質問 # 37
What can you manage via the account assignment category? Note: There are 2 correct answers to this question.
- A. Costing variant
- B. Valuation of separate sales order stock
- C. Product cost by sales order
- D. Separate sales order stock
正解:B、D
質問 # 38
How does SAP S/4HANA determine if a characteristic value is valid in Profitability Analysis?
- A. By defining the characteristic value in the check table
- B. By defining the characteristic value as a value field
- C. By defining the characteristic value as a key figure
- D. By defining the characteristic value in the field catalog
正解:A
質問 # 39
Which statements are relevant to the cost of sales accounting method in profitability management? Note:
There are 2 correct answers to this question.
- A. It presents revenues, primary expenses, changes in stock, WIP, and capitalized activities.
- B. It aims to match revenues for goods and services against sales-related expenses.
- C. It aims to summarize activity and situational change for a given organizational unit over a period of time.
- D. It presents the costs and revenues information in a format that is ideal for conducting margin analyses.
正解:B、D
質問 # 40
You want to derive the profitability segment for a line item in the universal journal using SAP S/4HANA standard configuration. What requirements must be fulfilled? Note: There are 2 correct answers to this question.
- A. The type of the general ledger account must be primary cost/revenue or secondary cost.
- B. The type of the addressed ledger must be an extension ledger.
- C. Costing-based Profitability Analysis must be active.
- D. Account-based Profitability Analysis must be active.
正解:A、D
質問 # 41
Which of the following values can be calculated using result analysis? Note: There are 3 correct answers to this question.
- A. Gross margin
- B. Reserves for unrealized costs
- C. Cost of goods manufactured
- D. Work in progress
- E. Cost of sales
正解:B、D、E
質問 # 42
What can you do with statistical internal orders?
- A. Transfer posting to another internal order.
- B. Settle costs to a cost center.
- C. Apply overhead rates to the internal order.
- D. Simultaneously post to a cost center.
正解:D
質問 # 43
You are setting up costing-based Profitability Analysis for your organization. How do you configure the deferent market segments?
- A. As divisions
- B. As characteristics
- C. As key Figures
- D. As value fields
正解:B
質問 # 44
To which object do you assign a costing sheet?
- A. Valuation variant
- B. Costing variant
- C. Cost component structure
- D. Transfer control
正解:A
質問 # 45
In a standard system delivery, how many free characteristics can be added to an operating concern?
- A. Over 150
- B. 0-70
- C. 71-100
- D. 101-150
正解:B
質問 # 46
What do you need to setup in order to bring the values incoming sales orders into account-based Profitability Analysis?
- A. An extension ledger of type "Prediction and Commitment"
- B. A multi-valuation ledger
- C. An extension ledger of type "Simulation"
- D. A new standard G/L ledger with exclusive usage of "Prediction"
正解:A
質問 # 47
What are some of the characteristics of planning for internal orders? Note: There are 2 correct answers to this question.
- A. You can plan multiple versions.
- B. You can define tolerance limits for plan overspend.
- C. Availability control can check against plan values.
- D. You can enter costs and revenues.
正解:A、D
質問 # 48
Which parameters are controlled by the costing type in a costing variant? Note: There are 2 correct answers to this question.
- A. Costing sheet
- B. Price for materials
- C. Price updates
- D. Save with date key
正解:C、D
質問 # 49
To which object can you settle an internal order using cost elements with cost element category 21 (internal settlement)? Note: There are 3 correct answers to this question.
- A. WBS element
- B. General ledger account
- C. Network
- D. Sales order item
- E. Asset
正解:A、C、D
質問 # 50
What does SAP/S4HANA select line-item-based data for costing based Profitability Analysis reports?
- A. It select actual data from table ACDOCA and plan data from COSP.
- B. It select actual data from table CE1XXXX and plan data from CE2XXXX.
- C. It select actual data from table CE2XXXX and plan data from CE3XXXX.
- D. It select actual data from table ACDOCA and plan data from ACDOCP.
正解:B
質問 # 51
What are the some of the characteristics of Profit Center Accounting in SAP S4/HANA? Note: There are 2 correct answers to this question.
- A. It can be used with period and/or cost of sale accounting.
- B. It is integrated in the universal journal.
- C. It can be used in the settlement rule for internal order.
- D. It is possible to derive the profit center from the segment in configuration.
正解:A、B
質問 # 52
What master data objects can you set up using time-based fields? Note: There are 2 correct answers to this question.
- A. Cost element
- B. Cost centers
- C. Activity type
- D. Statistical key figures
正解:B、C
質問 # 53
Which of the following statements best describe Product Cost by Period? Note: There are 2 correct answers to this question.
- A. It is used when the focus of controlling is on a stable and continuous production process.
- B. It is used in conjunction with a product cost collector.
- C. It is used to analyze work in process (WIP) based on actual costs.
- D. It is used when periodic costs outweigh daily postings.
正解:A、B
質問 # 54
......
最新でリアルなC_TS4CO_2021試験問題集解答:https://drive.google.com/open?id=1TnZwKNeDGeQFkDueHKZ9w4Z_iKnt7EVP