質問 # 27
Which type of Master Data will be represented by the Master Data Type LOCATIONFR?

  • A. Virtual Master Data Type
  • B. Compound Master Data Type
  • C. Reference Master Data Type
  • D. External Master Data Type

正解:C


質問 # 28
You are invited to review a problem with a customer's SAP IBP Excel template performance.What areas with the biggest potential performance impact would you focus on?Note: There are 2 correct answers to this question.

  • A. Complex calculation graphs for key figures
  • B. Number of analytics charts displaying key figures' values
  • C. Number of local members and complexity of calculations
  • D. Excessive SAP IBP formatting in the Microsoft Excel UI

正解:A、D


質問 # 29
You are starting a new implementation project for SAP IBP and are considering the possible system architecture.What are the possible approaches for setting up the system landscape?Note: There are 2 correct answers to this question.

  • A. Create additional test planning areas in the production system to support cutover needs.
  • B. Set up a three-tier landscape using transport, starting from the development system to test and production.
  • C. Create additional planning areas in the test system to support training needs.
  • D. Set up a two-tier landscape, and have the configuration of the development system regularly updated from the production system.

正解:B、D


質問 # 30
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?Note:
There are 3 correct answers to this question.

  • A. It checks whether the required planning level master data exists for a subset of input key figures.
  • B. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
  • C. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
  • D. It checks whether the sourcing in the Production Source Item Master Data type exists.
  • E. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.

正解:A、B、E


質問 # 31
What does ABC/XYZ segmentation allow you to do?Note: There are 2 correct answers to this question.

  • A. Choose time-independent key figures as segmentation measures.
  • B. Substitute missing values in case of sporadic demands.
  • C. Identify inventory items that require closer attention.
  • D. Use forecasting algorithms that are specific to seasonal demands of SKUs in the segment "B".

正解:A、C


質問 # 32
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note:
There are 3 correct answers to this question.

  • A. Adjusted transport receipts
  • B. Transportation lead times
  • C. Aggregated constraints
  • D. Maximum lot size
  • E. Minimum lot size

正解:A、B、D


質問 # 33
Which features apply to quota violations modeled with the optimizer?

  • A. Because quota violations shouldn't be possible, the non-delivery cost rate is less than quota violation cost.
  • B. Quotas can be modeled for sourcing location, production, and consensus demand.
  • C. Min and Max Quotas have to be the same as sourcing ratios.
  • D. The optimizer will only violate quotas if quotas are maintained as time-dependent key figures.

正解:A


質問 # 34
What is a prerequisite for modeling outsourced manufacturers with production capacity using the Supply Optimizer?

  • A. Model target inventory and stocks at the outsourced manufacturing location
  • B. Model relative production costs across internal locations and outsourced manufacturing locations
  • C. Use production lead times and offsets to manage components at the outsourced manufacturing location
  • D. Ensure that the outsourced manufacturing locations have a separate subnetwork

正解:B


質問 # 35
Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation?Note: There are
2 correct answers to this question.

  • A. The key figure is stored and all editable.
  • B. The key figure is calculated and system editable.
  • C. The key figure is calculated and all editable.
  • D. The key figure is stored and system editable.

正解:A


質問 # 36
What actions can be performed in the Advanced Dashboards application?Note: There are 3 correct answers to this question.

  • A. Display all assigned analytics on a single UI.
  • B. Rename the charts.
  • C. Use drill-down functionality.
  • D. Link two analytics charts.
  • E. Add process templates.

正解:A、C、E


質問 # 37
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note: There are 2 correct answers to this question.

  • A. Add a new time profile level to the time profile.
  • B. Change the past and future horizon of the levels in the time profile.
  • C. Change the numbering hierarchy of the period IDs in the time profile.
  • D. Change the description of the attributes in the time profile.

正解:B、D


質問 # 38
You need to define a new logic for a key figure to drive values from the PERPRODCUSTREGION level to the PERPRODCUST level.Which of the following configuration options are possible for this process?Note: There are 2 correct answers to this question.

  • A. Splitting the values from aggregated to detailed level using multiplication by the proportions
  • B. Splitting the values from detailed to aggregated level by using a copy operator
  • C. Splitting the values from aggregated to detailed level, based on a stored split-factor key figure
  • D. Splitting the values from aggregated to detailed level, based on the time profile attribute

正解:A、C


質問 # 39
You are implementing SAP IBP to plan for a supply chain that experiences high seasonality.What supply planning operators can be used in your model to plan stock pre-builds?

  • A. Finite and infinite heuristics
  • B. Supply optimizer and supply heuristics
  • C. Supply optimizer only
  • D. Finite heuristics only

正解:B


質問 # 40
Which of the following data inputs, when increased, will always cause an increase in the safety stock outputs when the Global (multi-stage) Inventory Optimization operator is run?Note: There are 2 correct answers to this question.

  • A. Transportation Lead Time Error CV
  • B. Minimum Lot Size
  • C. Holding Cost Percentage
  • D. Target Service Level

正解:B、D


質問 # 41
What are the outputs of the Calculate Target Inventory Components Operator?Note: There are 3 correct answers to this question.

  • A. Component Usage
  • B. Reorder Point
  • C. Target Cycle Stock
  • D. Target Pipeline Stock
  • E. Recommended Safety Stock

正解:C、D、E


質問 # 42
Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation?Note: There are 2 correct answers to this question.

  • A. The key figure is stored and all editable.
  • B. The key figure is calculated and system editable.
  • C. The key figure is calculated and all editable.
  • D. The key figure is stored and system editable.

正解:A


質問 # 43
You created a key figure and want to add calculations.Which of the following rules do you consider?Note: There are 2 correct answers to this question.

  • A. Key figures can be calculated across different planning levels.
  • B. The calculation chain for a key figure must always result in a calculated key figure.
  • C. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
  • D. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.

正解:A、C


質問 # 44
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note: There are 3 correct answers to this question.

  • A. You can only apply one value-based filter per planning view.
  • B. The alerts dashboard is not available if a value-based filter is set for the open planning view.
  • C. These filters can be used together with attribute totals in the same planning view.
  • D. These filters are always applied based on the values stored in the database.
  • E. You can add (or delete) planning objects to a planning view after these filters are applied.

正解:A、B、D


質問 # 45
Which sets of chart types are provided within the Analytics Advanced application?Note: There are 3 correct answers to this question.

  • A. Seasonal Chart Types
  • B. Trend Chart Types
  • C. Geographic Chart Types
  • D. Comparison Chart Types
  • E. Simulation Chart Types

正解:A、B、D