2024年最新のに更新されたのはC-S4CMA-2308テストエンジンとPDFで完全版無料問題集保証! [Q27-Q46]

Share

2024年最新のに更新されたのはC-S4CMA-2308テストエンジンとPDFで完全版無料問題集保証!

最新のSAP Certified Application Associate C-S4CMA-2308実際の無料試験問題

質問 # 27
Which app do you use to extend the existing organizational units?

  • A. Manage Teams and Responsibilities
  • B. Extensibility Cockpit
  • C. Manage Your Solution
  • D. Import Employees

正解:C


質問 # 28
What SAP Fiorf app can you use in the SAP Best Practices Scenario Rework Processing - Stock Manufactured Material (BJN)?

  • A. Manage Purchase Requisitions
  • B. Manage Supplier Invoices
  • C. Manage PIRs
  • D. Manage Production Operations

正解:D


質問 # 29
In the SAP Ariba payment and discount management process, which step comes immediately after the "suggest a discount for early processing" step?

  • A. Evaluate payment suggestion
  • B. Update payment proposal
  • C. Release invoice for payment
  • D. Start payment run

正解:A


質問 # 30
When a purchase order is created in the headquarters system in the Subsidiary as Production Unit and Internal Supplier to Headquarters (21T) scope item, what is automatically uploaded to the subsidiary system?

  • A. A purchase requisition
  • B. A sales order
  • C. A production order
  • D. A planned order

正解:B


質問 # 31
In which implementation phase do you perform data load preparation?

  • A. Realice
  • B. Explore
  • C. Deploy
  • D. Prepare

正解:A


質問 # 32
Which adjustments can be made using the Query Builder? (3 correct) *

  • A. Copy a query from an SAP-delivered standard query
  • B. Add business logic to queries
  • C. Create parameters to read values from the user settings
  • D. Create custom Core Data Services (CDS) views for use in queries
  • E. Add, remove, or customize fields in queries

正解:B、C、E


質問 # 33
Which of the following changes would prevent SAP from running automated business Process tests on your behalf? Note: There are 2 correct answers to this question.

  • A. SAP-made changes to the standard test process
  • B. Changes to the SAP S/4HANA Cloud release (upgrade)
  • C. Changes to the data input requirements (custom data fields)
  • D. Configuration changes that impact the process flow

正解:A、D


質問 # 34
How can customers activate additional SAP Best Practices processes? (3 correct)

  • A. Request activation in the Production system after it is upgraded tu the latest quarter's release
  • B. Request activation in the Starter system from the SAP Service Center during the Deploy phase
  • C. Request activation in the Starter system through the SAP Cloud Platform during the Realize phase
  • D. Request activation in the Quality system after it is upgraded to the latest quarter's release
  • E. Request activation in the Quality system from the SAP Service Center during the Run Phase

正解:A、B、E


質問 # 35
Which parameters can you manage in the Manage Buffer Levels app in Demand-Driven Buffer Level Management (1Y2)? (3 correct) *

  • A. Waiting time
  • B. Maximum stock
  • C. Float before production
  • D. Reorder point
  • E. Safety stock

正解:A、B、E


質問 # 36
In the Quality Engineer Overview app, which types of inspection lots can you view? (2 correct)

  • A. Inspection lots without a usage decision
  • B. Inspection lots without a quality engineer assignment
  • C. Inspection lots without an inspection lot number
  • D. Inspection lots without an inspection plan

正解:C、D


質問 # 37
Which steps are required for data load preparation? (3 correct)

  • A. Determine if public or private cloud is required for data migration
  • B. Design programs or reports required to extrat data and initiate data cleansing
  • C. Perform full data load to determine the required loading times
  • D. Determine data requirements based on scenario reviews
  • E. Review data load templates and determine data mapping

正解:B、D、E


質問 # 38
Which steps are part of the SAP Best Practices Scenario Make-to-Stock Production - Discrete Manufacturing (BJ5)? (3 correct)

  • A. Configure Your Release Conditions for Purchase Order Approval
  • B. Material Staging for Final Assembly
  • C. Material Staging for Subassembly
  • D. Execute Back Order Processing
  • E. Confirm Production Operations for Final Assembly

正解:B、C、E


質問 # 39
What are the prerequisites for using the SAP Fiori Test Your Processes app? (2 correct)

  • A. The productive system is connected to the implementation landscape
  • B. The quality system is connected to the Test Execution Service on SAP Cloud Platform
  • C. The test scripts are uploaded in the productive system
  • D. SAP Best Practices are activated in the quality system

正解:B、D


質問 # 40
When can you add relationships in the Organizational Structure? (2 correct)

  • A. After one entity has been created
  • B. Before initial content activation
  • C. During content activation
  • D. After content activation

正解:A、D


質問 # 41
In the SAP Best Practices scenario Quality Management in Discrete Manufacturing (1E1), which valuation methods does the Record Inspection Results app offer? (2 correct)

  • A. Comparison of acceptance number and number of nonconforming units (valuation mode 110)
  • B. Mean value check within a tolerance range (valuation mode 700)
  • C. Attributive inspection of nonconforming units (valuation mode 100)
  • D. Manual valuation (valuation mode 500)

正解:A、B


質問 # 42
Which functionalities are supported by the SAP Fiori Test Your Processes app? (2 correct)

  • A. Create or change test plans
  • B. Import custom test plans
  • C. Migrate test plans for execution
  • D. Remediate failed test scenarios

正解:A、D


質問 # 43
Which activity do you perform during the data load preparation?

  • A. Fill in migration templates with legacy data
  • B. Define specifications for data extraction on legacy system
  • C. Resolve data issues from the simulation process
  • D. Simulate data load in the new cloud system

正解:B


質問 # 44
What can a business user do with personal settings? Note: There are 2 correct answers to this question.

  • A. Modify the UI layout of the app.
  • B. Change the order of columns in a table.
  • C. Merge two or more columns into a single column.
  • D. Change the format of dates and numbers.

正解:B、D


質問 # 45
What are customers able to scope in SAP S/4 HANA Cloud with Central Business Configuration (CBC)? (3 correct)

  • A. Public sector processes
  • B. Pre-defined scenario bundles
  • C. Non-standard scenarios
  • D. Countries where business processes will run
  • E. Scope extensions

正解:B、C、D


質問 # 46
......

C-S4CMA-2308問題集には更新された練習テストと162独特な問題:https://www.passtest.jp/SAP/C-S4CMA-2308-shiken.html

最新の100%試験合格率爆上がり C-S4CMA-2308問題集PDF:https://drive.google.com/open?id=1QXvNTiwy3uW273G8MB_bHYcwSswhD5qU