
練習できるSAP Certified Associate C-P2W22-2504問題集オンライン試験練習テスト詳細な解釈付き!C-P2W22-2504合格にストレスなし!
C-P2W22-2504練習テスト2026年最新ので更新されました
質問 # 34
How can you limit the validity of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. By material type
- B. By material status
- C. By change number
- D. By plant
正解:A、D
質問 # 35
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.
- A. Assign the overall profile to the authorization profile
- B. Create an object selection variant for production-planning-related alerts
- C. Create an object selection variant for alerts according to the priority of ATP categories
- D. Assign the alert profile to the overall profile
正解:B、D
質問 # 36
How do you assign resources in a master recipe with operations and phases?
- A. You assign resources to the header of the master recipe.
- B. You assign resources to the operations.
- C. You assign resources to the sub-operations.
- D. You assign resources to the phases.
正解:B
質問 # 37
Which of the following elements does MRP take into account during net requirement calculation?
Note: There are 2 correct answers to this question.
- A. Planned orders (unfirmed)
- B. Production orders
- C. Planned orders (firmed)
- D. ATP quantities
正解:B、C
質問 # 38
In which master data objects do you maintain data to determine the duration of an operation for production?
Note: There are 2 correct answers to this question.
- A. Work center
- B. Routing
- C. Material master
- D. Production version
正解:A、B
質問 # 39
What is the difference between co-products and by-products?
Note: There are 2 correct answers to this question.
- A. Only co-products have movement type 101.
- B. Only co-products appear in the process or production order settlement rule.
- C. Only co-products have movement type 531.
- D. Only co-products have a non-zero inventory valuation.
正解:A、D
質問 # 40
What are the selection criteria of a bill of material (BOM) alternative?
Note: There are 2 correct answers to this question.
- A. Change number
- B. Date
- C. Lot size
- D. Material BOM usage
正解:B、C
質問 # 41
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision?
Note: There are 3 correct answers to this question.
- A. Storage location MRP areas are required to manage sales-order-specific stock.
- B. Net requirements calculation is carried out for every sales order individually.
- C. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
- D. Planned orders are created in MRP with reference to sales orders.
- E. Production and procurement costs are managed on the sales order item level.
正解:B、D、E
質問 # 42
Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. In which storage location is the BOM required?
- B. When does the BOM need to become effective?
- C. For which plant can the BOM be defined?
- D. Which base unit of measure must the BOM have?
正解:B、C
質問 # 43
What is the purpose of the pull list in material staging?
- A. To control the flow of material from the supplier to the central storage location
- B. To control the flow of material from the central storage location to the production storage location
- C. To control the flow of material from the production storage location to the central storage location
- D. To control the flow of material from the supplier to the production storage location
正解:B
質問 # 44
What are some advantages of using Kanban for material supply? Note: There are 2 correct answers to this question.
- A. Replenishment is only triggered when components are required.
- B. Material is only kept available in small quantities in production.
- C. Material stock is built up for a long period of time in production.
- D. Replenishment is always triggered on a regular basis.
正解:A、B
質問 # 45
What are some SAP recommended guiding principles to achieve clean core operations?
Note: There are 3 correct answers to this question.
- A. Establish release management.
- B. Define roles and responsibilities as part of a process transformation office.
- C. Establish regular housekeeping tasks and procedures.
- D. Establish an organizational structure, technical foundation, and transformation methodology for clean core.
- E. Integrate clean core practices in the end-to-end value process chain.
正解:A、B、D
質問 # 46
You want to create a production order.
What methods can you use?
Note: There are 2 correct answers to this question.
- A. Convert a purchase requisition
- B. Create by order release
- C. Create in Kanban process
- D. Create without material
正解:C、D
質問 # 47
Which of the following processes lead to an indicator in the planning file?
Note: There are 2 correct answers to this question.
- A. Changing an operation time
- B. Changing a dependent requirement
- C. Changing a delivery address
- D. Changing a storage bin
正解:A、B
質問 # 48
You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received.
Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semi-finished material?
- A. Assembly processing with production orders (82)
- B. Planning with final assembly (40)
- C. Production by lot size (30)
- D. Planning at assembly level (70)
正解:D
質問 # 49
Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.
- A. The same account category is used.
- B. The same batch management level is used.
- C. The quantity and value updates are the same.
- D. The same base unit of measure is used.
正解:C、D
質問 # 50
......
今すぐ試そうC-P2W22-2504練習試験解答:https://drive.google.com/open?id=1uR9qLti5wf17ss3Ng7iis6Lway45jDtN
ベストC-P2W22-2504学習材料と試験準備問題はここにある:https://www.passtest.jp/SAP/C-P2W22-2504-shiken.html