
C_TS414_2021問題集合格保証付きの合格できるC_TS414_2021試験2023年更新
C_TS414_2021試験問題集を試そう!ベストC_TS414_2021試験問題トレーニングを提供していますPassTest
SAP C-TS414-2021 資格試験は、組織における品質管理プロセスに関わっているプロフェッショナル向けのものです。SAPコンサルタント、プロジェクトチームメンバー、品質アナリスト、品質マネージャーの方々に適しており、彼らがSAP S/4HANAにおいて品質プロセスを実装・管理する責任がある方々にとって理想的です。また、認定されたSAPプロフェッショナルとして認知されることで、品質管理分野でキャリアアップを図りたい個人にとっても有益です。
質問 # 25
Which of the following documents can you use as a reference document. When creating a vender notification? Correct 3
- A. Quotation
- B. Framework order
- C. Outline agreement
- D. Purchase order
- E. Material order
正解:A、B、C
質問 # 26
Your customer wants to periodically calibrate the quality management test equipment used in an inspection plan .
Which type of test equipment must used ?
- A. Materials
- B. Equipment
- C. Documents
- D. Production resource/ tools PRTs
正解:B
質問 # 27
Which of the following does the system automatically do when you complete a stability? Correct 3
- A. Set the system status to completed
- B. Trigger a subsequent stability Study
- C. Lock the test schedule
- D. Lock all the storage conditions
- E. Set the usage decision for all stability inspection lots
正解:A、C、D
質問 # 28
For what type of cost collector does an inspection lot capture appraisal and non conformity costing?
- A. A company code general ledger
- B. A quality Notification
- C. A controlling general ledger
- D. A quality management order
正解:D
質問 # 29
What type of task lists can the calibration planner assign to a maintenance plan to perform a calibration inspection? Note : 2 correct answer
- A. Inspection plan
- B. Standard routing
- C. General task list
- D. Equipment task list
- E. Functional location task list
正解:C、D
質問 # 30
During which of the following steps in a business process does a dynamic modification rule change severely
- A. Creation of a batch
- B. The creation of a inspection Lot
- C. The creation of a notification
- D. The creation of a certification
正解:B
質問 # 31
Which following inspection origin are directly related to sale and distribution (SD) functions 3 correct answers
- A. Plant maintenance
- B. Goods issue
- C. Good receipts
- D. Delivery to customer with customer order
- E. General delivery
正解:C、D、E
質問 # 32
What is the difference audit between audit question and corrective preventive action? Correct 2
- A. Corrective actions have no search field
- B. Audit questions have no status
- C. Corrective actions have partners
- D. Audit question have no long texts
正解:B、C
質問 # 33
In the material master, at which organizational level do you create Quality management (QM) data for inspection type.
- A. Company code level
- B. Plant level
- C. Client level
- D. Business area level
正解:B
質問 # 34
When you post a good receipt, where does the system check the current inspection stage for a material/vendor combination for upcoming inspection .
- A. Characteristic
- B. Sampling scheme
- C. Quality level
- D. Inspection Plan
正解:C
質問 # 35
Your business requirements demand production triggers.
Which of the following events in production can create an inspection lot(3 Correct Ans)
- A. Order Creation
- B. Goods Movement
- C. ATP check
- D. Order Release
- E. Dead line monitoring /batch monitoring
正解:B、D、E
質問 # 36
Your customer wants to automatically valuate the overall results of an audit using the standard Which valuation method book scores for the overall result?(2 Correct ans )
- A. Valuation mode
- B. Qualitative valuation
- C. Non relevant indicator
- D. Quantitative valuation
正解:B、D
質問 # 37
The adapt field selection function allows you to define a customer specific field selection for quality management screens. Where in the system can you make the adjustments?
- A. In user specific presettings
- B. In the default settings for QM transactions
- C. In the IMG settings
- D. In the table control settings
正解:D
質問 # 38
You want to print a certificate for an outbound delivery, at which level is a certificate printed?
- A. Delivery header level
- B. material level
- C. Delivery Item level
- D. Shipping point level
正解:C
質問 # 39
By integrating the QM component in the production process, you can monitor and document process capability and the quality of products.
Which statistical and graphical tools does SAP provide to monitor a process ?
- A. Quality management information system
- B. Statistical report charts
- C. Quality management inspection data interface QM-ID
- D. Statistical process controls (SPC)
正解:D
質問 # 40
Your customer plan to use Test Equipment Management as part of QM.
What event triggers the creation of an inspection lot for calibration inspection?
- A. Assignment of Equipment to a maintenance plan
- B. Scheduling a maintenance plan
- C. Creation of maintenance order
- D. Release of a maintenance order
正解:D
質問 # 41
Your costumer wants to determine a critical defect class
Which of the following function are possible during results recoding?
Correct 2 ans
- A. Active a quality notification
- B. Trigger a subsequent inspection lot
- C. Trigger a workflow
- D. Tighten the quality level
正解:A、C
質問 # 42
......
最新100%合格率保証付きの素晴らしいC_TS414_2021試験問題PDF:https://www.passtest.jp/SAP/C_TS414_2021-shiken.html
実践サンプルと問題集指導には2023年最新のC_TS414_2021有効なテスト問題集:https://drive.google.com/open?id=1to_I5lYP-rxnxhZIqkm3JDtJ_ewY0Uws