • B. In each order item, set the appropriate delivery block.
  • C. In the order header, set the Complete Delivery indicator.
  • D. In each order item, set partial deliveries to be allowed.

正解:D


質問 # 64
To avoid critical situations in demand and procurement, the material availability check can be combined with product allocations. Which benefit can be achieved by this?

  • A. Material requirements can be reduced.
  • B. Procurement costs can be reduced.
  • C. Picking processes can be accelerated.
  • D. Goods distribution can be optimized.

正解:B


質問 # 65
Which time components are used to calculate the confirmed delivery date in a sales order? Note: There are 2 correct Answers to this question.

  • A. Transit time of the route
  • B. Loading time of the shipping point
  • C. Pick/pack time of the warehouse number
  • D. Transportation lead time of the forwarding agent

正解:B、C


質問 # 66
What is a prerequisite for billing?

  • A. You need a sales document type that is configured to be billing relevant.
  • B. You need an order item category that is configured to be billing relevant.
  • C. You need a billing document request for which a goods issue was posted.
  • D. You need a delivery type for which the invoicing date was determined.

正解:B


質問 # 67
You want to use condition exclusion. For which of the following pricing elements can you set the condition exclusion indicator? Note: There are 2 correct Answers to this question.

  • A. Condition type groups
  • B. Condition record
  • C. Condition category
  • D. Condition type

正解:B、D


質問 # 68
......

C-TS462-2021問題集と試験テストエンジン:https://www.passtest.jp/SAP/C-TS462-2021-shiken.html

最新版を今すぐ試そうC-TS462-2021練習テスト問題解答:https://drive.google.com/open?id=1incM0l1vvxn6LEd-mkNkmqVAsDmU6XaH