
最新の[2025年10月17日] 実際に出る検証済みのE_S4HCON2023問題集
合格させるSAP E_S4HCON2023試験更新されたのは82問があります
SAP E_S4HCON2023 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
質問 # 44
During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Response:
- A. Creation of the table structures in the new SAP HANA database
- B. Execution of eCATTs for business validation tests
- C. Execution of SPDD modification adjustment
- D. Execution of SPAU modification adjustment
- E. Execution of XPRAs and AIMs
正解:B、D、E
質問 # 45
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?
- A. The repetition option allows you to run the migration without a shadow system
- B. The benchmaking option allows you to migration a specified set of tables
- C. The benchmaking option allows you to repeat the uptime migration
- D. The repetition option allows you to repeat the complete migration
正解:B
質問 # 46
You are starting an SAP S/4HANA Conversion. The scenario strategy Downtime Optimized Conversion (DoC) is NOT selectable.What could be the reason?
- A. The SAP S/4HANA Conversion is without DMO.
- B. The start release is too old for DOC.
- C. The source database is not supported
- D. The SAP S/4HANA Conversion includes a DMO.
正解:C
質問 # 47
Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?
- A. Downtime Optimized DMO (DoDMO)
- B. Downtime Optimized Data Conversion (DoC)
- C. Near-Zero Downtime Technology (NZDT)
- D. Near-Zero Downtime Maintenance (nZDM)
正解:C
質問 # 48
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.
- A. The path was stored in file host_profile during registration
- B. The path is taken from the URL entered in the browser to start SUM
- C. The path was stored in file sumabap conf during registration
- D. The path was stored to the environment of user <sid>adm during registration
正解:C
質問 # 49
You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.
- A. Conversion
- B. Migration
- C. Software update
- D. Main import
正解:A、B
質問 # 50
You have selected "Standard" as scenario strategy in the SUM tool. Which steps take place via the shadow instance? Note: There are 2 correct answers to this question.
- A. Modification adjustment (SPDD)
- B. Modification adjustment (SPAU)
- C. Activation of dictionary objects (ACT_UPG)
- D. Conversion of application tables (PARCONV_UPG)
正解:A、C
質問 # 51
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:
- A. Activation of dictionary objects in phase ACT_UPG
- B. Import of upgrade and language data from the download directory in phase TABIM UPG
- C. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
- D. Import of dictionary objects from the download directory in phase DDIC_UPG
- E. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
正解:A、B、D
質問 # 52
During the upgrade of your development system, you run into the adjustment of non-dictionary objects handled by transaction SPAU There you find programs that are shown in status "automatic adjustment (green traffic tight). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?
- A. SUM continues with the next phase and your modifications are lost
- B. SUM continues with the next phase and your modifications are kept as In the start release
- C. SUM refuses to continue unless you have marked a transport request as modification adjustment transport
- D. Before continuing with the next phase SUM asks for a modification adjustment transport
正解:B
質問 # 53
What do you need to consider when performing the SI checks for an SAP S'4I 1ANA conversion? Note There are 2 correct answers to this question.
- A. The errors from the SI checks must be solved, otherwise. SUM will report an error
- B. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework
- C. The SI checks are executed in the development system and the results are transported into the subsequent systems
- D. You need to build up an SI check framework by applying SAP Notes
正解:B、D
質問 # 54
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.
- A. SAP Solution Manager 7.2
- B. SAP ECC system from SAP ERP 6.0 EHP 8
- C. SAP S/4HANA Server 1809 and above
- D. Standalone AS ABAP with SAP_BASIS 752 and above
正解:C、D
質問 # 55
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:
- A. Phases DIFF*
- B. Phases EU_IMPORT*
- C. Phase RUN_RSPTBFIL _ISUTABU
- D. Phase RUN_RSDBSCPY
- E. Phase DOWNCONF_DTTRANS
正解:A、B、E
質問 # 56
During a SUM run, you want to check if the PARCONV_UPG phase is still running properly. Where can you find information about this? Note: There are 2 correct answers to this question.
- A. Check for running R3trans processes on the host where SUM is running.
- B. Check for running R3load processes on the host where SUM is running.
- C. Check the running batch job via Job Overview (SM37).
- D. Check the latest log files in the SUM directory, subdirectory abap, subdirectory tmp.
正解:C、D
質問 # 57
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:
- A. Check the most recent entries shown in file sapevt.trc
- B. Check the most recent entries in SAPup.log
- C. Check the system log (transaction SM21) of the SAP system
- D. Check the messages shown by the SUM UI
正解:B、D
質問 # 58
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:
- A. Using the database migration option (DMO) for SUM
- B. Using the main configuration option "Standard" when applying SAP Support Packages
- C. Using the main configuration option "Single System" in case of an upgrade.
- D. Using the main configuration option "Single System" when installing an Add-On
正解:D
質問 # 59
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:
- A. In DMO Migration Preparation
- B. In SUM Phaselist
- C. In Process Control Center
- D. In SUM Parameters
正解:C、D
質問 # 60
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.
- A. Dual Stack split
- B. Database migration
- C. Support Package Stack update
- D. Homogenous system copy
- E. Release upgrade
正解:B、C、E
質問 # 61
......
今すぐ試そう2025年最新の無料更新されたSAP E_S4HCON2023試験問題と解答:https://www.passtest.jp/SAP/E_S4HCON2023-shiken.html
E_S4HCON2023問題集PDFとテストエンジン試験問題:https://drive.google.com/open?id=13baCHSHo-y8xW6WAT_kAiG7Pj3Ji0qeQ