2024年06月本日更新されたC_ARSUM_2308試験問題集PDF試験エンジン無料! [Q16-Q35]

Share

2024年06月本日更新されたC_ARSUM_2308試験問題集PDF試験エンジン無料!

こちらには最新版のC_ARSUM_2308リアル試験解答!

質問 # 16
Your customer needs to collect detailed information from suppliers to determine if they are qualified to provide products or services in a specific category. Which SAP Ariba Supplier Management solution do you suggest?

  • A. SAP Ariba Supplier Lifecycle and Performance
  • B. SAP Ariba Supplier Information and Performance Management
  • C. SAP Ariba Supplier Risk
  • D. SAP Ariba Supply Chain Collaboration

正解:A


質問 # 17
Which groups should your customer consider removing from users if they want to reduce their user licenses in SAP Ariba Supplier Lifecycle and Performance? Note: There are 2 correct answer to this question

  • A. Supplier Qualification Manager
  • B. Supplier Internal Questionnaire Editor
  • C. Sensitive Data Access
  • D. SM Modular Questionnaire Manager

正解:A、C


質問 # 18
Your customer wants to ask a different set of questions for supplier qualifications in North America, South America, and Europe. How do you configure these questions in your customer's Supplier Qualification Project template?

  • A. Add the questions to separate content documents mapped to each region
  • B. Assign region-based visibility conditions within the qualification questionnaire survey
  • C. Create separate modular questionnaires to be sent to suppliers during the qualification process
  • D. Update the user matrix to assign the appropriate questionnaire based on the region selected

正解:C


質問 # 19
Your customer has configured pre-grading in their survey. After receiving responses from internal participants, the supplier's score for Innovation/Technology is below the Target Grade value.
What happens next?

  • A. An approval task is created and routes to the supplier manager for review.
  • B. The supplier is invited to respond to the Voice of the Supplier section.
  • C. A notification is sent to the owner of the Supplier Performance Management Project.
  • D. The score is highlighted to indicate that it is below the target.

正解:D


質問 # 20
Your customer has recently renewed a contract with a supplier. As part of this process, the target for their on time delivery KPI has increased to 96%. What should the customer update to reflect this change for future performance reviews?

  • A. The master survey and scorecard in the Supplier Performance Management project template
  • B. The master survey and scorecard in the related Supplier Performance Management project
  • C. The survey and scorecard for the next recurrence period
  • D. The KPI library content document in the sourcing library

正解:B


質問 # 21
What are the benefits of using an approver lookup table in SAP Ariba templates? Note: There are 3 correct answer's to this question

  • A. A range of values can be used to assign approvers.
  • B. It provides a simplistic method of keeping approvals in order.
  • C. More than one project field value can be used to add approvers.
  • D. Conditions can be built within the lookup file.
  • E. The system assigns approvers based on project field values.

正解:A、C、E


質問 # 22
Which supplier management project type allows for multiple templates?

  • A. SM modular questionnaire
  • B. Supplier disqualification
  • C. Supplier registration
  • D. Supplier qualification

正解:A


質問 # 23
Which is a benefit of using pre-grading in Supplier Performance Management projects?

  • A. Increases the amount of automation in the SPM process
  • B. Enables the Target Grade option
  • C. Allows for weight values higher than 100
  • D. Allows team members to provide grading input on survey responses

正解:A


質問 # 24
Which options are available to populate scorecard KPIs with data outside of a survey? Note: There are 2 correct answer to this question

  • A. Map KPIs to items in the supplier registration questionnaire
  • B. Sync values from SAP ERP
  • C. Map KPIs to an existing analytical report
  • D. Manually enter the KPI value

正解:C、D


質問 # 25
Which is an additional benefit of SAP Ariba Supplier Lifecycle and Performance compared to SAP Ariba Supplier Information and Performance Management?

  • A. Modular questionnaire projects
  • B. Preferred supplier management projects
  • C. Supplier workspace projects
  • D. Unified vendor model for suppliers

正解:D


質問 # 26
You are creating a new Supplier Performance Management project template from scratch. Which elements does SAP Ariba support on the Documents tab? Note: There are 2 correct answer to this question

  • A. Folder
  • B. Analytical report
  • C. Recurring phase
  • D. Microsoft Word file

正解:A、B


質問 # 27
What are the benefits of using conditions in SAP Ariba templates? Note: There are 2 correct answer to this question

  • A. To control the visibility of documents, folders, and tasks
  • B. To automatically publish scorecards in the project
  • C. To control the visibility of project groups on the Team tab
  • D. To restrict which supplier can be added to the project

正解:A、C


質問 # 28
Your customer wants a question to be answered by an enterprise user as part of their registration process.
Which option do you recommend?

  • A. Internal questionnaire
  • B. Custom header field
  • C. Custom fact table
  • D. Supplier registration questionnaire

正解:A


質問 # 29
Which action enables the evaluation of a supplier for a preferred status level?

  • A. The supplier updates their registration questionnaire to add qualification details.
  • B. An administrator clicks the sync button to create a record in the ERP system.
  • C. A qualification for the supplier is fully approved.
  • D. The supplier organization is assigned an Ariba Network ID.

正解:C


質問 # 30
Your customer wants to collect bank account details from their suppliers. Which type of document would you recommend?

  • A. External form
  • B. Internal questionnaire
  • C. External questionnaire
  • D. Internal form

正解:C


質問 # 31
Your customer wants to implement governance checks on suppliers based on their internal control policies.
Which SAP Ariba solution do you recommend?

  • A. SAP Ariba Supplier Lifecycle and Performance
  • B. SAP Ariba Supplier Information and Performance Management
  • C. SAP Ariba Supplier Risk
  • D. SAP Ariba Supply Chain Collaboration

正解:C


質問 # 32
On which elements of the engagement is the Residual Risk field in the engagement summary based?

  • A. Issues created during the engagement request process
  • B. answer to the inherent risk screening questionnaire
  • C. Grades submitted on risk assessment questionnaires
  • D. Controls triggered during the engagement request process

正解:A


質問 # 33
Which attributes of Importance should be considered when creating a scoring structure within a survey? Note:
There are 2 correct answer to this question

  • A. The value defines a question's relative importance within a section.
  • B. The total of all Importance values must add up to 100.
  • C. Acceptable values range between 0 and 10.
  • D. Team graders can adjust the value while reviewing responses.

正解:A、C


質問 # 34
You need to use the SM Administration area to configure integration between SAP Ariba Supplier Lifecycle and Performance and an external system. Which system group do you require?

  • A. Supplier Request Manager
  • B. SM ERP Admin
  • C. SM Ops Admin
  • D. Preferred Supplier Manager

正解:B


質問 # 35
......


材料 From:

  1. 2024年最新の C_ARSUM_2308試験問題集で(PDFとテストエンジン)無料提供:https://www.passtest.jp/SAP/C_ARSUM_2308-shiken.html
  2. 2024年最新のC_ARSUM_2308のPDF試験問題集で無料提供:https://drive.google.com/open?id=1GHJT2JBabQ5qf_0n55nuBrRqUKt1MxEY

無料材料を提供しております!お客様の全試験合格を助けます!