質問 # 17
Which of the following are capabilities of the Manage Forecast Error Calculations - Inventory Optimization app?Note: There are 2 correct answers to this question.
- A. Adjust Safety Stock Recommendations based on forecast error CV input
- B. Identifiy intermittent demand for Forecast Error CV calculations
- C. Propagate forecast error to upstream locations in a supply chain network
- D. Adjust for forecast bias in Forecast Error CV calculations
正解:A、D
質問 # 18
You created a key figure and want to add calculations.Which of the following rules do you consider?Note: There are 2 correct answers to this question.
- A. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
- B. Key figures can be calculated across different planning levels.
- C. The calculation chain for a key figure must always result in a calculated key figure.
- D. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.
正解:A、B
質問 # 19
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note:
There are 3 correct answers to this question.
- A. You can add (or delete) planning objects to a planning view after these filters are applied.
- B. These filters are always applied based on the values stored in the database.
- C. The alerts dashboard is not available if a value-based filter is set for the open planning view.
- D. These filters can be used together with attribute totals in the same planning view.
- E. You can only apply one value-based filter per planning view.
正解:B、C、E
質問 # 20
Which sets of chart types are provided within the Analytics Advanced application?Note: There are 3 correct answers to this question.
- A. Trend Chart Types
- B. Seasonal Chart Types
- C. Geographic Chart Types
- D. Comparison Chart Types
- E. Simulation Chart Types
正解:A、B、D
質問 # 21
What are the possible ways that an attribute intended for use as an attribute as a key figure can be created and assigned?
- A. Created as type NVARCHAR and assigned to an external master data type
- B. Created as type DECIMAL and assigned to a compound master data type
- C. Created as type INTEGER and assigned to a compound master data type
- D. Created as type INTEGER and assigned to a simple master data type
正解:B
質問 # 22
Which of the following key functions are supported by SAP IBP for sales and operations?Note: There are 2 correct answers to this question.
- A. Simple statistical forecast
- B. Multi-Level Supply Planning Heuristics
- C. Time series analysis
- D. Scenario analysis for operational supply planning
正解:A、B
質問 # 23
What are some of the prerequisites for configuring a planning area that results in a successful consistency check?Note: There are 2 correct answers to this question.
- A. Configure at least one calculated key figure for the planning area.
- B. Specify a planning horizon in the planning area for each level of the assigned time profile.
- C. Configure at most two input key figures on the same planning level in a key figure calculation.
- D. Assign the compound master data type and its component master data types.
正解:B、D
質問 # 24
You are invited to review a problem with a customer's SAP IBP Excel template performance.What areas with the biggest potential performance impact would you focus on?Note: There are 2 correct answers to this question.
- A. Complex calculation graphs for key figures
- B. Excessive SAP IBP formatting in the Microsoft Excel UI
- C. Number of analytics charts displaying key figures' values
- D. Number of local members and complexity of calculations
正解:A、B
質問 # 25
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note: There are 3 correct answers to this question.
- A. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
- B. It checks whether the sourcing in the Production Source Item Master Data type exists.
- C. It checks whether the required planning level master data exists for a subset of input key figures.
- D. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
- E. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
正解:A、C、E
質問 # 26
You need to create time periods for the time profile in a planning area.What should you be aware of when running the Create Time Periods application job?
- A. A time profile has to be activated so that the application job can proceed.
- B. The assigned Planning Area must be active.
- C. In the Parameter Section of the application job, choose the Time Profile ID and Planning Area.
- D. This application job can be run for multiple time profiles at once.
正解:C
質問 # 27
Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes? Note: There are 2 correct answers to this question.
- A. Decoupling Points determination in SAP IBP for demand-driven replenishment
- B. Charts creation in SAP Supply Chain Control Tower
- C. Demand Sensing with Gradient Boosting (Full)
- D. Supply Heuristics in SAP IBP for sales and operations
正解:C、D
質問 # 28
Which of the following solutions are feasible when using the time series supply optimizer?Note: There are 3 correct answers to this question.
- A. Not-fully satisfied demands
- B. Not respecting production capacity
- C. Not adhering to maximum transport values
- D. Violation of minimum aggregated inventory values
- E. Violation of minimum resource utilization
正解:A、D、E
質問 # 29
Analytics charts are created by the user in the Advanced Analytics application.What can the user do in the Advanced Analytics app?Note: There are 2 correct answers to this question.
- A. Merge charts together.
- B. Apply filters on your data.
- C. Open graphics in Excel.
- D. Group data.
正解:B、D
質問 # 30
How can the SAP IBP scenario modeling functionality support business users in the S&OP planning cycle?Note: There are 2 correct answers to this question.
- A. Simulate statistical forecast at the Demand Review stage
- B. Model inventory turns based on Target Safety stocks
- C. Simulate demand sensing inputs for Supply Review
- D. Simulate heuristics run in Supply Review stage
正解:A、D
質問 # 31
What do you need to be aware of when using multiple pairs of key figures in one copy operator? Note: There are 2 correct answers to this question.
- A. If necessary target key figures values are disaggregated.
- B. Copying multiple key figures on different planning levels is not possible.
- C. If necessary source key figures values are disaggregated.
- D. Copying multiple key figures can be processed sequentially.
正解:C、D
質問 # 32
You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed?Note: There are 2 correct answers to this question.
- A. Prioritization of demand elements one by one is achieved by unconstrained heuristics.
- B. Push and Pull production models are used by the optimizer.
- C. Planning results can be generated faster by the optimizer.
- D. Finite heuristics can achieve demand prioritization and pegging.
正解:B、D
質問 # 33
You need to define a new logic for a key figure to drive values from the PERPRODCUSTREGION level to the PERPRODCUST level.Which of the following configuration options are possible for this process?Note: There are 2 correct answers to this question.
- A. Splitting the values from aggregated to detailed level, based on a stored split-factor key figure
- B. Splitting the values from aggregated to detailed level using multiplication by the proportions
- C. Splitting the values from aggregated to detailed level, based on the time profile attribute
- D. Splitting the values from detailed to aggregated level by using a copy operator
正解:A、B
質問 # 34
What actions can be performed in the Advanced Dashboards application?Note: There are 3 correct answers to this question.
- A. Use drill-down functionality.
- B. Add process templates.
- C. Rename the charts.
- D. Display all assigned analytics on a single UI.
- E. Link two analytics charts.
正解:A、B、D
質問 # 35
What are the relevant use cases for helper key figures?Note: There are 2 correct answers to this questions.
- A. Used at any level of calculation level except the Request Level
- B. Used by end-users in planning views to help visualize cross-period calculations
- C. Used when you have more than three inputs at different planning levels in one calculation
- D. Used to break down a large calculation into manageable subcalculations
正解:C、D
質問 # 36
Which of the following data inputs, when increased, will always cause an increase in the safety stock outputs when the Global (multi-stage) Inventory Optimization operator is run?Note: There are 2 correct answers to this question.
- A. Holding Cost Percentage
- B. Transportation Lead Time Error CV
- C. Minimum Lot Size
- D. Target Service Level
正解:C、D
質問 # 37
For which of the following application jobs can you enter planning filters as parameters?Note: There are
2 correct answers to this question.
- A. Purge Key Figure Data
- B. Create Time Periods for Time Profiles
- C. Purge Non-Conforming Data
- D. Purge Master Data
正解:A、D
質問 # 38
......