無料ISO-IEC-27005-Risk-Managerサンプル問題で100%カバー率のリアル試験問題(更新された62問あります) [Q14-Q38]

Share

無料ISO-IEC-27005-Risk-Managerサンプル問題で100%カバー率のリアル試験問題(更新された62問あります)

今すぐダウンロード!リアルPECB ISO-IEC-27005-Risk-Manager試験問題集テストエンジン試験問題

質問 # 14
According to CRAMM methodology, how is risk assessment initiated?

  • A. By determining methods and procedures for managing risks
  • B. By identifying the security risks
  • C. By gathering information on the system and identifying assets within the scope

正解:C

解説:
According to the CRAMM (CCTA Risk Analysis and Management Method) methodology, risk assessment begins by collecting detailed information on the system and identifying all assets that fall within the defined scope. This foundational step ensures that the assessment is comprehensive and includes all relevant assets, which could be potential targets for risk. This makes option A the correct answer.


質問 # 15
Which of the following statements best defines information security risk?

  • A. Potential cause of an unwanted incident related to information security that can cause harm to an organization
  • B. Weakness of an asset or control that can be exploited by one or a group of threats
  • C. The potential that threats will exploit vulnerabilities of an information asset and cause harm to an organization

正解:C

解説:
Information security risk, as defined by ISO/IEC 27005, is "the potential that a threat will exploit a vulnerability of an asset or group of assets and thereby cause harm to the organization." This definition emphasizes the interplay between threats (e.g., cyber attackers, natural disasters), vulnerabilities (e.g., weaknesses in software, inadequate security controls), and the potential impact or harm that could result from this exploitation. Therefore, option A is the most comprehensive and accurate description of information security risk. In contrast, option B describes a vulnerability, and option C focuses on the cause of an incident rather than defining risk itself. Option A aligns directly with the risk definition in ISO/IEC 27005.


質問 # 16
According to ISO/IEC 27005, what is the input when selecting information security risk treatment options?

  • A. A risk treatment plan and residual risks subject to the acceptance decision
  • B. A list of prioritized risks with event or risk scenarios that lead to those risks
  • C. A list of risks with level values assigned

正解:B

解説:
According to ISO/IEC 27005, the input for selecting information security risk treatment options should include a list of prioritized risks along with the specific event or risk scenarios that led to those risks. This information helps decision-makers understand the context and potential impact of each risk, allowing them to choose the most appropriate treatment options. Option A is incorrect because the risk treatment plan and residual risks are outputs, not inputs, of the risk treatment process. Option C is incorrect because a list of risks with level values assigned provides limited context for selecting appropriate treatment options.


質問 # 17
Scenario 8: Biotide is a pharmaceutical company that produces medication for treating different kinds of diseases. The company was founded in 1997, and since then it has contributed in solving some of the most challenging healthcare issues.
As a pharmaceutical company, Biotide operates in an environment associated with complex risks. As such, the company focuses on risk management strategies that ensure the effective management of risks to develop high-quality medication. With the large amount of sensitive information generated from the company, managing information security risks is certainly an important part of the overall risk management process. Biotide utilizes a publicly available methodology for conducting risk assessment related to information assets. This methodology helps Biotide to perform risk assessment by taking into account its objectives and mission. Following this method, the risk management process is organized into four activity areas, each of them involving a set of activities, as provided below.
1. Activity area 1: The organization determines the criteria against which the effects of a risk occurring can be evaluated. In addition, the impacts of risks are also defined.
2. Activity area 2: The purpose of the second activity area is to create information asset profiles. The organization identifies critical information assets, their owners, as well as the security requirements for those assets. After determining the security requirements, the organization prioritizes them. In addition, the organization identifies the systems that store, transmit, or process information.
3. Activity area 3: The organization identifies the areas of concern which initiates the risk identification process. In addition, the organization analyzes and determines the probability of the occurrence of possible threat scenarios.
4. Activity area 4: The organization identifies and evaluates the risks. In addition, the criteria specified in activity area 1 is reviewed and the consequences of the areas of concerns are evaluated. Lastly, the level of identified risks is determined.
The table below provides an example of how Biotide assesses the risks related to its information assets following this methodology:

Based on the table provided in scenario 8, did Biotide follow all the steps of the risk assessment methodology regarding the identification of assets?

  • A. Yes, the identification of assets involves only the identification of critical information assets and their security requirements
  • B. No, Biotide should identify only critical assets and electronic health records is not a critical asset
  • C. No, after identifying critical assets, Biotide should define the asset owners

正解:C

解説:
Based on the scenario, Biotide follows a methodology where the identification of critical assets is part of Activity Area 2. However, according to ISO/IEC 27005, after identifying the critical assets, the organization should also identify and document the asset owners.
ISO/IEC 27005:2018 emphasizes that the asset owner is responsible for the protection of the asset and that understanding ownership is critical to implementing effective risk management controls. In the given table, the scenario does not explicitly mention defining the asset owners after identifying critical assets, which is a necessary step. Therefore, the correct answer is B.
Reference:
ISO/IEC 27005:2018, Section 7.2.2 "Identification of assets, owners, and risk sources" details the steps required for proper asset identification, including defining the asset owners as a critical part of the risk assessment process.


質問 # 18
Based on the EBIOS RM method, which of the following is one of the four attack sequence phases?

  • A. Exploiting
  • B. Treating
  • C. Attacking

正解:A

解説:
Based on the EBIOS Risk Manager (EBIOS RM) methodology, the attack sequence phases include various steps that an attacker might take to compromise an organization's assets. The four phases generally cover reconnaissance, exploiting vulnerabilities, achieving objectives, and maintaining persistence. "Exploiting" is specifically the phase where the attacker takes advantage of identified vulnerabilities in the system, which directly aligns with option A.


質問 # 19
Scenario 1
The risk assessment process was led by Henry, Bontton's risk manager. The first step that Henry took was identifying the company's assets. Afterward, Henry created various potential incident scenarios. One of the main concerns regarding the use of the application was the possibility of being targeted by cyber attackers, as a great number of organizations were experiencing cyberattacks during that time. After analyzing the identified risks, Henry evaluated them and concluded that new controls must be implemented if the company wants to use the application. Among others, he stated that training should be provided to personnel regarding the use of the application and that awareness sessions should be conducted regarding the importance of protecting customers' personal data.
Lastly, Henry communicated the risk assessment results to the top management. They decided that the application will be used only after treating the identified risks.
According to scenario 1, Bontton wanted to use an application that ensures only authorized users have access to customers' personal dat a. Which information security principle does Bontton want to ensure in this case?

  • A. Availability
  • B. Integrity
  • C. Confidentiality

正解:C

解説:
In the context of information security, confidentiality refers to ensuring that information is accessible only to those who are authorized to have access. According to scenario 1, Bontton wanted to use an application that ensures only authorized users have access to customers' personal data. This directly aligns with the principle of confidentiality, as Bontton aims to protect personal data from unauthorized access or disclosure. This focus on restricting access to sensitive data to authorized personnel clearly indicates that the confidentiality of information is the primary concern in this case. Thus, the correct answer is C.


質問 # 20
Scenario 1
The risk assessment process was led by Henry, Bontton's risk manager. The first step that Henry took was identifying the company's assets. Afterward, Henry created various potential incident scenarios. One of the main concerns regarding the use of the application was the possibility of being targeted by cyber attackers, as a great number of organizations were experiencing cyberattacks during that time. After analyzing the identified risks, Henry evaluated them and concluded that new controls must be implemented if the company wants to use the application. Among others, he stated that training should be provided to personnel regarding the use of the application and that awareness sessions should be conducted regarding the importance of protecting customers' personal data.
Lastly, Henry communicated the risk assessment results to the top management. They decided that the application will be used only after treating the identified risks.
Henry concluded that one of the main concerns regarding the use of the application for online ordering was cyberattacks. What did Henry identify in this case? Refer to scenario 1.\

  • A. The consequences of a potential security incident
  • B. A threat
  • C. The vulnerabilities of an asset

正解:B

解説:
In this scenario, Henry identifies "cyberattacks" as one of the main concerns related to the use of the application for online ordering. According to ISO/IEC 27005, a "threat" is any potential cause of an unwanted incident that may result in harm to a system or organization. In this context, cyberattacks are considered a threat because they represent a potential cause that could compromise the security of the application. Henry's identification of cyberattacks as a primary concern aligns with recognizing a specific threat that could exploit vulnerabilities within the system.
Reference:
ISO/IEC 27005:2018, Clause 8.3, "Threat identification," which provides guidance on identifying threats that could affect the organization's information assets.
ISO/IEC 27001:2013, Clause 6.1.2, "Information Security Risk Assessment," where identifying threats is part of the risk assessment process.
These answers are verified based on the standards' definitions and guidelines, providing a comprehensive understanding of how ISO/IEC 27005 is used within the context of ISO/IEC 27001.


質問 # 21
Which statement regarding risks and opportunities is correct?

  • A. Risks always have a positive outcome whereas opportunities have an unpredicted outcome
  • B. There is no difference between opportunities and risks; these terms can be used interchangeably
  • C. Opportunities might have a positive impact, whereas risks might have a negative impact

正解:C

解説:
ISO standards, including ISO/IEC 27005, make a distinction between risks and opportunities. Risks are defined as the effect of uncertainty on objectives, which can result in negative consequences (such as financial loss, reputational damage, or operational disruption). Opportunities, on the other hand, are situations or conditions that have the potential to provide a positive impact on achieving objectives. Therefore, option B is correct, as it accurately reflects that risks are generally associated with negative impacts, while opportunities can lead to positive outcomes. Option A is incorrect because risks can have negative outcomes, not positive ones. Option C is incorrect because risks and opportunities have different meanings and implications and are not interchangeable.


質問 # 22
Scenario 5: Detika is a private cardiology clinic in Pennsylvania, the US. Detika has one of the most advanced healthcare systems for treating heart diseases. The clinic uses sophisticated apparatus that detects heart diseases in early stages. Since 2010, medical information of Detika's patients is stored on the organization's digital systems. Electronic health records (EHR), among others, include patients' diagnosis, treatment plan, and laboratory results.
Storing and accessing patient and other medical data digitally was a huge and a risky step for Detik a. Considering the sensitivity of information stored in their systems, Detika conducts regular risk assessments to ensure that all information security risks are identified and managed. Last month, Detika conducted a risk assessment which was focused on the EHR system. During risk identification, the IT team found out that some employees were not updating the operating systems regularly. This could cause major problems such as a data breach or loss of software compatibility. In addition, the IT team tested the software and detected a flaw in one of the software modules used. Both issues were reported to the top management and they decided to implement appropriate controls for treating the identified risks. They decided to organize training sessions for all employees in order to make them aware of the importance of the system updates. In addition, the manager of the IT Department was appointed as the person responsible for ensuring that the software is regularly tested.
Another risk identified during the risk assessment was the risk of a potential ransomware attack. This risk was defined as low because all their data was backed up daily. The IT team decided to accept the actual risk of ransomware attacks and concluded that additional measures were not required. This decision was documented in the risk treatment plan and communicated to the risk owner. The risk owner approved the risk treatment plan and documented the risk assessment results.
Following that, Detika initiated the implementation of new controls. In addition, one of the employees of the IT Department was assigned the responsibility for monitoring the implementation process and ensure the effectiveness of the security controls. The IT team, on the other hand, was responsible for allocating the resources needed to effectively implement the new controls.
Based on scenario 5, which risk treatment option did Detika select to treat the risk of a potential ransomware attack?

  • A. Risk avoidance
  • B. Risk retention
  • C. Risk sharing

正解:B

解説:
Risk retention involves accepting the risk when its likelihood or impact is low, or when the cost of mitigating the risk is higher than the benefit. In the scenario, Detika decided to accept the risk of a potential ransomware attack because the data is backed up daily, and additional measures were deemed unnecessary. This decision aligns with the risk retention strategy, where an organization chooses to live with the risk rather than apply further controls. Option A is the correct answer.
Reference:
ISO/IEC 27005:2018, Clause 8.6, "Risk Treatment," which discusses risk retention as an option for managing risks deemed acceptable by the organization.


質問 # 23
Scenario 2: Travivve is a travel agency that operates in more than 100 countries. Headquartered in San Francisco, the US, the agency is known for its personalized vacation packages and travel services. Travivve aims to deliver reliable services that meet its clients' needs. Considering the impact of information security in its reputation, Travivve decided to implement an information security management system (ISMS) based on ISO/IEC 27001. In addition, they decided to establish and implement an information security risk management program. Based on the priority of specific departments in Travivve, the top management decided to initially apply the risk management process only in the Sales Management Department. The process would be applicable for other departments only when introducing new technology.
Travivve's top management wanted to make sure that the risk management program is established based on the industry best practices. Therefore, they created a team of three members that would be responsible for establishing and implementing it. One of the team members was Travivve's risk manager who was responsible for supervising the team and planning all risk management activities. In addition, the risk manager was responsible for monitoring the program and reporting the monitoring results to the top management.
Initially, the team decided to analyze the internal and external context of Travivve. As part of the process of understanding the organization and its context, the team identified key processes and activities. Then, the team identified the interested parties and their basic requirements and determined the status of compliance with these requirements. In addition, the team identified all the reference documents that applied to the defined scope of the risk management process, which mainly included the Annex A of ISO/IEC 27001 and the internal security rules established by Travivve. Lastly, the team analyzed both reference documents and justified a few noncompliances with those requirements.
The risk manager selected the information security risk management method which was aligned with other approaches used by the company to manage other risks. The team also communicated the risk management process to all interested parties through previously established communication mechanisms. In addition, they made sure to inform all interested parties about their roles and responsibilities regarding risk management. Travivve also decided to involve interested parties in its risk management activities since, according to the top management, this process required their active participation.
Lastly, Travivve's risk management team decided to conduct the initial information security risk assessment process. As such, the team established the criteria for performing the information security risk assessment which included the consequence criteria and likelihood criteria.
Did Travivve's risk management team identify the basic requirements of interested parties in accordance with the guidelines of ISO/IEC 27005? Refer to scenario 2.

  • A. No, the team should use only the organization's internal security rules to determine the status of compliance with the basic requirements of interested parties
  • B. No, the team should define the basic requirements of interested parties, but it should determine status of compliance with the requirements after implementing the risk treatment options
  • C. Yes, the team identified the basic requirements of interested parties and determined the status of compliance with those requirements as recommended by ISO/IEC 27005

正解:C

解説:
According to ISO/IEC 27005, understanding the organization and its context, including the identification of interested parties and their requirements, is a critical part of the risk management process. The team at Travivve identified the interested parties and their basic requirements and determined the status of compliance with these requirements, which aligns with the guidelines provided by ISO/IEC 27005. This standard recommends that organizations should understand their context and stakeholders' requirements to effectively manage risks. Additionally, it is appropriate to evaluate compliance with requirements as part of the context analysis, rather than after implementing risk treatment options. Therefore, the team's approach was in accordance with ISO/IEC 27005, making option C the correct answer.
Reference:
ISO/IEC 27005:2018, Clause 7, "Context Establishment," which outlines the importance of identifying the context, including the interested parties and their requirements, as a basis for risk management.


質問 # 24
Which statement regarding information gathering techniques is correct?

  • A. Sending questionnaires to a group of people who represent the interested parties is NOT preferred
  • B. Interviews should be conducted only with individuals responsible for information security management
  • C. Organizations can utilize technical tools to identify technical vulnerabilities and compile a list of assets that influence risk assessment

正解:C

解説:
ISO/IEC 27005 supports the use of various information-gathering techniques, including technical tools, to identify and assess risks. Technical tools such as vulnerability scanners and asset management software can help organizations identify technical vulnerabilities and compile a list of assets that are critical for risk assessment. This aligns with the standard's recommendation to use automated tools for an effective risk assessment process. Option B is correct because it accurately describes an effective information-gathering technique.
Reference:
ISO/IEC 27005:2018, Clause 8.2, "Risk Identification," which discusses using tools and techniques to identify risks.


質問 # 25
Can organizations obtain certification against ISO 31000?

  • A. Yes, organizations of any type or size can obtain certification against ISO 31000
  • B. Yes, but only organizations that manufacture products can obtain an ISO 31000 certification
  • C. [No, organizations cannot obtain certification against ISO 31000, as the standard provides only guidelines

正解:C

解説:
ISO 31000 is an international standard that provides guidelines for risk management. It is a framework that helps organizations develop a risk management strategy to effectively manage risk, taking into consideration their specific contexts. However, ISO 31000 is not designed to be used as a certifiable standard; instead, it offers principles, a framework, and a process for managing risk. Unlike other ISO standards, such as ISO/IEC 27001 for information security management systems, which are certifiable, ISO 31000 does not have a certification process because it does not specify any requirements that an organization must comply with. Therefore, option C is the correct answer because ISO 31000 is intended to provide guidelines and is not certifiable.


質問 # 26
Scenario 4: In 2017, seeing that millions of people turned to online shopping, Ed and James Cordon founded the online marketplace for footwear called Poshoe. In the past, purchasing pre-owned designer shoes online was not a pleasant experience because of unattractive pictures and an inability to ascertain the products' authenticity. However, after Poshoe's establishment, each product was well advertised and certified as authentic before being offered to clients. This increased the customers' confidence and trust in Poshoe's products and services. Poshoe has approximately four million users and its mission is to dominate the second-hand sneaker market and become a multi-billion dollar company.
Due to the significant increase of daily online buyers, Poshoe's top management decided to adopt a big data analytics tool that could help the company effectively handle, store, and analyze dat a. Before initiating the implementation process, they decided to conduct a risk assessment. Initially, the company identified its assets, threats, and vulnerabilities associated with its information systems. In terms of assets, the company identified the information that was vital to the achievement of the organization's mission and objectives. During this phase, the company also detected a rootkit in their software, through which an attacker could remotely access Poshoe's systems and acquire sensitive data.
The company discovered that the rootkit had been installed by an attacker who had gained administrator access. As a result, the attacker was able to obtain the customers' personal data after they purchased a product from Poshoe. Luckily, the company was able to execute some scans from the target device and gain greater visibility into their software's settings in order to identify the vulnerability of the system.
The company initially used the qualitative risk analysis technique to assess the consequences and the likelihood and to determine the level of risk. The company defined the likelihood of risk as "a few times in two years with the probability of 1 to 3 times per year." Later, it was decided that they would use a quantitative risk analysis methodology since it would provide additional information on this major risk. Lastly, the top management decided to treat the risk immediately as it could expose the company to other issues. In addition, it was communicated to their employees that they should update, secure, and back up Poshoe's software in order to protect customers' personal information and prevent unauthorized access from attackers.
Based on scenario 4, which scanning tool did Poshoe use to detect the vulnerability in their software?

  • A. Penetration testing tool
  • B. Network-based scanning tool
  • C. Host-based scanning tool

正解:C

解説:
Poshoe used scans from the target device to gain greater visibility into their software's settings and identify vulnerabilities, which indicates the use of a host-based scanning tool. Host-based scanning tools are used to examine the internal state of a system, such as installed software, configurations, and files, to detect vulnerabilities or malicious software like rootkits. Option A (Network-based scanning tool) would be used to scan network traffic and identify vulnerabilities in network devices, which does not match the context. Option C (Penetration testing tool) involves simulating an attack to test system defenses, which is more intrusive than the scanning described in the scenario.


質問 # 27
Scenario 6: Productscape is a market research company headquartered in Brussels, Belgium. It helps organizations understand the needs and expectations of their customers and identify new business opportunities. Productscape's teams have extensive experience in marketing and business strategy and work with some of the best-known organizations in Europe. The industry in which Productscape operates requires effective risk management. Considering that Productscape has access to clients' confidential information, it is responsible for ensuring its security. As such, the company conducts regular risk assessments. The top management appointed Alex as the risk manager, who is responsible for monitoring the risk management process and treating information security risks.
The last risk assessment conducted was focused on information assets. The purpose of this risk assessment was to identify information security risks, understand their level, and take appropriate action to treat them in order to ensure the security of their systems. Alex established a team of three members to perform the risk assessment activities. Each team member was responsible for specific departments included in the risk assessment scope. The risk assessment provided valuable information to identify, understand, and mitigate the risks that Productscape faces.
Initially, the team identified potential risks based on the risk identification results. Prior to analyzing the identified risks, the risk acceptance criteria were established. The criteria for accepting the risks were determined based on Productscape's objectives, operations, and technology. The team created various risk scenarios and determined the likelihood of occurrence as "low," "medium," or "high." They decided that if the likelihood of occurrence for a risk scenario is determined as "low," no further action would be taken. On the other hand, if the likelihood of occurrence for a risk scenario is determined as "high" or "medium," additional controls will be implemented. Some information security risk scenarios defined by Productscape's team were as follows:
1. A cyber attacker exploits a security misconfiguration vulnerability of Productscape's website to launch an attack, which, in turn, could make the website unavailable to users.
2. A cyber attacker gains access to confidential information of clients and may threaten to make the information publicly available unless a ransom is paid.
3. An internal employee clicks on a link embedded in an email that redirects them to an unsecured website, installing a malware on the device.
The likelihood of occurrence for the first risk scenario was determined as "medium." One of the main reasons that such a risk could occur was the usage of default accounts and password. Attackers could exploit this vulnerability and launch a brute-force attack. Therefore, Productscape decided to start using an automated "build and deploy" process which would test the software on deploy and minimize the likelihood of such an incident from happening. However, the team made it clear that the implementation of this process would not eliminate the risk completely and that there was still a low possibility for this risk to occur. Productscape documented the remaining risk and decided to monitor it for changes.
The likelihood of occurrence for the second risk scenario was determined as "medium." Productscape decided to contract an IT company that would provide technical assistance and monitor the company's systems and networks in order to prevent such incidents from happening.
The likelihood of occurrence for the third risk scenario was determined as "high." Thus, Productscape decided to include phishing as a topic on their information security training sessions. In addition, Alex reviewed the controls of Annex A of ISO/IEC 27001 in order to determine the necessary controls for treating this risk. Alex decided to implement control A.8.23 Web filtering which would help the company to reduce the risk of accessing unsecure websites. Although security controls were implemented to treat the risk, the level of the residual risk still did not meet the risk acceptance criteria defined in the beginning of the risk assessment process. Since the cost of implementing additional controls was too high for the company, Productscape decided to accept the residual risk. Therefore, risk owners were assigned the responsibility of managing the residual risk.
Based on the scenario above, answer the following question:
Which risk treatment option was used for the first risk scenario?

  • A. Risk avoidance
  • B. Risk modification
  • C. Risk sharing

正解:B

解説:
Risk modification involves implementing measures to reduce the likelihood or impact of a risk. In the first risk scenario, Productscape decided to use an automated "build and deploy" process to reduce the likelihood of an attacker exploiting a security misconfiguration vulnerability. This action aims to lower the risk to an acceptable level, which is characteristic of risk modification. Option B (Risk avoidance) would involve eliminating the risk by avoiding the activity altogether, which is not what was done. Option C (Risk sharing) involves transferring some or all of the risk to a third party, which is not applicable in this scenario.


質問 # 28
What are opportunities?

  • A. Outcome of an event affecting objectives
  • B. Occurrence or change of a particular set of circumstances
  • C. Combination of circumstances expected to be favorable to objectives

正解:C

解説:
Opportunities, according to ISO standards such as ISO 31000, are situations or conditions that have the potential to provide a favorable impact on achieving objectives. They represent circumstances that, when leveraged, can lead to beneficial outcomes for the organization, such as competitive advantage, growth, or improved performance. Option B is correct as it accurately describes opportunities as circumstances expected to be favorable to achieving objectives. Option A (Occurrence or change of a particular set of circumstances) is a more general definition that could apply to both risks and opportunities, while Option C (Outcome of an event affecting objectives) is more aligned with the concept of risk.


質問 # 29
Scenario 8: Biotide is a pharmaceutical company that produces medication for treating different kinds of diseases. The company was founded in 1997, and since then it has contributed in solving some of the most challenging healthcare issues.
As a pharmaceutical company, Biotide operates in an environment associated with complex risks. As such, the company focuses on risk management strategies that ensure the effective management of risks to develop high-quality medication. With the large amount of sensitive information generated from the company, managing information security risks is certainly an important part of the overall risk management process. Biotide utilizes a publicly available methodology for conducting risk assessment related to information assets. This methodology helps Biotide to perform risk assessment by taking into account its objectives and mission. Following this method, the risk management process is organized into four activity areas, each of them involving a set of activities, as provided below.
1. Activity area 1: The organization determines the criteria against which the effects of a risk occurring can be evaluated. In addition, the impacts of risks are also defined.
2. Activity area 2: The purpose of the second activity area is to create information asset profiles. The organization identifies critical information assets, their owners, as well as the security requirements for those assets. After determining the security requirements, the organization prioritizes them. In addition, the organization identifies the systems that store, transmit, or process information.
3. Activity area 3: The organization identifies the areas of concern which initiates the risk identification process. In addition, the organization analyzes and determines the probability of the occurrence of possible threat scenarios.
4. Activity area 4: The organization identifies and evaluates the risks. In addition, the criteria specified in activity area 1 is reviewed and the consequences of the areas of concerns are evaluated. Lastly, the level of identified risks is determined.
The table below provides an example of how Biotide assesses the risks related to its information assets following this methodology:

According to the risk assessment methodology used by Biotide, what else should be performed during activity area 4? Refer to scenario 8.

  • A. Monitor security controls for ensuring they are appropriate for new threats
  • B. Select a mitigation strategy for the identified risk profiles
  • C. Create a strategic and operational plan

正解:B

解説:
In Activity Area 4 of the risk assessment methodology used by Biotide, the focus is on identifying and evaluating risks, reviewing the criteria defined in Activity Area 1, and evaluating the consequences of identified areas of concern to determine the level of risk. However, an essential part of completing a risk assessment process also includes determining appropriate mitigation strategies for the identified risks.
ISO/IEC 27005 provides guidance on selecting and implementing security measures to manage the risk to an acceptable level. Therefore, selecting a mitigation strategy for the identified risk profiles is a crucial next step. This involves deciding on controls or measures that will reduce either the likelihood of the threat exploiting the vulnerability or the impact of the risk should it occur. Thus, the correct answer is B.
Reference:
ISO/IEC 27005:2018, Section 8.3.5 "Risk treatment" outlines the process of selecting appropriate risk treatment options (mitigation strategies) once risks have been identified and evaluated.


質問 # 30
Scenario 7: Adstry is a business growth agency that specializes in digital marketing strategies. Adstry helps organizations redefine the relationships with their customers through innovative solutions. Adstry is headquartered in San Francisco and recently opened two new offices in New York. The structure of the company is organized into teams which are led by project managers. The project manager has the full power in any decision related to projects. The team members, on the other hand, report the project's progress to project managers.
Considering that data breaches and ad fraud are common threats in the current business environment, managing risks is essential for Adstry. When planning new projects, each project manager is responsible for ensuring that risks related to a particular project have been identified, assessed, and mitigated. This means that project managers have also the role of the risk manager in Adstry. Taking into account that Adstry heavily relies on technology to complete their projects, their risk assessment certainly involves identification of risks associated with the use of information technology. At the earliest stages of each project, the project manager communicates the risk assessment results to its team members.
Adstry uses a risk management software which helps the project team to detect new potential risks during each phase of the project. This way, team members are informed in a timely manner for the new potential risks and are able to respond to them accordingly. The project managers are responsible for ensuring that the information provided to the team members is communicated using an appropriate language so it can be understood by all of them.
In addition, the project manager may include external interested parties affected by the project in the risk communication. If the project manager decides to include interested parties, the risk communication is thoroughly prepared. The project manager firstly identifies the interested parties that should be informed and takes into account their concerns and possible conflicts that may arise due to risk communication. The risks are communicated to the identified interested parties while taking into consideration the confidentiality of Adstry's information and determining the level of detail that should be included in the risk communication. The project managers use the same risk management software for risk communication with external interested parties since it provides a consistent view of risks. For each project, the project manager arranges regular meetings with relevant interested parties of the project, they discuss the detected risks, their prioritization, and determine appropriate treatment solutions. The information taken from the risk management software and the results of these meetings are documented and are used for decision-making processes. In addition, the company uses a computerized documented information management system for the acquisition, classification, storage, and archiving of its documents.
Based on scenario 7, project managers communicate risks to external interested parties, taking into account the information confidentiality. Which principle of efficient communication strategy do project managers follow?

  • A. Responsiveness
  • B. Transparency
  • C. Credibility

正解:B

解説:
ISO/IEC 27005 emphasizes that effective risk management involves clear communication strategies, especially when it comes to ensuring that all stakeholders-both internal and external-are well-informed about potential risks and their impacts. The communication of risks is an essential part of the risk treatment process, as stated in the ISO/IEC 27005 standard.
In the given scenario, Adstry project managers are responsible for communicating risks to external interested parties, while carefully considering the confidentiality of the company's information. They ensure that the risks are conveyed with the appropriate level of detail, protecting sensitive information but still providing the necessary insights to interested parties. This level of disclosure ensures that stakeholders are well aware of the risks without compromising the organization's confidentiality policies.
The principle of transparency in communication refers to the clear, open, and honest sharing of information that stakeholders need in order to make informed decisions. By identifying interested parties, considering their concerns, and ensuring risk communication is well-prepared and detailed appropriately, Adstry's project managers are practicing transparency. They provide the necessary risk information while balancing the protection of confidential data.
Option A, credibility, refers to building trust in communication, which is not the primary focus in this context. Option B, responsiveness, is about timely reactions to risks or concerns but doesn't directly relate to how the information is communicated regarding risk confidentiality.
Thus, transparency is the correct answer because it aligns with how project managers ensure that the necessary risk details are communicated in a clear and honest way, while still protecting confidential information, as outlined by ISO/IEC 27005 risk communication principles.


質問 # 31
Scenario 7: Adstry is a business growth agency that specializes in digital marketing strategies. Adstry helps organizations redefine the relationships with their customers through innovative solutions. Adstry is headquartered in San Francisco and recently opened two new offices in New York. The structure of the company is organized into teams which are led by project managers. The project manager has the full power in any decision related to projects. The team members, on the other hand, report the project's progress to project managers.
Considering that data breaches and ad fraud are common threats in the current business environment, managing risks is essential for Adstry. When planning new projects, each project manager is responsible for ensuring that risks related to a particular project have been identified, assessed, and mitigated. This means that project managers have also the role of the risk manager in Adstry. Taking into account that Adstry heavily relies on technology to complete their projects, their risk assessment certainly involves identification of risks associated with the use of information technology. At the earliest stages of each project, the project manager communicates the risk assessment results to its team members.
Adstry uses a risk management software which helps the project team to detect new potential risks during each phase of the project. This way, team members are informed in a timely manner for the new potential risks and are able to respond to them accordingly. The project managers are responsible for ensuring that the information provided to the team members is communicated using an appropriate language so it can be understood by all of them.
In addition, the project manager may include external interested parties affected by the project in the risk communication. If the project manager decides to include interested parties, the risk communication is thoroughly prepared. The project manager firstly identifies the interested parties that should be informed and takes into account their concerns and possible conflicts that may arise due to risk communication. The risks are communicated to the identified interested parties while taking into consideration the confidentiality of Adstry's information and determining the level of detail that should be included in the risk communication. The project managers use the same risk management software for risk communication with external interested parties since it provides a consistent view of risks. For each project, the project manager arranges regular meetings with relevant interested parties of the project, they discuss the detected risks, their prioritization, and determine appropriate treatment solutions. The information taken from the risk management software and the results of these meetings are documented and are used for decision-making processes. In addition, the company uses a computerized documented information management system for the acquisition, classification, storage, and archiving of its documents.
Based on scenario 7, which principle of efficient communication strategy Adstry's project managers follow when communicating risks to team members?

  • A. Responsiveness
  • B. Clarity
  • C. Credibility

正解:B

解説:
Adstry's project managers focus on ensuring that the information provided to team members is communicated using an appropriate language that can be understood by all. This approach reflects the principle of clarity, which is a key element of an effective communication strategy. Clear communication helps to ensure that all parties understand the risks, their implications, and the necessary actions to mitigate them. Option B (Credibility) relates to trustworthiness, which is not the primary focus here, and Option C (Responsiveness) involves timely reactions, which is also not the main point of emphasis in this context.


質問 # 32
Scenario 5: Detika is a private cardiology clinic in Pennsylvania, the US. Detika has one of the most advanced healthcare systems for treating heart diseases. The clinic uses sophisticated apparatus that detects heart diseases in early stages. Since 2010, medical information of Detika's patients is stored on the organization's digital systems. Electronic health records (EHR), among others, include patients' diagnosis, treatment plan, and laboratory results.
Storing and accessing patient and other medical data digitally was a huge and a risky step for Detik a. Considering the sensitivity of information stored in their systems, Detika conducts regular risk assessments to ensure that all information security risks are identified and managed. Last month, Detika conducted a risk assessment which was focused on the EHR system. During risk identification, the IT team found out that some employees were not updating the operating systems regularly. This could cause major problems such as a data breach or loss of software compatibility. In addition, the IT team tested the software and detected a flaw in one of the software modules used. Both issues were reported to the top management and they decided to implement appropriate controls for treating the identified risks. They decided to organize training sessions for all employees in order to make them aware of the importance of the system updates. In addition, the manager of the IT Department was appointed as the person responsible for ensuring that the software is regularly tested.
Another risk identified during the risk assessment was the risk of a potential ransomware attack. This risk was defined as low because all their data was backed up daily. The IT team decided to accept the actual risk of ransomware attacks and concluded that additional measures were not required. This decision was documented in the risk treatment plan and communicated to the risk owner. The risk owner approved the risk treatment plan and documented the risk assessment results.
Following that, Detika initiated the implementation of new controls. In addition, one of the employees of the IT Department was assigned the responsibility for monitoring the implementation process and ensure the effectiveness of the security controls. The IT team, on the other hand, was responsible for allocating the resources needed to effectively implement the new controls.
Based on scenario 5, the IT team was responsible for allocating the necessary resources to ensure that the new controls are implemented effectively. Is this acceptable?

  • A. No, the organization should allocate the necessary resources to ensure the effective implementation of the risk treatment plan
  • B. Yes, the team that is responsible for conducting the risk assessment should ensure that the necessary resources for treating the risk are allocated
  • C. No, the necessary resources for treating the risk should be allocated in the beginning of the risk assessment process

正解:B

解説:
According to ISO/IEC 27005, the team responsible for the risk assessment is often tasked with coordinating the resources necessary to treat identified risks effectively. This includes ensuring that the resources required for implementing risk treatment actions, such as financial, technical, and human resources, are available and allocated appropriately. Option B is incorrect because it is not only the organization that allocates resources, but rather a combined effort involving the risk management team to ensure proper allocation. Option C is incorrect because resources must be managed and allocated continually throughout the risk management process, not just at the beginning.


質問 # 33
Scenario 6: Productscape is a market research company headquartered in Brussels, Belgium. It helps organizations understand the needs and expectations of their customers and identify new business opportunities. Productscape's teams have extensive experience in marketing and business strategy and work with some of the best-known organizations in Europe. The industry in which Productscape operates requires effective risk management. Considering that Productscape has access to clients' confidential information, it is responsible for ensuring its security. As such, the company conducts regular risk assessments. The top management appointed Alex as the risk manager, who is responsible for monitoring the risk management process and treating information security risks.
The last risk assessment conducted was focused on information assets. The purpose of this risk assessment was to identify information security risks, understand their level, and take appropriate action to treat them in order to ensure the security of their systems. Alex established a team of three members to perform the risk assessment activities. Each team member was responsible for specific departments included in the risk assessment scope. The risk assessment provided valuable information to identify, understand, and mitigate the risks that Productscape faces.
Initially, the team identified potential risks based on the risk identification results. Prior to analyzing the identified risks, the risk acceptance criteria were established. The criteria for accepting the risks were determined based on Productscape's objectives, operations, and technology. The team created various risk scenarios and determined the likelihood of occurrence as "low," "medium," or "high." They decided that if the likelihood of occurrence for a risk scenario is determined as "low," no further action would be taken. On the other hand, if the likelihood of occurrence for a risk scenario is determined as "high" or "medium," additional controls will be implemented. Some information security risk scenarios defined by Productscape's team were as follows:
1. A cyber attacker exploits a security misconfiguration vulnerability of Productscape's website to launch an attack, which, in turn, could make the website unavailable to users.
2. A cyber attacker gains access to confidential information of clients and may threaten to make the information publicly available unless a ransom is paid.
3. An internal employee clicks on a link embedded in an email that redirects them to an unsecured website, installing a malware on the device.
The likelihood of occurrence for the first risk scenario was determined as "medium." One of the main reasons that such a risk could occur was the usage of default accounts and password. Attackers could exploit this vulnerability and launch a brute-force attack. Therefore, Productscape decided to start using an automated "build and deploy" process which would test the software on deploy and minimize the likelihood of such an incident from happening. However, the team made it clear that the implementation of this process would not eliminate the risk completely and that there was still a low possibility for this risk to occur. Productscape documented the remaining risk and decided to monitor it for changes.
The likelihood of occurrence for the second risk scenario was determined as "medium." Productscape decided to contract an IT company that would provide technical assistance and monitor the company's systems and networks in order to prevent such incidents from happening.
The likelihood of occurrence for the third risk scenario was determined as "high." Thus, Productscape decided to include phishing as a topic on their information security training sessions. In addition, Alex reviewed the controls of Annex A of ISO/IEC 27001 in order to determine the necessary controls for treating this risk. Alex decided to implement control A.8.23 Web filtering which would help the company to reduce the risk of accessing unsecure websites. Although security controls were implemented to treat the risk, the level of the residual risk still did not meet the risk acceptance criteria defined in the beginning of the risk assessment process. Since the cost of implementing additional controls was too high for the company, Productscape decided to accept the residual risk. Therefore, risk owners were assigned the responsibility of managing the residual risk.
Based on scenario 6, Productscape decided to accept the residual risk and risk owners were assigned the responsibility of managing this risk.
Based on the guidelines of ISO/IEC 27005, is this acceptable?

  • A. No, the top management should manage the residual risk
  • B. Yes, risk owners must be aware of the residual risk and accept the responsibility for managing it
  • C. No, risk approvers are responsible for managing the residual risk after accepting it

正解:B

解説:
ISO/IEC 27005 specifies that once a risk treatment has been applied and residual risk remains, it is essential that the risk owner is aware of this residual risk and accepts the responsibility for managing it. The risk owner is the individual or entity accountable for managing specific risks within the organization. In Scenario 6, Productscape decided to accept the residual risk and assigned risk owners the responsibility for managing it, which is fully compliant with ISO/IEC 27005. Thus, the correct answer is A.
Reference:
ISO/IEC 27005:2018, Clause 8.6, "Risk Treatment," which states that risk owners should be aware of and accept responsibility for managing residual risks.


質問 # 34
Scenario 4: In 2017, seeing that millions of people turned to online shopping, Ed and James Cordon founded the online marketplace for footwear called Poshoe. In the past, purchasing pre-owned designer shoes online was not a pleasant experience because of unattractive pictures and an inability to ascertain the products' authenticity. However, after Poshoe's establishment, each product was well advertised and certified as authentic before being offered to clients. This increased the customers' confidence and trust in Poshoe's products and services. Poshoe has approximately four million users and its mission is to dominate the second-hand sneaker market and become a multi-billion dollar company.
Due to the significant increase of daily online buyers, Poshoe's top management decided to adopt a big data analytics tool that could help the company effectively handle, store, and analyze dat a. Before initiating the implementation process, they decided to conduct a risk assessment. Initially, the company identified its assets, threats, and vulnerabilities associated with its information systems. In terms of assets, the company identified the information that was vital to the achievement of the organization's mission and objectives. During this phase, the company also detected a rootkit in their software, through which an attacker could remotely access Poshoe's systems and acquire sensitive data.
The company discovered that the rootkit had been installed by an attacker who had gained administrator access. As a result, the attacker was able to obtain the customers' personal data after they purchased a product from Poshoe. Luckily, the company was able to execute some scans from the target device and gain greater visibility into their software's settings in order to identify the vulnerability of the system.
The company initially used the qualitative risk analysis technique to assess the consequences and the likelihood and to determine the level of risk. The company defined the likelihood of risk as "a few times in two years with the probability of 1 to 3 times per year." Later, it was decided that they would use a quantitative risk analysis methodology since it would provide additional information on this major risk. Lastly, the top management decided to treat the risk immediately as it could expose the company to other issues. In addition, it was communicated to their employees that they should update, secure, and back up Poshoe's software in order to protect customers' personal information and prevent unauthorized access from attackers.
According to scenario 4, which type of assets was identified during the risk identification process?

  • A. Tangible assets
  • B. Primary assets
  • C. Supporting assets

正解:B

解説:
During the risk identification process, Poshoe identified the information that was vital to the achievement of the organization's mission and objectives. Such information is considered a primary asset because it directly supports the organization's core business objectives. Primary assets are those that are essential to the organization's functioning and achieving its strategic goals. Option A (Tangible assets) refers to physical assets like hardware or facilities, which is not relevant here. Option C (Supporting assets) refers to assets that support primary assets, like IT infrastructure or software, which also does not fit the context.


質問 # 35
Scenario 5: Detika is a private cardiology clinic in Pennsylvania, the US. Detika has one of the most advanced healthcare systems for treating heart diseases. The clinic uses sophisticated apparatus that detects heart diseases in early stages. Since 2010, medical information of Detika's patients is stored on the organization's digital systems. Electronic health records (EHR), among others, include patients' diagnosis, treatment plan, and laboratory results.
Storing and accessing patient and other medical data digitally was a huge and a risky step for Detik a. Considering the sensitivity of information stored in their systems, Detika conducts regular risk assessments to ensure that all information security risks are identified and managed. Last month, Detika conducted a risk assessment which was focused on the EHR system. During risk identification, the IT team found out that some employees were not updating the operating systems regularly. This could cause major problems such as a data breach or loss of software compatibility. In addition, the IT team tested the software and detected a flaw in one of the software modules used. Both issues were reported to the top management and they decided to implement appropriate controls for treating the identified risks. They decided to organize training sessions for all employees in order to make them aware of the importance of the system updates. In addition, the manager of the IT Department was appointed as the person responsible for ensuring that the software is regularly tested.
Another risk identified during the risk assessment was the risk of a potential ransomware attack. This risk was defined as low because all their data was backed up daily. The IT team decided to accept the actual risk of ransomware attacks and concluded that additional measures were not required. This decision was documented in the risk treatment plan and communicated to the risk owner. The risk owner approved the risk treatment plan and documented the risk assessment results.
Following that, Detika initiated the implementation of new controls. In addition, one of the employees of the IT Department was assigned the responsibility for monitoring the implementation process and ensure the effectiveness of the security controls. The IT team, on the other hand, was responsible for allocating the resources needed to effectively implement the new controls.
Based on the scenario above, answer the following question:
Which risk treatment option did Detika select to treat the risk regarding the update of operating system?

  • A. Risk modification
  • B. Risk sharing
  • C. Risk retention

正解:A

解説:
Risk modification (also known as risk mitigation) involves applying controls to reduce the likelihood or impact of a risk to an acceptable level. In the scenario, Detika decided to organize training sessions for employees to ensure that they regularly update the operating systems. This action is aimed at modifying or reducing the risk associated with not updating the operating systems, which could lead to security breaches or software incompatibility. Therefore, the risk treatment option chosen by Detika for the risk regarding the update of the operating system is risk modification. Option A is the correct answer.
Reference:
ISO/IEC 27005:2018, Clause 8.6, "Risk Treatment," which includes modifying risk by implementing controls to mitigate it.


質問 # 36
Scenario 3: Printary is an American company that offers digital printing services. Creating cost-effective and creative products, the company has been part of the printing industry for more than 30 years. Three years ago, the company started to operate online, providing greater flexibility for its clients. Through the website, clients could find information about all services offered by Printary and order personalized products. However, operating online increased the risk of cyber threats, consequently, impacting the business functions of the company. Thus, along with the decision of creating an online business, the company focused on managing information security risks. Their risk management program was established based on ISO/IEC 27005 guidelines and industry best practices.
Last year, the company considered the integration of an online payment system on its website in order to provide more flexibility and transparency to customers. Printary analyzed various available solutions and selected Pay0, a payment processing solution that allows any company to easily collect payments on their website. Before making the decision, Printary conducted a risk assessment to identify and analyze information security risks associated with the software. The risk assessment process involved three phases: identification, analysis, and evaluation. During risk identification, the company inspected assets, threats, and vulnerabilities. In addition, to identify the information security risks, Printary used a list of the identified events that could negatively affect the achievement of information security objectives. The risk identification phase highlighted two main threats associated with the online payment system: error in use and data corruption After conducting a gap analysis, the company concluded that the existing security controls were sufficient to mitigate the threat of data corruption. However, the user interface of the payment solution was complicated, which could increase the risk associated with user errors, and, as a result, impact data integrity and confidentiality.
Subsequently, the risk identification results were analyzed. The company conducted risk analysis in order to understand the nature of the identified risks. They decided to use a quantitative risk analysis methodology because it would provide more detailed information. The selected risk analysis methodology was consistent with the risk evaluation criteri a. Firstly, they used a list of potential incident scenarios to assess their potential impact. In addition, the likelihood of incident scenarios was defined and assessed. Finally, the level of risk was defined as low.
In the end, the level of risk was compared to the risk evaluation and acceptance criteria and was prioritized accordingly.
Which of the following situations indicates that Printary identified consequences of risk scenarios? Refer to scenario 3.

  • A. Printary concluded that the complicated user interface could increase the risk of user error and impact data integrity and confidentiality
  • B. Printary used the list of potential incident scenarios and assessed their impact on company's information security
  • C. Printary identified two main threats associated with the online payment system: error in use and corruption of data

正解:B

解説:
According to ISO/IEC 27005, the risk management process involves identifying, analyzing, and evaluating risks in a structured manner. Specifically, risk identification entails recognizing potential threats, vulnerabilities, and consequences to information assets. Once risks are identified, ISO/IEC 27005 emphasizes the importance of risk analysis, where risks are assessed in terms of their potential consequences and likelihood.
In the scenario, Printary followed this structured approach, aligning with the ISO/IEC 27005 framework. First, they identified the threats associated with the online payment system, which were categorized as user errors and data corruption. However, identification of threats alone does not equate to identifying the consequences of risk scenarios, as required by the risk analysis phase in ISO/IEC 27005.
The key to recognizing that Printary identified the consequences lies in the fact that they "used the list of potential incident scenarios and assessed their impact on the company's information security." This directly corresponds to ISO/IEC 27005's guidelines on risk analysis, where organizations must evaluate both the likelihood and the impact (consequences) of potential incidents on their assets. In other words, by assessing the impact of the incident scenarios, Printary is analyzing the consequences of the identified risks, which is a crucial step in the risk analysis process.
Option A refers to identifying a risk (user error leading to compromised data integrity and confidentiality), but this does not constitute a comprehensive analysis of the risk's consequences as per ISO/IEC 27005. Similarly, Option C highlights the identification of threats, but the threats themselves are not the consequences of risk scenarios.
Thus, Option B is the most accurate as it reflects Printary's alignment with ISO/IEC 27005 guidelines in assessing the potential consequences of risk scenarios by evaluating their impact on the company's information security.


質問 # 37
Scenario 4: In 2017, seeing that millions of people turned to online shopping, Ed and James Cordon founded the online marketplace for footwear called Poshoe. In the past, purchasing pre-owned designer shoes online was not a pleasant experience because of unattractive pictures and an inability to ascertain the products' authenticity. However, after Poshoe's establishment, each product was well advertised and certified as authentic before being offered to clients. This increased the customers' confidence and trust in Poshoe's products and services. Poshoe has approximately four million users and its mission is to dominate the second-hand sneaker market and become a multi-billion dollar company.
Due to the significant increase of daily online buyers, Poshoe's top management decided to adopt a big data analytics tool that could help the company effectively handle, store, and analyze dat a. Before initiating the implementation process, they decided to conduct a risk assessment. Initially, the company identified its assets, threats, and vulnerabilities associated with its information systems. In terms of assets, the company identified the information that was vital to the achievement of the organization's mission and objectives. During this phase, the company also detected a rootkit in their software, through which an attacker could remotely access Poshoe's systems and acquire sensitive data.
The company discovered that the rootkit had been installed by an attacker who had gained administrator access. As a result, the attacker was able to obtain the customers' personal data after they purchased a product from Poshoe. Luckily, the company was able to execute some scans from the target device and gain greater visibility into their software's settings in order to identify the vulnerability of the system.
The company initially used the qualitative risk analysis technique to assess the consequences and the likelihood and to determine the level of risk. The company defined the likelihood of risk as "a few times in two years with the probability of 1 to 3 times per year." Later, it was decided that they would use a quantitative risk analysis methodology since it would provide additional information on this major risk. Lastly, the top management decided to treat the risk immediately as it could expose the company to other issues. In addition, it was communicated to their employees that they should update, secure, and back up Poshoe's software in order to protect customers' personal information and prevent unauthorized access from attackers.
According to scenario 4, Poshoe has identified its assets, vulnerabilities, and threats associated with its information systems. What does the company need in order to start identifying its existing controls?

  • A. A list of incident scenarios with their consequences
  • B. The risk treatment implementation plan and documentation of controls
  • C. A list of all existing and planned controls

正解:C

解説:
To start identifying its existing controls, Poshoe needs a list of all existing and planned controls. This list will provide the necessary baseline to understand what security measures are already in place and what measures are planned to mitigate risks. This helps in determining gaps, evaluating the effectiveness of current controls, and identifying areas requiring improvement. Option A (The risk treatment implementation plan and documentation of controls) is incorrect because it is too specific and assumes a level of completion not indicated in the scenario. Option C (A list of incident scenarios with their consequences) is incorrect as it pertains to the analysis phase of risk management, not the identification of existing controls.


質問 # 38
......


PECB ISO-IEC-27005-Risk-Manager 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • ISO
  • IEC 27005 に基づく情報セキュリティ リスク管理フレームワークとプロセス: ISO
  • IEC 27005 を中心に据えたこのドメインは、情報セキュリティ リスクを管理するための構造化されたガイドラインを提供し、国際的な慣行に沿った体系的かつ標準化されたアプローチを促進します。
トピック 2
  • 情報セキュリティ リスク管理プログラムの実装: このドメインでは、組織のフレームワーク内でセキュリティ リスクを認識、評価、および軽減する手順を含む、リスク管理プログラムの設定と運用化の手順について説明します。
トピック 3
  • 情報セキュリティ リスク管理の基本原則と概念: このドメインでは、情報セキュリティにおけるリスク管理の背後にある基本的な考え方と中核要素を取り上げ、貴重なデータと IT リソースを保護するための潜在的な脅威を特定して軽減することに重点を置いています。
トピック 4
  • その他の情報セキュリティリスク評価方法: このドメインでは、ISO
  • IEC 27005 を超えて、リスクを評価および管理するための代替方法を検討し、組織が特定の要件とリスクプロファイルに最適なツールとフレームワークを選択できるようにします。

 

最新ISO-IEC-27005-Risk-Managerテスト問題集を試そう!更新されたPECB試験が合格できます:https://www.passtest.jp/PECB/ISO-IEC-27005-Risk-Manager-shiken.html

検証済み!ISO-IEC-27005-Risk-Manager問題集と解答でISO-IEC-27005-Risk-Managerテストエンジン正確解答付き:https://drive.google.com/open?id=14Enf2FBr4X4iP-lhIMCek3o3HtZD8Wsy