問題集を購入するなら最新の2023年12月17日 E-S4HCON2023試験問題と解答PDFで一年間無料更新 [Q44-Q63]

Share

問題集を購入するなら最新の2023年12月17日 E-S4HCON2023試験問題と解答PDFで一年間無料更新

時間限定無料ダウンロード!最新のE-S4HCON2023問題集で2023年最新のE-S4HCON2023試験問題

質問 # 44
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:

  • A. Shadow repository creation (EU_IMPORT*)
  • B. Downtime migration (EU_CLONE_MIG_DT_RUN)
  • C. ParaUel distribution (PARDIST_SHD)
  • D. Uptime migration (EU_CLONE_MIG_UT_RUN)

正解:D


質問 # 45
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system, before SUM continues?
There are 2 correct answers to this question.
Response:

  • A. Create "modified* versions of the objects that you need to adjust
  • B. Assign the transport request as a modification adjustment transport
  • C. Release the transport request containing the modification adjustment
  • D. Manually activate the adjusted dictionary objects

正解:A、B


質問 # 46
You are executing a standard SUM procedure to update an SAP system using main configuration mode
"Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:

  • A. Before the downtime starts
  • B. At the end of the downtime
  • C. As part of the cleanup process
  • D. Early in the downtime

正解:A


質問 # 47
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:

  • A. Using the main configuration option "Standard" when applying SAP Support Packages
  • B. Using the main configuration option "Single System" when installing an Add-On
  • C. Using the main configuration option "Single System" in case of an upgrade.
  • D. Using the database migration option (DMO) for SUM

正解:B


質問 # 48
What is the different between the benchmaking and the repetition option of the Database Migration Option (DMO) of SUM?

  • A. The benchmaking option allows you to migration a specified set of tables
  • B. The benchmaking option allows you to repeat the uptime migration
  • C. The repetition option allows you to repeat the complete migration
  • D. The repetition option allows you to run the migration without a shadow system

正解:A


質問 # 49
You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?
Please choose the correct answer.

  • A. Credentials of user DDIC in the development client of the development system
  • B. Credentials of a named user in the development client of the development system
  • C. Credentials of a named user in client 000 of the shadow system
  • D. Credentials of user DDIC in client 000 of the shadow system

正解:B


質問 # 50
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:

  • A. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
  • B. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
  • C. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
  • D. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps

正解:C


質問 # 51
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?

  • A. An overview about possible upgrade paths
  • B. The corrections to the SUM Guide
  • C. AA
  • D. The link to different patch levels to SUM

正解:A、B、D


質問 # 52
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, independent of your SUM configuration?
There are 3 correct answers to this question.
Response:

  • A. Import of upgrade and language data from the download directory in phase TABIM UPG
  • B. Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
  • C. Import of dictionary objects from the download directory in phase DDIC_UPG
  • D. Generation of the new ABAP loads in phase RUN_SGEN_GENER8
  • E. Activation of dictionary objects in phase ACT_UPG

正解:A、C、E


質問 # 53
What do you need to know about the SAP ERP Upgrade and Update Guide?
There are 2 correct answers to this question.
Response:

  • A. It is a database-specific document
  • B. It contains a section "free space requirements"
  • C. It is target release specific
  • D. It contains a troubleshooting section

正解:B、C


質問 # 54
You want to use the downtime-optimized data conversion for your SAP S/4HANA conversion. What is the main difference from a standard SAP S/4HANA conversion?
Please choose the correct answer.
Response:

  • A. The repository is migrated in uptime
  • B. Dedicated application tables are migrated in uptime
  • C. An additional temporary database is used during uptime
  • D. TABIMJJPG is executed in uptime

正解:B


質問 # 55
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?

  • A. To optimize the activation
  • B. To optimize the main import
  • C. To optimize the conversion
  • D. To optimize the migration

正解:D


質問 # 56
You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

  • A. Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration
  • B. SAP S/4HANA conversion including database migration and Unicode conversion
  • C. Unicode conversion SAP S/4HANA conversion including database migration
  • D. Unicode conversion Database migration SAP S/4HANA conversion without database migration
  • E. Unicode conversion SAP S/4HANA conversion without database migration Database migration

正解:A、C、D


質問 # 57
You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

  • A. The source system is non-Unicode and the target database is a scale-out system.
  • B. Network capacity between exporting and importing R3load processes must be.
  • C. SAP HANA Landscape Reorganization required a manual step to edit a file.
  • D. The target database size increases temporarily because of the Shadow Repository.
  • E. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.

正解:C、E


質問 # 58
You are preparing for a standard SAP S/4HANA conversion from SAP ECC on Windows with SAP MaxDB to SAP S/4HAN. You are performing the corresponding maintenance transaction with the Maintenance Planner. Which kernels do you need to select for the SAP S/4HANA conversion?
There are 2 correct answers to this question.

  • A. Kernel for target release, Linux, SAP HANA
  • B. Kernel for target release, Windows, SAP MaxDB
  • C. Kernel for source release, Windows, SAP MaxDB
  • D. Kernel for target release, Windows, SAP HANA

正解:C、D


質問 # 59
You want to use the Custom Code Migration Worklist via Remote Code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database? Please choose the correct answer.

  • A. Configure it within transaction ATC
  • B. Apply the corresponding SAP note via SAP Note Assistant
  • C. Download it from SAP Support Portal
  • D. Generate it by analyzing the specific custom code via RFC

正解:C


質問 # 60
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step
"Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:

  • A. The SAP Support Packages contained in the upgrade media
  • B. The SAP Support Packages that will be bound to the upgrade
  • C. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
  • D. The SAP Support Packages found in the download directory

正解:D


質問 # 61
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:

  • A. Check the compatibility of custom code with SAP S/4HANA
  • B. Run the database migration to the SAP HANA database
  • C. Perform the migration of data into the new data structure
  • D. Apply the recommendations of the simplification list

正解:A、D


質問 # 62
You performed a custom code check for an SAP S/4HANA conversion. In which transactions can you review the results?
There are 2 correct answers to this question.
Response:

  • A. SE80 (Object Navigator)
  • B. ATC (ABAP Test Cockpit)
  • C. SAT (Runtime Analysis)
  • D. SYCM (Simplification Database Content)

正解:A、B


質問 # 63
......

検証済みのE-S4HCON2023問題集と解答で一年間無料最速更新:https://www.passtest.jp/SAP/E-S4HCON2023-shiken.html

最新のSAP E-S4HCON2023認定の練習テスト問題:https://drive.google.com/open?id=1d-jI1Bd6gueXMn02AC0-t75rZD8r5m3R