
[2023年11月]更新のC_TS413_2021試験問題と有効なC_TS413_2021問題集PDF
C_TS413_2021ブレーン問題集学習ガイドにはヒントとコツで試験合格を目指そう
質問 # 15
Which of the following statements about orders with operation account assignment (OAA) are correct? Note: There are 3 correct answers to this question.
- A. A technical object must be assigned to an order operation.
- B. The settlement rule is maintained on header level.
- C. Costs are only stored for the operation object.
- D. Purchase requisitions have the operation as account assignment.
- E. Overall costs are dynamically summed up on header level.
正解:A、C、E
質問 # 16
Which statements regarding a maintenance order with status RELare correct? Note: There are 3 correct answers to this question.
- A. The controller can determine actual cost surcharges.
- B. The planner can change estimated costs only at header level.
- C. Goods receipts for external services can be entered.
- D. The planner can change planned costs at operation level.
- E. Shop papers can only be printed after the order release.
正解:C、D、E
質問 # 17
Which of the following statements about SAP Asset Manager aretrue? Note: There are 3 correct answers to this question.
- A. SAP Asset Manager can be used offline.
- B. SAP Asset Manager is available for SAP S/4HANA and SAPERP.
- C. SAP Asset Manager can run on smart watches.
- D. SAP Asset Manager can be used offline.
- E. SAP Asset Manager is available for Windows platform.
正解:A、B、D
質問 # 18
In which cases are projects (PS) used in the area of SAP S/4HANAAsset Management? Note: There are 2 correct answers to this question.
- A. Investments
- B. Shutdowns and overhaul
- C. External refurbishment
- D. Condition-based maintenance
正解:A、B
質問 # 19
You want to view transactional and analytical processing data in the Technical Object Breakdowns SAP Fiori app. What is the source of the information?
- A. BW InfoCube
- B. Core Data Services (CDS view)
- C. InfoSet for SAP Query
- D. BW query
正解:B
質問 # 20
Which functionalities are available in the SAP Asset Manager fora maintenance worker? Note: There are 2 correct answers to this question.
- A. Display maps. Display and maintain technical objects
- B. Confirm time sheets. Attach documents
- C. Change BOM. Create a work order on the ESRI map
- D. Schedule resources. Change task list
正解:A、B
質問 # 21
You want to set up a scenario for regular maintenance. The first event should take place after 1 year; after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in thesystem?
- A. Shift factor
- B. Maintenance package offset
- C. Maintenance plan category
- D. Scheduling indicator
正解:B
質問 # 22
You want to create a new functional location. Which configurationsteps are required? Note: There are 2 correct answers to this question.
- A. Define the number range for the functional location category.
- B. Define the structure indicator.
- C. Define the reference functional location.
- D. Define the functional location category.
正解:B、D
質問 # 23
The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? Note: There are 2 correct answers to this question.
- A. All open reservations are closed when the maintenance order isset to TECO.
- B. Open reservations can be cleared when a maintenance order operation is finally confirmed.
- C. Reservations are created only after a material availability checkhas been performed.
- D. For the combination of order type and planner group you can decide when reservations are created.
正解:A、B
質問 # 24
Which activities can the technician perform with the Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to thisquestion.
- A. Put in Process.
Schedule - B. Release. Print
- C. Complete. Close Report
- D. Release. Start Work
正解:C、D
質問 # 25
Which statements related to the creation of maintenance orders arecorrect? Note: There are 2 correct answers to this question.
- A. The document within the document management system canbe assigned only at operational level.
- B. The assignment of the header notification to an order CANNOTbe deleted.
- C. The long text of the reference notification can be automatically copied as the long text of the order.
- D. When an order is created based on a single notification, this notification becomes the header notification.
正解:C、D
質問 # 26
You are analyzing the data transfer of the cost center of an equipment. What are the possible data origins? Note: There are 2correct answers to this question.
- A. The individual maintenance of the cost center in the equipment master record
- B. The cost center of the related maintenance work center
- C. The cost center of the superior equipment
- D. The reference functional location of the superior functional location
正解:A、C
質問 # 27
Which of the following are components of cloud-based SAP Intelligent Asset Management? Note: There are 2 correct answers tothis question.
- A. SAP Predictive Maintenance and Service
- B. SAP Asset Manager
- C. SAP Work Manager
- D. Worker safety applications
正解:A、B
質問 # 28
In which of the following locations can object information can be found
- A. In Notification
- B. Din master record of technical object
- C. In document
- D. In Order
正解:D
質問 # 29
You want to assign a maintenance planning plant directly to an organizational unit. Which of the following units can you use?
- A. Maintenance planner groups
- B. Controlling area
- C. Maintenance work center
- D. Location
正解:A
質問 # 30
You have created a new equipment category, "linear", with the corresponding view profile. Which fields appear in the equipment linear data tab? Note: There are 3 correct answers to this question.
- A. Object network
- B. Segment
- C. Start marker
- D. Type of offset
- E. Unit of measure
正解:C、D、E
質問 # 31
What does a virtual data model provides
- A. Ready to use business reports
- B. Reporting tools for users
- C. consumption ready views of data
- D. A copy of the database optimized for analytical purpose
正解:C
質問 # 32
Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 3correct answers to this question.
- A. Change the settlement rule.
- B. Change the planned costs.
- C. Create an invoice receipt for delivered materials.
- D. Update the estimated costs
- E. Lock or unlock the order.
正解:A、C、E
質問 # 33
During the implementation project you need to define the organizational units relevant for Plant Maintenance. Which of the following objects can you directly assign to a maintenance plant? Note: There are 2 correct answers to this question.
- A. Storage location
- B. Maintenance work center
- C. Business partner
- D. Maintenance planner group
正解:A、B
質問 # 34
Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct answers to this question.
- A. Order type
- B. Call object
- C. Completion date
- D. Maintenance activity type
- E. Change documents
正解:A、B、C
質問 # 35
The first release of SAP asset manager mobile application is based on
- A. IOS,Android, Windows
- B. ios and android
- C. ios only
- D. Windows only
- E. Android only
正解:C
質問 # 36
You want to set up a general maintenance task list for inspectionrounds using the overall time confirmation as a simplified way torecord measurement documents. What do you need to do? Note: There are 2 correct answers to this question.
- A. Assign an inspection document as PRT to the task list operation.
- B. Assign a piece of equipment with an allocated measuring point to a task list operation.
- C. Assign a measuring point as a production resources/tools(PRT) to a task list operation.
- D. Assign an inspection lot to the task list header.
正解:B、C
質問 # 37
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.
- A. Factory calendar
- B. Scheduling indicator
- C. Start date
- D. Scheduling period
正解:C、D
質問 # 38
Which parameter in a maintenance strategy do you use to set thestart/end date of the maintenance order?
- A. Call horizon
- B. Package offset
- C. Initial/subsequent buffer
- D. Package hierarchy
正解:C
質問 # 39
What is the function of the print diversion setting?
- A. It enables you to define which shop papers are printed as a system default.
- B. It enables you to determine which papers are printed for the technician.
- C. It enables you to chose a printer based on certain fields in the order.
- D. It tells the system that a shop paper for an order is ready to be printed.
正解:C
質問 # 40
......
C_TS413_2021試験問題無料PDFダウンロード 最近更新された問題です:https://www.passtest.jp/SAP/C_TS413_2021-shiken.html
C_TS413_2021認定試験問題集には90練習テスト問題:https://drive.google.com/open?id=1X16TviJMfYFgBUaqWtyWCRVAKAYCjVBv