質問 # 16
Your customer needs to collect detailed information from suppliers to determine if they are qualified to provide products or services in a specific category. Which SAP Ariba Supplier Management solution do you suggest?
- A. SAP Ariba Supplier Lifecycle and Performance
- B. SAP Ariba Supplier Information and Performance Management
- C. SAP Ariba Supplier Risk
- D. SAP Ariba Supply Chain Collaboration
正解:A
質問 # 17
Which groups should your customer consider removing from users if they want to reduce their user licenses in SAP Ariba Supplier Lifecycle and Performance? Note: There are 2 correct answer to this question
- A. Supplier Qualification Manager
- B. Supplier Internal Questionnaire Editor
- C. Sensitive Data Access
- D. SM Modular Questionnaire Manager
正解:A、C
質問 # 18
Your customer wants to ask a different set of questions for supplier qualifications in North America, South America, and Europe. How do you configure these questions in your customer's Supplier Qualification Project template?
- A. Add the questions to separate content documents mapped to each region
- B. Assign region-based visibility conditions within the qualification questionnaire survey
- C. Create separate modular questionnaires to be sent to suppliers during the qualification process
- D. Update the user matrix to assign the appropriate questionnaire based on the region selected
正解:C
質問 # 19
Your customer has configured pre-grading in their survey. After receiving responses from internal participants, the supplier's score for Innovation/Technology is below the Target Grade value.
What happens next?
- A. An approval task is created and routes to the supplier manager for review.
- B. The supplier is invited to respond to the Voice of the Supplier section.
- C. A notification is sent to the owner of the Supplier Performance Management Project.
- D. The score is highlighted to indicate that it is below the target.
正解:D
質問 # 20
Your customer has recently renewed a contract with a supplier. As part of this process, the target for their on time delivery KPI has increased to 96%. What should the customer update to reflect this change for future performance reviews?
- A. The master survey and scorecard in the Supplier Performance Management project template
- B. The master survey and scorecard in the related Supplier Performance Management project
- C. The survey and scorecard for the next recurrence period
- D. The KPI library content document in the sourcing library
正解:B
質問 # 21
What are the benefits of using an approver lookup table in SAP Ariba templates? Note: There are 3 correct answer's to this question
- A. A range of values can be used to assign approvers.
- B. It provides a simplistic method of keeping approvals in order.
- C. More than one project field value can be used to add approvers.
- D. Conditions can be built within the lookup file.
- E. The system assigns approvers based on project field values.
正解:A、C、E
質問 # 22
Which supplier management project type allows for multiple templates?
- A. SM modular questionnaire
- B. Supplier disqualification
- C. Supplier registration
- D. Supplier qualification
正解:A
質問 # 23
Which is a benefit of using pre-grading in Supplier Performance Management projects?
- A. Increases the amount of automation in the SPM process
- B. Enables the Target Grade option
- C. Allows for weight values higher than 100
- D. Allows team members to provide grading input on survey responses
正解:A
質問 # 24
Which options are available to populate scorecard KPIs with data outside of a survey? Note: There are 2 correct answer to this question
- A. Map KPIs to items in the supplier registration questionnaire
- B. Sync values from SAP ERP
- C. Map KPIs to an existing analytical report
- D. Manually enter the KPI value
正解:C、D
質問 # 25
Which is an additional benefit of SAP Ariba Supplier Lifecycle and Performance compared to SAP Ariba Supplier Information and Performance Management?
- A. Modular questionnaire projects
- B. Preferred supplier management projects
- C. Supplier workspace projects
- D. Unified vendor model for suppliers
正解:D
質問 # 26
You are creating a new Supplier Performance Management project template from scratch. Which elements does SAP Ariba support on the Documents tab? Note: There are 2 correct answer to this question
- A. Folder
- B. Analytical report
- C. Recurring phase
- D. Microsoft Word file
正解:A、B
質問 # 27
What are the benefits of using conditions in SAP Ariba templates? Note: There are 2 correct answer to this question
- A. To control the visibility of documents, folders, and tasks
- B. To automatically publish scorecards in the project
- C. To control the visibility of project groups on the Team tab
- D. To restrict which supplier can be added to the project
正解:A、C
質問 # 28
Your customer wants a question to be answered by an enterprise user as part of their registration process.
Which option do you recommend?
- A. Internal questionnaire
- B. Custom header field
- C. Custom fact table
- D. Supplier registration questionnaire
正解:A
質問 # 29
Which action enables the evaluation of a supplier for a preferred status level?
- A. The supplier updates their registration questionnaire to add qualification details.
- B. An administrator clicks the sync button to create a record in the ERP system.
- C. A qualification for the supplier is fully approved.
- D. The supplier organization is assigned an Ariba Network ID.
正解:C
質問 # 30
Your customer wants to collect bank account details from their suppliers. Which type of document would you recommend?
- A. External form
- B. Internal questionnaire
- C. External questionnaire
- D. Internal form
正解:C
質問 # 31
Your customer wants to implement governance checks on suppliers based on their internal control policies.
Which SAP Ariba solution do you recommend?
- A. SAP Ariba Supplier Lifecycle and Performance
- B. SAP Ariba Supplier Information and Performance Management
- C. SAP Ariba Supplier Risk
- D. SAP Ariba Supply Chain Collaboration
正解:C
質問 # 32
On which elements of the engagement is the Residual Risk field in the engagement summary based?
- A. Issues created during the engagement request process
- B. answer to the inherent risk screening questionnaire
- C. Grades submitted on risk assessment questionnaires
- D. Controls triggered during the engagement request process
正解:A
質問 # 33
Which attributes of Importance should be considered when creating a scoring structure within a survey? Note:
There are 2 correct answer to this question
- A. The value defines a question's relative importance within a section.
- B. The total of all Importance values must add up to 100.
- C. Acceptable values range between 0 and 10.
- D. Team graders can adjust the value while reviewing responses.
正解:A、C
質問 # 34
You need to use the SM Administration area to configure integration between SAP Ariba Supplier Lifecycle and Performance and an external system. Which system group do you require?
- A. Supplier Request Manager
- B. SM ERP Admin
- C. SM Ops Admin
- D. Preferred Supplier Manager
正解:B
質問 # 35
......
材料 From:
- 2024年最新の C_ARSUM_2308試験問題集で(PDFとテストエンジン)無料提供:https://www.passtest.jp/SAP/C_ARSUM_2308-shiken.html
- 2024年最新のC_ARSUM_2308のPDF試験問題集で無料提供:https://drive.google.com/open?id=1GHJT2JBabQ5qf_0n55nuBrRqUKt1MxEY
無料材料を提供しております!お客様の全試験合格を助けます!