合格できるSAP SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade試験最速合格保証最近更新されたPassTest問題集! [Q32-Q57]

Share

合格できるSAP SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade試験最速合格保証最近更新されたPassTest問題集!

合格できるE-S4HCON2023試験の81問題で最適なPassTest出題問題

質問 # 32
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

  • A. Run the database migration to the SAP HANA database
  • B. Apply the recommendations of the simplification list
  • C. Perform the migration of data into the new data structure
  • D. Check the compatibility of custom code with SAP S/4HANA

正解:B、D


質問 # 33
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:

  • A. Upgrading to SAP ECC 6.08 without using DMO
  • B. Using DMO when applying Support Packages to SAP ECC 6.07
  • C. Updating to SAP ECC 6.07 using DMO
  • D. SAP S/4HANA conversion to SAP S/4HANA 1709

正解:A、D


質問 # 34
What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. Standalone AS ABAP with SAP_BASIS 752 and above
  • B. SAP S/4HANA Server 1809 and above
  • C. SAP Solution Manager 7.2
  • D. SAP ECC system from SAP ERP 6.0 EHP 8

正解:A、B


質問 # 35
During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?
Please choose the correct answer.
Response:

  • A. It performs a comparison of all tables using check sum.
  • B. It performs a comparison on selected tables using check sum.
  • C. It does NOT perform any table comparison.
  • D. It performs a comparison on all tables using row counts.

正解:D


質問 # 36
SUM was registered at the SAP Host Agent. Based on which information does the SAP Host Agent determine the path to the SUM directory.

  • A. The path was stored in file host_profile during registration
  • B. The path is taken from the URL entered in the browser to start SUM
  • C. The path was stored in file sumabap conf during registration
  • D. The path was stored to the environment of user <sid>adm during registration

正解:C


質問 # 37
You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.

  • A. Software update
  • B. Migration
  • C. Conversion
  • D. Main import

正解:B、C


質問 # 38
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:

  • A. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
  • B. SUM is still running in uptime; the number of 40 defined R31oad processes is considered.
  • C. The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.
  • D. There is a maximum of 40 parallel R31oad processes within this specific downtime phase.

正解:A


質問 # 39
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? There are 2 correct answers to this question.

  • A. You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
  • B. You need to build up a SI check framework by applying SAP notes.
  • C. The SI checks are executed in the development system and the results are transported into the subsequent systems.
  • D. Depending on the SAP S/4HANA version, there are different SI check frameworks.

正解:B、D


質問 # 40
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC 6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:

  • A. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
  • B. Combine the upgrade and the Unicode conversion using the Twin Upgrade &Unicode Conversion (TU &UC) procedure.
  • C. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
  • D. Combine the upgrade and the Unicode conversion using the Combined Upgrade &Unicode Conversion (CU &UC) procedure.

正解:C


質問 # 41
During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?
There are 3 correct answers to this question.
Response:

  • A. Execution of SPAU modification adjustment
  • B. Execution of SPDD modification adjustment
  • C. Execution of eCATTs for business validation tests
  • D. Execution of XPRAs and AIMs
  • E. Creation of the table structures in the new SAP HANA database

正解:A、C、D


質問 # 42
You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".
Where can you change this during the migration via the Utilities option of the SUM UI?
There are 2 correct answers to this question
Response:

  • A. In SUM Phaselist
  • B. In DMO Migration Preparation
  • C. In SUM Parameters
  • D. In Process Control Center

正解:C、D


質問 # 43
In which part of an upgrade does SUM allow you to generate ABAP loads (SGEN)?
There are 2 correct answers to this question.

  • A. During downtime
  • B. During SPDD
  • C. During uptime
  • D. Post-downtime

正解:C、D


質問 # 44
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:

  • A. Phase RUN_RSDBSCPY
  • B. Phases DIFF*
  • C. Phase DOWNCONF_DTTRANS
  • D. Phases EU_IMPORT*
  • E. Phase RUN_RSPTBFIL _ISUTABU

正解:B、C、D


質問 # 45
You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question

  • A. PARMVNT_UPG
  • B. PARDIST_SHD
  • C. TABIM_SHADOW_*
  • D. TABIMJJPG

正解:D


質問 # 46
You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?

  • A. The start of the business downtime
  • B. The end of the business downtime
  • C. The start of the Execution roadmap step
  • D. The end of the database migration

正解:B


質問 # 47
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:

  • A. Early in the downtime
  • B. Before the downtime starts
  • C. As part of the cleanup process
  • D. At the end of the downtime

正解:B


質問 # 48
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center, you can see 40 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?

  • A. These are 40 pairs of Reload processes, so there are 80 R3load processes running.
  • B. Without table contents comparison, only 40 R3load processes are being started.
  • C. SUM is still running in uptime; the 40 defined Reload processes are considered.
  • D. There are 40 Reload processes used for copying and 40 Reload processes for table count verification.

正解:B


質問 # 49
Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.

  • A. Dual Stack split
  • B. Homogenous system copy
  • C. Release upgrade
  • D. Support Package Stack update
  • E. Database migration

正解:C、D、E


質問 # 50
What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

正解:C


質問 # 51
You are using the maintenance planner to calculate the required software components for your SAP S4HANA conversion. What do you need to know regarding SUM?

  • A. As soon as the next SP level of SUM is available, the current version of SUM passes into "patch on request mode" immediately.
  • B. AA

正解:A


質問 # 52
In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question.

  • A. When upgrading an SAP S/4HANA Server system
  • B. When upgrading an SAP ECC system with DMO
  • C. When performing an SAP S/4HANA conversion with DMO
  • D. When performing an SAP S/4HANA conversion without u DMO

正解:A、B


質問 # 53
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.

  • A. Kernel for source release, Windows, SAP MaxDB
  • B. Kernel for target release, Windows, SAP MaxDB
  • C. Kernel for target release, Linux, SAP HANA
  • D. Kernel for target release, Windows, SAP HANA

正解:A、D


質問 # 54
Which steps can SUM perform during an SAP S/4HANA conversion? Note; There are 2 correct answers to this question.

  • A. Software update
  • B. Database migration
  • C. Custom code analysis
  • D. Unicode conversion

正解:A、B


質問 # 55
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?
There are 2 correct answers to this question.
Response:

  • A. Assign the transport request as a modification adjustment transport
  • B. Create "modified* versions of the objects that you need to adjust
  • C. Manually activate the adjusted dictionary objects
  • D. Release the transport request containing the modification adjustment

正解:A、B


質問 # 56
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. An additional temporary database is used during uptime
  • B. Dedicated application tables are migrated in uptime
  • C. TABIMJJPG is executed in uptime
  • D. The repository is migrated in uptime

正解:B


質問 # 57
......

合格突破受験者シミュレーションされたE-S4HCON2023試験問題集:https://www.passtest.jp/SAP/E-S4HCON2023-shiken.html

無料テストエンジンはSAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade認定試験:https://drive.google.com/open?id=1LfSTqtGoOljB_RBpqeH_jj86aKaLCFkG