質問 37
Which organizational units are directly linked to a plant? Note: There are 2 correct Answers to this question.
- A. Credit control area
- B. Company code
- C. Storage location
- D. Sales office
正解: B,C
質問 38
Which of the following are features of Inventory Management? Note: There are 3 correct Answers to this question.
- A. Stock value management
- B. Stock types management
- C. Stock management at bin level
- D. Storage types management
- E. Special stocks management
正解: A,C,E
質問 39
What are features of the Stock Transfer without Delivery (BMH) scope item? Note: There are 2 correct Answers to this question.
- A. You can transfer quality inspection stock
- B. You can enter planned delivery costs
- C. You can monitor stock in transit
- D. You can maintain shipping data manually
正解: C,D
質問 40
Which steps are required for data load preparation? Note: There are 3 correct Answers to this question.
- A. Determine data requirements based on scenario reviews
- B. Review data load templates and determine data mapping
- C. Perform full data load to determine the required loading times
- D. Determine if public or private cloud is required for data migration
- E. Design programs or reports required to extract data and initiate data cleansing
正解: B,C,E
質問 41
What is one purpose of the Supply Protection (SUP) feature?
- A. Propose framework agreements with suppliers to secure supply quantities
- B. Sell products in the sequence of incoming customer orders
- C. Protect yourself from unreliable suppliers
- D. Reserve quantities for a category of customers
正解: B
質問 42
What does the Alternative-Based Confirmation (ABC-ATP) allow? Note: There are 3 correct Answers to this question.
- A. Postpone confirmed orders with lower priority
- B. Create partial confirmations in multiple plants
- C. Check against alternative sources of supply
- D. Substitute the delivering plant in the sales order item
- E. Replace a requested material with an alternative one
正解: C,D,E
質問 43
Which of the following tasks can you perform using the Post Goods Movement (MIGO) app? Note: There are 3 correct Answers to this question.
- A. Search for purchase orders
- B. Display a material document
- C. Post a stock transfer between two plants
- D. Post a component backflush
- E. Create a material reservation
正解: A,B,C
質問 44
You procure some materials exclusively via subcontracting. You want Material Requirements Planning (MRP) to create subcontract purchase requisitions for these materials instead of normal purchase requisitions. What must you do for each of these materials? Note: There are 2 correct Answers to this question.
- A. Set a special MRP group for subcontracting in the material master record
- B. Create a routing with an operation to be processed externally
- C. Set a special procurement type for subcontracting in the material master record
- D. Create a bill of material with the components to be provided
正解: C,D
質問 45
What are the available methods through which you can fill staging tables in the SAP HANA database of the target system? Note: There are 3 correct Answers to this question.
- A. Customer's ETL tools
- B. SAP SQL Anywhere
- C. XML templates
- D. SAP HANA Smart Data Integration (SDI)
- E. SAP Smart Data Access
正解: C,D,E
質問 46
Which price is used to evaluate a cross-plant stock transfer posting?
- A. The valuation price of the material in the receiving plant
- B. The valuation price of the material in the issuing plant
- C. The price that the user must enter when posting the stock transfer
- D. The mean value of the material's valuation prices in issuing and receiving plants
正解: B
質問 47
A customer needs detailed customization to the standard forms and email templates. What solution should the consultant propose?
- A. Create a custom UI with the Custom Fields and Logic app
- B. Use the corresponding configuration items to modify elements of the form template
- C. Use the Output Management apps to customize a standard template
- D. Use the Adobe Livecycle Designer tool to edit a standard template
正解: D
質問 48
How can business users create new analytics content? Note: There are 3 correct Answers to this question.
- A. Change underlying database tables of standard data sources
- B. Change existing data sources by adding filters
- C. Create new data sources via joins of standard data sources
- D. Combine current and historical data
- E. Create additional key figures in existing data sources
正解: A,C,E
質問 49
In a direct material procurement process, what can you use App Manage Material Coverage for? Note:
There are 3 correct Answers to this question.
- A. Revoke acceptance of shortage for selected materials
- B. Convert a purchase requisition into a purchase order
- C. Create forecast delivery schedules for the material being processed
- D. Mark a purchase order change request to the supplier
- E. Start an MRP run for the material being processed
正解: B,D,E
質問 50
Why is de-coupling your extensions from SAP S/4HANA Cloud required? Note: There are 2 correct Answers to this question.
- A. To guarantee the stability of the system
- B. To enhance existing functionality within the application itself
- C. To ensure extensions do not conflict with SAP software updates
- D. To allow customers to take advantage of predefined user exits
正解: A,C
質問 51
What can influence the Product Availability Check during the creation of a sales order? Note: There are 2 correct Answers to this question.
- A. The material
- B. The plant
- C. The customer material info record
- D. The customer
正解: C,D
質問 52
How is the productive system configured? Note: There are 2 correct Answers to this question.
- A. Through the Solution Documentation component of the SAP Solution Manager
- B. Via the Cloud Application Lifecycle Management (CALM) Implementation Portal
- C. Through transports from the quality system
- D. Through Central Business Configuration (CBC) in SAP Business Technology Platform
正解: A,B
質問 53
Which characteristics apply to a shipping point? Note: There are 2 correct Answers to this question.
- A. Several shipping points can be assigned to one plant.
- B. A shipping point is assigned to exactly one plant.
- C. A shipping point is determined when the sales order is created.
- D. A shipping point is stored at sales order header level.
正解: A,C
質問 54
You test the various options that SAP S/4HANA Cloud offers for stock transfers between two different plants within the same company code. Which special features do stock transport orders have? Note:
There are 2 correct Answers to this question.
- A. You can optionally post the goods issue from inspection stock in the supplying plant.
- B. The material on the road is part of the valuated stock of the shipping plant.
- C. If necessary, you can post the goods receipt to blocked stock in the receiving plant.
- D. The material on the road is managed in the stock in transit of the receiving plant.
正解: C,D
質問 55
Which of the following Business Add-In (BAdI) functionalities can be defined in the app Create Batch (MSC1N) with in-app extensibility? Note: There are 2 correct Answers to this question.
- A. Edit batch-specific material unit of measure
- B. Specify batch management default by plant
- C. Suppress the internal number assignment for batches
- D. Generate batch numbers based on your own criteria
正解: C,D