質問 # 20
All projects use only a single simplified workflow which has three statuses (Open, In Progress, Closed) and all global transitions.
You need to find all issues that were in the Closed status at some point in their lifecycle.
Select the correct JQL query.

  • A. status = Closed OR (status WAS Closed AND status = Open)
  • B. status WAS Closed
  • C. status CHANGED TO Open
  • D. status CHANGED FROM "In Progress" TO Closed

正解:D


質問 # 21
Malik is a project administrator for the HR project. He cannot remove the Fix Version/s field from the HR project screen.
Why is he NOT able to do this?

  • A. System fields cannot be removed from screens.
  • B. Fix Version/s for the project have been archived.
  • C. The Fix Version/s field is locked.
  • D. Fix Version/s is a required field.
  • E. The screen is used by another project.

正解:B


質問 # 22
A project uses two issue types named Task and Sub-task which share the workflow shown below.

What is the maximum number of screens that can be used in the current project configuration?

  • A. 0
  • B. 1
  • C. 2
  • D. 3
  • E. 4

正解:B


質問 # 23
It's common practice in your organization to archive projects in the following way:
- The name of archived projects will get the prefix ARCH_
- Archived projects will be assigned the project category ARCHIVE Recently many projects were archived.
Which JQL query will tell you if there are any unresolved issues in those projects?

  • A. category = ARCHIVE AND resolution = NULL
  • B. category = ARCHIVE and resolution EQUALS EMPTY
  • C. project CHANGED TO "ARCH_*" AND resolution IS EMPTY
  • D. project in ARCHIVE() AND resolution = Unresolved
  • E. key ~ "ARCH_*" AND resolution IS EMPTY
  • F. project ~ "ARCH_*" AND resolution = Unresolved

正解:B


質問 # 24
Below you are shown an extract of a field configuration used by all issue types in your project.

The field 'A detailed description' is a custom field of type Text field (multi-line).
Which two statements are true? (Choose two.)

  • A. Users will be able to format text in the field.
  • B. The project is configured to use only a single screen.
  • C. The field is mandatory in each issue type used in the project.
  • D. The field can only be used in combination with the Description system field.
  • E. The maximum text length is limited to 100 characters.

正解:A、D


質問 # 25
In my project, I can create issues and assign them to other users.
However, the other users are not able to assign issues to me.
What are two possible reasons for this? (Choose two.)

  • A. The other users do not have the Assignable User permission.
  • B. The other users do not have the Edit Issues permission.
  • C. The other users do not have the Assign Issues permission.
  • D. I do not have the Assignable User permission.
  • E. I am not a component lead.

正解:B、C


質問 # 26
Fixing a single bug requires the involvement of three teams: Designers, Developers and Testers.
Currently, all the fields that are needed by each of the three teams are together on a single project screen.
As a project administrator, how can you help the teams to easily identify the fields they need?

  • A. Group individual fields by team and place them on separate tabs.
  • B. Request a separate issue type and issue type scheme for each team.
  • C. Make fields available only for the team that needs them.
  • D. Use the card colors feature to color-code the fields by team.
  • E. Request individual team screens to be associated with the Edit Issue operation.

正解:E


質問 # 27
As the project administrator for the DEV project you are also responsible for managing the team's board and various filters being used on the team's dashboard. They asked you to add a new status called Testing to the project's workflow.
What two other changes might be required? (Choose two.)

  • A. The workflow screens need to be updated to reflect the new status.
  • B. The filters need to be updated to reflect the changes.
  • C. Project permissions need to be updated so users can transition to the new status.
  • D. The new status needs to be mapped to a column on the board.
  • E. The workflow has to be mapped to the issue types used in the project.

正解:C、E


質問 # 28
Elaine is the project administrator for the Finance project.
The team requests a brand new field called Currency. It must be added to the screen used on the Approval transition.
How can these requirements be met?

  • A. Elaine can create the field and add it to the screen.
  • B. A Jira administrator must create the field and add it to the screen.
  • C. A Jira administrator must create the field but Elaine can add it to the screen.
  • D. Elaine can create the field but a Jira administrator must add it to the screen.

正解:B


質問 # 29
An extract of a permission scheme is shown below.

Jennifer Evans needs to be able to:
- Manage project role membership
- Log time to issues
What is the minimum number of project roles she needs?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

正解:C


質問 # 30
As a project administrator, what changes can you make to the project sidebar?

  • A. display project team members
  • B. remove links to Reports
  • C. add a URL and link text
  • D. display project descriptions
  • E. change the background color

正解:B


質問 # 31
You need a way to put issues On Hold.
Additionally you need to filter for all issues that:
- were put On Hold by user Dave
- were put On Hold in the last 30 days
The current workflow is shown below:

Which combination of configuration items will meet the requirements?

  • A. Transition, custom field (User Picker)
  • B. Transition, post-function
  • C. Screen, custom field (Date picker)
  • D. Status, screen
  • E. Status, transitions

正解:C


質問 # 32
John needs to configure an Issue Collector where he is the reporter of all the collected issues.
Which two permissions does he need to do this? (Choose two.)

  • A. Assignable User
  • B. Administer Projects
  • C. Transition Issues
  • D. Create Issues
  • E. Add Comments

正解:B、D


質問 # 33
You are asked to create a dashboard to meet these requirements:
- Viewers can easily see the number of issues assigned to each team member.
- Viewers can see the percentage of work currently assigned to each team member.
- Viewers are presented with a graphical view of the distribution of the work assigned to team members.
- Gadgets display unassigned issues.
Which combination of gadgets should you use?

  • A. Issue Statistics and Pie Chart
  • B. Pie Chart and Two Dimensional Filter Statistics
  • C. Activity Stream and Pie Chart
  • D. Two Dimensional Filter Statistics and Created vs. Resolved Chart
  • E. Filter Results and Issue Statistics

正解:E


質問 # 34
Which two can project administrators associate with project roles? (Choose two.)

  • A. Individual users
  • B. Application access
  • C. Global permissions
  • D. Security levels
  • E. Groups
  • F. Project permissions

正解:D、E


質問 # 35
You work for an insurance company and want to use Jira for tracking customers and their contracts.
Before requesting a new project you have gathered some requirements:
- Each customer can have multiple contracts.
- Each contract can have an independent status.
- Each contract will be worked on by a different agent.
- Contracts cannot exist without a corresponding customer.
How should contracts be configured?

  • A. as tabs on a screen
  • B. as workflow statuses
  • C. as sub-task issue types
  • D. as fields on a screen

正解:B


質問 # 36
You are asked to change who receives notifications when issues are moved.
The settings in the default notification scheme used by your project are shown in the table below.

As a project administrator, why are you NOT able to update the notification scheme?

  • A. The extended project administration option is not enabled.
  • B. You are not a Jira administrator.
  • C. The default notification scheme cannot be edited.
  • D. The notification scheme is shared.

正解:B


質問 # 37
A project administrator wants to modify his project screen. The project screen meets all the prerequisites for him to be able to edit it.
Which two actions can he NOT perform? (Choose two.)

  • A. Make a field required
  • B. Rename a tab
  • C. Move a tab
  • D. Rearrange existing fields
  • E. Remove a field
  • F. Create a new field

正解:A、F


質問 # 38
The extract of a permission scheme is shown below.

Clare is joining your team to help out as first-level support.
Her job will be:
- Analyze incoming requests
- requests to subject matter experts
Which two project roles will she need? (Choose two.)

  • A. Editors
  • B. Assignables
  • C. Workers
  • D. Viewers
  • E. Assigners
  • F. Administrators

正解:D、E


質問 # 39
......


ATLASSIAN ACP-610 (Managing Jira Projects for Data Center) 試験は、主要なソフトウェア開発企業である Atlassian によって提供される認定プログラムです。この試験は、ソフトウェアプロジェクトを管理するために Jira Data Center を使用する専門家の知識とスキルをテストするために設計されています。この認定は、業界で高く評価され、Jira Data Center を使用してソフトウェアプロジェクトを管理する個人の専門知識を証明するものです。

 

更新されたテストエンジン練習ACP-610問題集と練習試験で使おう:https://www.passtest.jp/ATLASSIAN/ACP-610-shiken.html

問題集お試しセットACP-610テストエンジン問題集トレーニングには77問あります:https://drive.google.com/open?id=1xZzoofiwCWZd02jemtlEnIwiyEXawUD5