[Q28-Q50] 検証済みの1Z0-1075-21問題集と解答で合格保証もしくは全額返金 [2022年03月]

Share

検証済みの1Z0-1075-21問題集と解答で合格保証もしくは全額返金 [2022年03月]

1Z0-1075-21のPDF問題集で2022年03月31日最近更新された問題

質問 28
You are monitoring the production status on your shop floor. The production operator informs you that a particular resource that was not functioning for the past week is now back in operation.
Which option shows the steps to quickly release the work orders affected by this operation, which were put on hold using the mobile application?

  • A. Select the infotile Unreleased> Select a work order you want to release>Swipe left on the work order name> Tap or click the Release action, and click OK
  • B. Select the infotile On Hold> Select a work order you want to release> Swipe left on the work ordername> Tap or click the Release action, and click OK
  • C. Select the infotile On Hold> Select awork order you want to release> Select the work order operation on hold > Swipe left on the work order name> Tap or click the Release action, and click OK
  • D. Select the infertile Dispatch List> Select awork order operation you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK

正解: D

 

質問 29
A Manufacturing Engineer in a plant is creating an alternative manufacturing process for an item using its existing Work Definitions. After copying from the existing Work DefinitionWD1 to the alternative Work Definition WD2, the engineer finds that the operation items were not copied in the alternative manufacturing process WD2.
Identify the reason.

  • A. The StartData was not populated in the new Work Definition WD2 during creation.
  • B. The Production Priority was not populated in the new Work Definition WD2 duringcreation.
  • C. The Item and Structure Name were changed in the new Work Definition WD2 during creation.
  • D. The Item and Structure Name in the existing Work Definition WD1 were retained in the new Work Definition WD2 as well during creation.

正解: A

 

質問 30
A Production Supervisor queries a Work Order (WO-1025) from the manage Work Orders page. On the Entering Edit Work Order: WO-1025 page, he finds General Information, Operations and History tab, but not the Reservations tab.
Identify the two reasons that can cause the Reservations tab not to be displayed.

  • A. Work Order (WO-1025) is not a Drop-ShipWork Order.
  • B. Work Order (WO-1025) is not a Back-to-Back Work Order.
  • C. Work Order (WO-1025) is not a Plan-to-produce Work Order.
  • D. Work Order (WO-1025) is not a Pick-to-order Work Order.
  • E. Work Order (WO-1025) is not a Configured item Work Order.

正解: A,E

 

質問 31
Identify two reports that provide work ordercost-related information to the costing user.

  • A. Purchase Variance Summary
  • B. Cost Accounting Dashboard
  • C. Work order Operational Analysis
  • D. WIP Balance by Plant

正解: B,C

 

質問 32
The production user wants to report Work Order completion.
Identify two ways of reporting the progress of work order at work order operation level.

  • A. Change status of Operation to completed
  • B. Change Move status to Ready.
  • C. Complete with Details
  • D. Complete using quantity completion
  • E. Quick Complete

正解: C,E

 

質問 33
A Work Center created a month ago is no longer in use now. You want to removethe Work Center; however, the system is no allowing you to delete it.
Identify three reasons for this.

  • A. The work center is being references in the work definition operation.
  • B. The Work Center is being referenced in the Open Work Order.
  • C. The work center is being referenced in the Work Area.
  • D. The Work Center is being referenced in the Closed Work Order.
  • E. There are resources associated with the Work Center.

正解: B,C,E

 

質問 34
A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day.
Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar page.

  • A. Click Inside the existing Shift time on a Specific Date>Create Work Center page>Click the Resource Availability tab>Click Add icon> Select R1 from Resource Drop-down list> Enter4 in Default Units Available.
  • B. Click Outside the existing Shift time on a Specific Date> Create Work Center page> Click the Resource Availability tab> Click Add icon> Select R1 from Resource Drop-down list> Enter 4 in Default Units Availability column.
  • C. Click Inside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability region> Populate 4 units inDefault Availability column.
  • D. Click Outsidethe existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability and Overrides Region> Populate 4 units in Availability Override column.

正解: D

 

質問 35
As a production supervisor, you require immediate access to critical shop floor execution systems to take actionwhile on the go.
Which four work order related actions can be taken in the Manufacturing Supervisor mobile application?

  • A. Reviewing customer information of work orders
  • B. Executing standard work order and updating item and resource usage
  • C. Creating a new standard or non standard work order
  • D. Searching for work orders and sending them through e-mail
  • E. Releasing work orders using quick swipe details
  • F. Reviewing operation, component, and resource detail

正解: A,D,E,F

 

質問 36
In a manufacturingcloud implementation, production operators want to perform work order updates using Dispatch List.
Identify two tasks that the Dispatch List allows the production users to perform.

  • A. Report Component Returns
  • B. Report Resource Transactions
  • C. Report Material Transactions by Quantity and Serial Number
  • D. Report Receipts
  • E. Report Cost Transactions

正解: B,C

 

質問 37
In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates of the assembly have been defined as required.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario.
Identify the reason.

  • A. Costs for purchase components P1and P2 are not defined in cost accounting.
  • B. Create Accounting Distributions was not initiated.
  • C. Create Accounting was not initiated.
  • D. Purchase components P1 and P2 are not associated with Material cost plan of the cost planning scenario.

正解: B

 

質問 38
A production Supervisor has noticed that Work Orders created manually are overwritten by the plan runs executed by Planning Central. After discussing this issue with the Planner, two actions are recommended to prevent the Work Orders from being overwritten by plan runs.
Identify the two recommendations.

  • A. Update Supply Plan Options, Overwrite Firm Planned Orders = None.
  • B. Update Firm flag in the Details region of the Edit Work Definition page.
  • C. Update Firm flag in the Details region of the Edit Work Order page.
  • D. Update Firm flag in the Details region of the Edit Work Definition Names page.

正解: A,C

 

質問 39
Which entity should you use to configure the manufacturing plant in Functional Manager?

  • A. Business Unit
  • B. Organization
  • C. Plant
  • D. Legal Entity

正解: C

 

質問 40
You have been asked to set up cost estimates for 10 different purchased items. Which two steps could be used to accomplish this task?

  • A. Use the Mass Edit functionality.
  • B. Import spreadsheet.
  • C. Enter cost estimates directly into UI.
  • D. Call web service.
  • E. Run the ESS process "Update Item Cost Estimate".

正解: B,C

 

質問 41
You are in the process of defining a Standard Operation for visual inspection. You want the completion of this standard operation to be reported in all work orders that reference it.
Identify the setup that will fulfill this requirement.

  • A. Select the Count Point check box while defining the Standard Operation.
  • B. Select the Automatically Transact check box while defining the Standard Operation.
  • C. Ensure that the Charge Type of the resource is Automatic.
  • D. Deselect the Count Point check box while defining the Standard Operation.

正解: A

 

質問 42
In a Manufacturing Cloud post productionsupport environment, a user wants to update some of the operations in the work orders by using the Midpoint Scheduling feature. However, the user is unable to update any of the orders.
Identify two reasons.

  • A. The scheduled resources are not part of the organization selected by the user.
  • B. The work order operations do not have operations start or completion date.
  • C. None of the operations include scheduled resources.
  • D. The operations are missing sequence.

正解: C,D

 

質問 43
In a manufacturing plant, a production operator in a givenshift completes a car assembly and reports this using orderless completion by referencing a Work Definition.
Identify the two purposes of the referenced Work Definition in Orderless reporting.

  • A. Scrap material
  • B. Return material
  • C. Processing steps
  • D. Resource usage
  • E. Material usage

正解: D,E

 

質問 44
You want to use a predefined Standard Operation in a Work Definition, but you also want to change the usage of the Standard Operation resource. Identify the setup required.

  • A. Use a Resource exception for the resource and alter its usage.
  • B. Use the Transfer and Edit Standard Operation functionality to edit the resource usage.
  • C. Select the Referenced check box while adding the standard operation to the work definition and change the usage manually.
  • D. Deselect the Referenced check box while adding the standard operation to the work definition and change the usage manually.

正解: C

 

質問 45
Your customer is a light assembly manufacturing company that doesn't require shop floor control. A manufacturing engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.
Which three steps must be completed and verified in the Work Definition area?

  • A. Ensure there is only one default standard operation at a given point in time.
  • B. Ensure the predefined work definition name ORA_MAIN name is active.
  • C. Select a standard operation that is to be used in automatic work definition by enabling the attribute Default for automatic work definition.
  • D. Select a resource that is to be used inautomatic work definition by enabling the attribute Default for automatic work definition.
  • E. Ensure the item isa standard item with a secondary item structure.

正解: B,C,E

 

質問 46
To reduce the subassembly stock with no impact on material planning of child components of the subassemblies stock, you need to modify the multilevel item structure of a product.
Identify the action that meets this requirement.

  • A. Change the Supply Type = Push in Itemdefinition and Work Definition, for subassemblies having high inventory stock.
  • B. Change the Supply Type = Assembly Pull in Item definition and Work Definition, for subassemblies having high inventory stock.
  • C. Change the Supply Type = Operation Pull in Item definition and Work Definition, for subassemblies having high inventory stock.
  • D. Change the Supply Type = Phantom in Item definition and Work Definition, for subassemblies having high inventory stock.

正解: B

 

質問 47
The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, hasscheduled the Process Item Structure Changes to Work Definitions program. However, after the execution of the program the engineer did not receive a notification with the details of the Item Structure changes.
Which two reasons could cause this?

  • A. The engineer does not have the Manage Work Definitions function privilege.
  • B. The engineer does not have Data access to Items.
  • C. The engineer does not have Data access to Items Attributes.
  • D. The engineer does not have Dataaccess to Item Structures.
  • E. The engineer does not have Data access to Manufacturing plant in which the Item Structure change was performed.

正解: A,E

 

質問 48
A production operator needs to review the materials issued, resources charged, and operations performed for a job that was executed inthe previous shift.
Identify the task the operator has to select to review all the transactions in a single place for both Work Order and Orderless execution.

  • A. Report Resource, Material and OperationTransactions
  • B. Manage Work Orders
  • C. Review Dispatch List
  • D. Review Production Transaction History

正解: B

 

質問 49
Identify three requirements fulfilled by nonstandard work orders.

  • A. Rework
  • B. Prototype
  • C. Rescheduling
  • D. Repair

正解: A,B,D

 

質問 50
......

1Z0-1075-21試験問題有効な1Z0-1075-21問題集PDF:https://www.passtest.jp/Oracle/1Z0-1075-21-shiken.html