質問 # 34
The information displayed on Project Workspace is setup in which table?
- A. vtb_card
- B. pm_home_page_card
- C. pm_project
- D. vtb_card_history
正解:B
質問 # 35
The hourly rate is derived from the resource rate on the resource plan, if this option is selected.
- A. Planned cost
- B. Rate model
- C. Labor rate card
- D. Rate override
正解:B
質問 # 36
What is the demand workbench used for? (Choose two.)
- A. Approving demands.
- B. Displaying submitted demands to stakeholders.
- C. Comparing demands with portfolios.
- D. Comparing and prioritizing demands against other demands.
正解:B、D
質問 # 37
Which capability allows users to view variances in a project's schedule?
- A. Machine-learning algorithms
- B. Compare scheduled baselines
- C. Move project
- D. Project Status Report
正解:B
質問 # 38
What role can create or modify a rate model?
- A. time_card_admin.
- B. it_pps_admin.
- C. release_admin.
- D. push_admin.
正解:B
質問 # 39
The RIDAC workflow can be modified by using which feature?
- A. Project Form
- B. Idea Portal
- C. Service Catalog
- D. Flow Designer
正解:A
質問 # 40
In the base system, what is the default number of cards that can be displayed in the project workspace?
- A. 0
- B. 1
- C. 2
- D. 3
正解:B
質問 # 41
In what way would you restrict the assigned to field on a project task to only allow users with resource allocations to be assigned?
- A. The system automatically does this and can only be disabled by an admin.
- B. On the project record under the preferences tab select the "Derive assignee list from resource plan" preference.
- C. Create an Access Control List (ACL) rule.
- D. Create a reference qualifier on the 'assigned to' field.
正解:B
質問 # 42
A project expense line is a cost associated with a specific source. Examples of specific sources could include:
(Choose three.)
- A. Configuration Item (CI).
- B. Demand.
- C. Project.
- D. User.
- E. Fixed Asset.
正解:A、D、E
質問 # 43
Where do you define 'Roles' requested via resource plans?
- A. Under skill management modules
- B. No need to define it differently, they are same are system roles
- C. Resource roles under resource management.
- D. Roles under system security
正解:C
質問 # 44
Which of the following checks to see if the assessable record exists for the demand and creates an assessable record if none exists?
- A. Validate Assessment Metrics for Demand
- B. Auto Business Rule for Assessments
- C. Update Demand State
- D. Create OnDemand Assessment
正解:D
質問 # 45
If a user creates a new demand from the demand workbench, what state will the system save the record in?
- A. draft
- B. qualified
- C. open
- D. approved
正解:B
質問 # 46
Where can a user export project data in either a MPP, XML or CSV format?
- A. Demand Form
- B. Project Workbench
- C. Planning Console
- D. Related lists
正解:C
質問 # 47
Where are CAPEX and OPEX targets set for each fiscal year?
- A. Demand Workbench
- B. Program Workbench
- C. Portfolio Target
- D. Cost Plans
正解:C
質問 # 48
What is the default schedule for a project?
- A. 9-hour workday (from 8 to 12 and from 1 to 5).
- B. 8-hour workday (from 9 to 5).
- C. 8-hour workday (from 8 to 12 and 1 to 5).
- D. 8-hour workday (from 9 to 12 and 1 to 6).
正解:C
質問 # 49
Which roles can modify agile properties? (Choose two.)
- A. product_owner.
- B. scrum_master.
- C. it_pps_admin.
- D. admin.
正解:C、D
質問 # 50
Which of the following states appear in the process flow indicator at the top of the Demand form by default?
(Choose three.)
- A. Deferred
- B. Approved
- C. Screening
- D. Draft
- E. Updated
正解:B、C、D
質問 # 51
......