最新の[2024年08月24日] 実際に出る検証済みのC-ACT-2403問題集 [Q37-Q55]

Share

最新の[2024年08月24日] 実際に出る検証済みのC-ACT-2403問題集

合格させるSAP C-ACT-2403試験更新されたのは84問があります

質問 # 37
Which additional scope option does the strategic advisory service for cloud analytics offer?Note: There are 2 correct answers to this question

  • A. Extended package
  • B. SAP Activate methodology for the Intelligent Enterprise
  • C. SAP S/4HANA for central finance
  • D. Baseline package

正解:A、D

解説:
* A is correct because the extended package is an additional scope option that the strategic advisory service for cloud analytics offers. It provides a deeper analysis of the customer's current analytics landscape and a more detailed roadmap for the cloud analytics transformation.
* C is correct because the baseline package is an additional scope option that the strategic advisory service for cloud analytics offers. It provides a high-level assessment of the customer's current analytics landscape and a general roadmap for the cloud analytics transformation. Verified References:
* : Strategic Advisory Service for Cloud Analytics


質問 # 38
For which of the following products do you find a specific set of best practices for the public sector?

  • A. SAP Marketing Cloud
  • B. SAP S/4HANA
  • C. SAP SuccessFactors Employee Central
  • D. SAP S/4HANA Cloud, public edition

正解:B

解説:
SAP S/4HANA is one of the products for which you can find a specific set of best practices for the public sector. The best practices for SAP S/4HANA for Public Sector provide guidance on how to implement and configure SAP S/4HANA to support the business processes and requirements of public sector organizations, such as budgeting, grants management, fund accounting, and tax and revenue management.


質問 # 39
Which of the following is a key characteristic of the Agile project approach?

  • A. Frequent quality gates
  • B. Iterative build with frequent inspections
  • C. Frequent and detailed project scheduling
  • D. Formal and detailed documentation

正解:B

解説:
D is correct because Iterative build with frequent inspections is a key characteristic of the Agile project approach. The Agile project approach follows an iterative and incremental development process, where the solution is built and delivered in small increments called sprints. Each sprint consists of planning, designing, building, testing, and reviewing activities, where the team inspects the solution and adapts to changing requirements and feedback


質問 # 40
What is the primary purpose of the SAP Activate methodology?

  • A. To manage solution documentation
  • B. To enable access to the SAP ecosystem
  • C. To expedite all deployment options for SAP products
  • D. To provide end-to-end application lifecycle management

正解:C

解説:
C is correct because expediting all deployment options for SAP products is the primary purpose of the SAP Activate methodology. The SAP Activate methodology is a framework that provides guidance and best practices for implementing SAP solutions in different scenarios, such as cloud, on-premise, or hybrid. The SAP Activate methodology aims to accelerate and simplify the deployment process by combining ready-to-run business processes, proven implementation practices, and guided configuration tools.


質問 # 41
What is the purpose of the scrum board?

  • A. To show the functional breakdown of the solution scope
  • B. To manage the resource load
  • C. To visualize team progress
  • D. To document the results of the Integration Test

正解:C

解説:
* A is correct because the scrum board is a tool that helps to visualize the team progress and status of the user stories in each sprint. It shows the movement of the user stories from the product backlog to the done column, indicating the completion of the sprint goal. Verified References:
* : SAP Activate Project Management Certification Guide, page 113


質問 # 42
In which phase do you collect the main attributes of the product as per the Agile definition?

  • A. Explore
  • B. Prepare
  • C. Deploy
  • D. Realize

正解:A

解説:
According to the SAP Activate methodology for SAP S/4HANA Cloud, the Explore phase is where you collect the main attributes of the product as per the Agile definition. The main attributes of the product are the features, requirements, and user stories that describe what the product should do and how it should deliver value to the customers and stakeholders. The Explore phase involves a fit-to-standard process, where you validate the fit of your business processes to the standard SAP solution and identify any gaps or extensions that need to be addressed. You also prioritize and refine your product backlog, which is a list of user stories that represent the work needed to achieve the product vision1.


質問 # 43
What is preferred when a customer wants to keep most of their original processes and migrate to SAP S/4HANA Cloud, private edition?

  • A. Mix and Match
  • B. Selective Data Transition
  • C. Shell Conversion
  • D. System Conversion

正解:C

解説:
* Shell Conversion is preferred when a customer wants to keep most of their original processes and migrate to SAP S/4HANA Cloud, private edition. It involves creating a shell system that contains the configuration and master data of the source system, and then migrating the transactional data to the target system. Verified References:
* : SAP Activate Project Management Certification Guide, page 128


質問 # 44
You are transitioning to SAP S/4HANA.In which phase do you adjust custom code?

  • A. Discover
  • B. Explore
  • C. Deploy
  • D. Realize

正解:D

解説:
* A is correct because in the Realize phase, you adjust custom code when transitioning to SAP S/4HANA.
Custom code is the code that was developed by the customer or a partner to extend or modify the standard SAP functionality. Custom code needs to be adjusted to ensure compatibility and performance with SAP S/4HANA, as well as compliance with the simplification items and coding guidelines.
Verified References:
* : [SAP Activate Methodology for SAP S/4HANA On Premise], page 22


質問 # 45
Which of the following are levels in the structure of an SAP Best Practices for SAP S/4HANA Solution Package?Note: There are 2 correct answers to this question.

  • A. Business Process Scenarios
  • B. Building Blocks
  • C. Configuration Guides
  • D. Scope Items

正解:B、D

解説:
* B is correct because Scope Items are one of the levels in the structure of an SAP Best Practices for SAP S/4HANA Solution Package. A Scope Item is a unit of business functionality that covers one or more business processes. A Scope Item has a description, a list of configuration steps, and a set of test cases.
* C is correct because Building Blocks are one of the levels in the structure of an SAP Best Practices for SAP S/4HANA Solution Package. A Building Block is a reusable component that contains configuration data, master data, or transactional data for a specific business area. A Building Block can be assigned to one or more Scope Items. Verified References:
* : [SAP Best Practices Explorer]


質問 # 46
What are the responsibilities of the product owner in release and sprint planning? Note: There are 2 correct answers to this question

  • A. Analyze the functional and technical dependencies between user stories
  • B. Prioritize backlog user stories by business priority.
  • C. Define objectives for each release
  • D. Estimate the backlog user stories.

正解:B、C

解説:
* A is correct because prioritizing backlog user stories by business priority is one of the responsibilities of the product owner in release and sprint planning. The product owner decides which user stories are more important and valuable for the customer and orders them accordingly in the product backlog.
* B is correct because defining objectives for each release is one of the responsibilities of the product owner in release and sprint planning. The product owner sets the goals and expectations for each release, based on the customer's vision and feedback, and communicates them to the project team and stakeholders. Verified References:
* : SAP Activate Project Management Certification Guide, page 112


質問 # 47
Which systems are part of the private cloud edition landscape?Note. There are 2 correct answers to this question.

  • A. Evaluation
  • B. Starter
  • C. Production
  • D. Sandbox

正解:C、D

解説:
* A is correct because Production is one of the systems that are part of the private cloud edition landscape.
The Production system is the system where the solution is deployed and operated for the end users. It contains the live data and processes of the customer's business.
* B is correct because Sandbox is one of the systems that are part of the private cloud edition landscape.
The Sandbox system is an optional system that can be used for testing, prototyping, or training purposes.
It is a copy of the Production system that can be refreshed on demand.


質問 # 48
What transition scenarios are possible when adopting RISE with SAP? Note; There are 3 correct answers to this question.

  • A. Lift and Shift
  • B. Shell Conversion
  • C. System Conversion
  • D. Mix and Match
  • E. New Implementation

正解:A、C、E

解説:
* B is correct because Lift and Shift is one of the transition scenarios that are possible when adopting RISE with SAP. Lift and Shift is a scenario where the customer moves their existing SAP system to the cloud without changing the code or configuration. It is suitable for customers who want to reduce their infrastructure costs and complexity, and prepare for future innovation.
* C is correct because New Implementation is one of the transition scenarios that are possible when adopting RISE with SAP. New Implementation is a scenario where the customer sets up a new SAP S/4HANA system in the cloud with predefined configuration and data migration from their legacy system. It is suitable for customers who want to adopt the latest SAP innovations and best practices, and simplify their business processes.
* E is correct because System Conversion is one of the transition scenarios that are possible when adopting RISE with SAP. System Conversion is a scenario where the customer converts their existing SAP ERP system to SAP S/4HANA in the cloud, while preserving their data and customizations. It is suitable for customers who want to leverage the benefits of SAP S/4HANA, such as improved performance, user experience, and analytics, and retain their existing business processes. Verified References:
* : RISE with SAP - Business Transformation as a Service
* : RISE with SAP - Transition Scenarios


質問 # 49
When performing an SAP Readiness Check in system conversion, what areas are covered within the result?Note: There are 3 correct answers to this question

  • A. Simplification database
  • B. Active business functions
  • C. SAP and third party interfaces
  • D. Recommended SAP Fiori apps
  • E. Sizing for SAP S/4HANA

正解:A、D、E

解説:
* A is correct because SAP Readiness Check in system conversion covers the area of recommended SAP Fiori apps, which are apps that are suggested by SAP based on the customer's current usage of SAP GUI transactions.
* C is correct because SAP Readiness Check in system conversion covers the area of sizing for SAP S/4HANA, which is an estimation of the hardware and software resources required to run SAP S/4HANA based on the customer's current system data.
* E is correct because SAP Readiness Check in system conversion covers the area of simplification database, which is a collection of simplification items that describe the changes and adaptations required for SAP S/4HANA compared to the previous SAP ERP releases. Verified References:
* : SAP Readiness Check 2.0 for SAP S/4HANA


質問 # 50
Which of the following characteristics relate to the Focused Build for SAP Solution Manager functionality?
Note: There are 2 correct answers to this question.

  • A. SAP delivers a standard solution with its own separate license
  • B. SAP delivers all configuration activities within your project
  • C. SAP delivers a standard solution without any additional coding required
  • D. SAP delivers all knowledge required with the solution.

正解:C、D

解説:
* A is correct because SAP delivers all knowledge required with the solution as part of the Focused Build for SAP Solution Manager functionality. Focused Build provides pre-configured standard SAP Solution Manager features and processes, as well as additional build functions, such as requirements management, change request management, test management, and release management. Focused Build also provides best practices, methodologies, and templates to support the implementation of SAP solutions.
* C is correct because SAP delivers a standard solution without any additional coding required as part of the Focused Build for SAP Solution Manager functionality. Focused Build is a ready-to-run and integrated tool that enables customers to manage requirements and software development in large, agile projects. Focused Build does not require any additional coding or customization to use its features and functions. Verified References:
* : Focused Build for SAP Solution Manager
* : All About Focused Build in SAP Solution Manager 7.2


質問 # 51
Which of the following are Selective Data Transition scenarios? Note: There are 3 correct answers to this question

  • A. Consolidation
  • B. Migration of open items
  • C. Migration of selected applications
  • D. Migration of business units
  • E. Migration of transactional data

正解:A、D、E

解説:
* A is correct because migration of business units is one of the Selective Data Transition scenarios. It allows the customer to move specific business units or company codes from their source system to SAP S/4HANA, while keeping the rest of the system unchanged.
* B is correct because consolidation is one of the Selective Data Transition scenarios. It allows the customer to merge multiple source systems into one SAP S/4HANA system, while harmonizing and simplifying the data and processes.
* E is correct because migration of transactional data is one of the Selective Data Transition scenarios. It allows the customer to move selected transactional data (such as open items, balances, and documents) from their source system to SAP S/4HANA, while preserving the historical data in the source system.
SAP Activate Project Management Certification Guide, page 128


質問 # 52
Which of the following is part of the Explore phase in the "New Implementation of SAP S/4HANA Cloud, public edition" transition path?

  • A. Simplification and Custom Code Impact Analysis
  • B. Setup and Enablement
  • C. Fit-to-standard
  • D. Solution Validation and Delta Design

正解:C

解説:
* B is correct because Fit-to-standard is part of the Explore phase in the "New Implementation of SAP S/4HANA Cloud, public edition" transition path. Fit-to-standard is a process where the customer validates the fit of their business processes to the standard SAP S/4HANA Cloud solution and identifies any gaps or extensions that need to be addressed. Fit-to-standard is performed using a series of workshops where the customer reviews the best practice processes and scenarios provided by SAP and compares them with their own requirements. Verified References:
* : SAP Activate Methodology for SAP S/4HANA Cloud, page 18
* : SAP Activate - Explore Phase: Use Fit-to-Standard to Confirm Business Process Fit and Identify Gaps in Your SAP S/4HANA Cloud Implementation


質問 # 53
From which platform are you able to deploy a trial system within a short timeframe?

  • A. SAP Cloud Appliance Library
  • B. SAP Support Portal
  • C. SAP Learning Hub
  • D. SAP Business Technology Platform

正解:A

解説:
* D is correct because SAP Cloud Appliance Library is the platform from which you can deploy a trial system within a short timeframe. SAP Cloud Appliance Library is a service that allows you to access and provision preconfigured SAP solutions in the cloud, such as SAP S/4HANA, SAP HANA, or SAP Business Suite. You can choose from various cloud providers, such as Amazon Web Services, Microsoft Azure, or Google Cloud Platform, and deploy a trial system in minutes. Verified References:
* : SAP Cloud Appliance Library


質問 # 54
Which of the following considerations apply when determining the project methodology? Note: There are 3 correct answers to this question.

  • A. Project Manager fit
  • B. Project fit
  • C. Solution fit
  • D. Organizational fit
  • E. Implementation fit

正解:B、D、E

解説:
* A is correct because implementation fit is one of the considerations that apply when determining the project methodology. It means that the project methodology should match the type and scope of the implementation, such as cloud, on-premise, hybrid, or mixed scenarios.
* C is correct because organizational fit is one of the considerations that apply when determining the project methodology. It means that the project methodology should suit the culture and maturity of the organization, such as its readiness for change, agility, and innovation.
* D is correct because project fit is one of the considerations that apply when determining the project methodology. It means that the project methodology should align with the characteristics and constraints of the project, such as its size, complexity, duration, and budget. Verified References:
* : SAP Activate Methodology for SAP S/4HANA Cloud, page 13


質問 # 55
......

今すぐ試そう2024年最新の無料更新されたSAP C-ACT-2403試験問題と解答:https://www.passtest.jp/SAP/C-ACT-2403-shiken.html

C-ACT-2403問題集PDFとテストエンジン試験問題:https://drive.google.com/open?id=1vrKEN9QYYKtduDiKKvB4cAYwKWXmq20p