[2024年06月] 無料C-IBP-2311試験問題集試験点数を伸ばそう [Q23-Q42]

Share

[2024年06月] 無料C-IBP-2311試験問題集試験点数を伸ばそう

2024年最新のC-IBP-2311実際問題集には試験のコツがあるPDF試験材料

質問 # 23
You need to make manual adjustments to your S&OP plan. Which are possible ways of making these changes? Note: There are 2 correct answers to this question

  • A. Using Driver-Based planning
  • B. Leveraging the functionality of SAP Work zone
  • C. Leveraging the web-based Planning capability
  • D. Using Microsoft Excel planning views

正解:C、D


質問 # 24
What option is available for the key figure that is enabled for fixing?

  • A. You can change a fixed key figure only with administrative rights
  • B. Fixing is possible for a part of key figure value on a certain planning level
  • C. Fixing is possible for key figures with negative values
  • D. Fixing is possible for certain period, Including all child values in the hierarchy

正解:D


質問 # 25
You are working with inventory key figures. What are some of the business scenarios where you can use the Last Period Aggregation function? Note: There are 2 correct answers to this question

  • A. Searching for and returning the last not-full value of the inventory key figure
  • B. Calculating how many periods inventory is going to last based on the planned demand
  • C. Calculating the value of inventory on any level from the time profile, ensuring flexibility of calculation
  • D. Calculating the value of inventory on on weekly basis, using static argentation from the daily 'evel

正解:C、D


質問 # 26
You are evaluating criteria for choosing the solver to support planning for a complex supply What are some of the points that should be reviewed? Note: There are 2 correct answers to this question.

  • A. Finite heuristics works with demand prioritization
  • B. Push and Pull production models are used by the optimizer
  • C. Planning results can be generated faster by the optimizer.
  • D. Prioritization of demand elements one by one is achieved by unconstrained heuristics

正解:A、B


質問 # 27
What is an example of a commonly used time-independent key figure?

  • A. A Special key figure marked as an aggregate key figure (aggregate constraint)
  • B. A currency conversion key figure, such as Exchange Rate
  • C. Any attribute as a key figure
  • D. A unit of measure key figure, such as UoM Conversion Factor

正解:C、D


質問 # 28
You are configuring disaggregation for the KF 1 key figure in the Planning Areas Model Configuration app. Which methods can you use? Note: There are 3 correct answers to this question

  • A. Disaggregation according to a helper key figure
  • B. Proportional disaggregation by using KF2 in the expression
  • C. Disaggregation according to an equal split
  • D. Disaggregation according to user-defined expression
  • E. Disaggregation in batch triggered by an application job

正解:B、C、D


質問 # 29
What are the possible Master Data Maintenance options for SAP Integrated Business Planning for Supply Chain? Note: There are 3 correct answers to this question

  • A. The Planner Workspaces app
  • B. The Planning Areas Model Configuration app
  • C. The SAP IBP, add - in for Micorsoft Excel
  • D. The Manage Master Data app
  • E. The data Integration job app

正解:C、D、E


質問 # 30
What are some of the features of the network charts in SAP Integrated Business Planning for Supply Chain? Note: There are 2 correct answers to this question

  • A. The network charts visualize relationships between warehouse, plants, customer, and supplier, for finished goods
  • B. You can create a network chart from the dedicated app, or use the Analytic Advanced app
  • C. You can create a network chart from the dedicated app, or use the Manage Analytic Stories app
  • D. To display the network chart, you need the Ship-From Location master data type in the planning area

正解:A、B


質問 # 31
You created a key figure and want to add calculations. Which of the following rules do you consider?
Note: There are 2 correct answers to this question

  • A. Key figure can be calculated across the different planning levels
  • B. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation u level.
  • C. All key figure calculation have calcuation inputs, which can be marked as stored or calucated
  • D. The calculation chain for a key figure must always result in a calculated key figure

正解:A、C


質問 # 32
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)? Note: There are 3 correct answers to this question

  • A. Transportation lead time
  • B. Aggregated constraints
  • C. Maximum lot size
  • D. Minimum lot size
  • E. Adjusted transportation receipts

正解:A、D、E


質問 # 33
How do you achieve rolling aggregation with SAP IBP?

  • A. Using an attribute as a key figure
  • B. Using a local member
  • C. Using an appropriate period weight factor
  • D. Using a key figure calculation

正解:D


質問 # 34
You are reviewing the master data types that are often used for supply and inventory planning. Which master data types are compound master data types? Note: There are 2 correct answers to this question

  • A. SOURCECUSTGROUP
  • B. SOURCEPRODUCTION
  • C. SOURCECUSTOMER
  • D. SOURCELOCATION

正解:C、D


質問 # 35
How many different time levels can be selected within one planning view?

  • A. The number of time levels is restricted to four to avoid negative effects on performance
  • B. All time levels available in the time profile
  • C. Only time levels from the base planning level of selected key figures
  • D. All time levels available in the time profile, restricted by global configuration parameter

正解:D


質問 # 36
You are developing the functionality and appearance of the Excel UI for SAP IBP business users. Which extensibility capabilities for SAP IBP, add-in for Microsoft Excel are provided by Custom VBA coding? Note:There are 2 correct answers to this question.

  • A. Changing the layout of the master data workbooks
  • B. SAP IBP ribbon extension
  • C. Changing the member names
  • D. Chaging the entries from the Name Manager

正解:A、B


質問 # 37
You need to use your resource cost effectively with a certain minimum use, even if it means producing more than demand. Which solutions would apply to this scenario? Note: There are 2 correct answers to this question.

  • A. Balance can be achieved between excessive prebuild and minimum use by incorporating violation costs
  • B. Minimum capacity utilization will result in pull production
  • C. Capacity leveling will be possible for production and storage resources.
  • D. Excess stock can be generated and will need to be staged in an overflow warehouse

正解:A、D


質問 # 38
What is taken as an input for the demand sensing process? Note: There are 2 correct answers to this question.

  • A. Open Sales Order
  • B. Consensus Demand
  • C. Results of time series analysis
  • D. Forecast Accuracy measures

正解:A、B


質問 # 39
What are some of the key capabilities of SAP Integrated Business Planning for demand? Note: There are 3 correct answers to this question.

  • A. Automated, exception- based processing
  • B. Determination of coefficient of variation (CV)
  • C. Classifying demand into zones
  • D. Embedded, on-the-fly demand analytics
  • E. Statistical analysis using the predictive analytics tools

正解:A、B、D


質問 # 40
What are some of the capabilities of the Planner Workspaces app? Note: There are 2 correct answers to this question.

  • A. It supports sharing with other users or user groups.
  • B. It supports embedding analytic stories as a workspace component
  • C. It supports favourites created in SAP IBP, add-in for Microsoft Excel
  • D. It supports simulating the effect of the changes

正解:B、C


質問 # 41
You need to create time periods for the time profile in a planning are
a. What should you be aware of when running the Create Time Periods application job?

  • A. This application job can also be triggered from SAP IBP, add-in for Microsoft Excel
  • B. A time profile has to be activated so that application job can proceed
  • C. It is mandatory to specify the planning area in the Parameter Section of the application job
  • D. The planning area to which the time profile is assigned must be active

正解:B


質問 # 42
......

心強いC-IBP-2311のPDF問題集はC-IBP-2311問題:https://www.passtest.jp/SAP/C-IBP-2311-shiken.html

正真正銘のC-IBP-2311問題集で無料PDF問題で合格させる:https://drive.google.com/open?id=1fHScl0jM3wm_ApXjAfNlH3bTdxGItvIF