質問 # 18
Each column must be poured in one day. Each column requires 2,000 cubic feet of concrete. The lift bucket has a capacity of 40 cubic feet. How many lifts will be required per column pour?
- A. 80 lifts
- B. 5 lifts
- C. 50 lifts
- D. 20 lifts
正解:A
解説:
Volume of Concrete per Column:
* Each column requires 2,000 cubic feet of concrete.
Lift Bucket Capacity:
* Each lift bucket holds 40 cubic feet.
Calculate Number of Lifts per Column:
* Number of Lifts = Volume of Concrete ÷ Bucket Capacity = 2,000 ÷ 40 = 80 lifts.
Cross-Verification:
* Option B (50 lifts): Incorrect. Miscalculates required lifts.
* Option C (5 lifts): Incorrect. Unrealistic for 2,000 cubic feet.
* Option D (20 lifts): Incorrect. Underestimates.
* Option A (80 lifts): Correct.
質問 # 19
The operations that are 'in-house', or controlled entirely by the company establishing security for its operations is called:
- A. Contract security operations
- B. Proprietary security operations
- C. Control operations
- D. Staffing operations
正解:B
質問 # 20
Reserves are the people standing by in the event that assistance is needed by security personnel on fixed posts or patrol; duty.
- A. True
- B. False
正解:A
質問 # 21
When yard space and warehousing is required even in urban areas, __________ is the boundary of the property owned by the company.
- A. Fence
- B. Perimeter
- C. Wall
- D. Chain link
正解:B
質問 # 22
What is accurate about Activity 7001 in the precedence diagram?
- A. The LF is correct
- B. The LF is not correct
- C. The successor FF lag from 7001 to 11001 is not shown
- D. The TF is not calculated correctly
正解:B
解説:
The Late Finish (LF) of Activity 7001, when compared with dependencies in the precedence diagram, does not align with logical flow, indicating an error in its calculation.
Validating LF involves backward pass calculations, which must respect lags and durations.
References: PSP Study Guide, Section 2.3.4 - Schedule Change Management, and 2.4.3 - Schedule Analysis, focus on identifying and correcting logic or calculation errors in schedules.
質問 # 23
Determine the correct formula and date for the late finish for Activity 2002.
- A. LS of 2003 plus 1 day equaling to 07 Oct 2021
- B. LS of 2003 less 1 day equaling to 06 Nov 2021
- C. LS of 2003 less 1 day equaling to 06 Oct 2021
- D. LS of 2003 less 1 day equaling to 05 Oct 2021
正解:D
質問 # 24
What focus on legal principles and theories along with cases in which such principles predominate?
- A. Legal document
- B. Formal memorandum
- C. Encyclopedias
- D. None of the above
正解:C
質問 # 25
Baseline schedule can be submitted only__________.
- A. once the design for the construction gets approved
- B. once the safety quality and insurance requirements are met
- C. once the project gets impacted try change
- D. at the beginning or the construction
正解:D
質問 # 26
If all other work proceeds according to the Baseline plan, how many times will the critical path change?
- A. 2.
- B. 3.
- C. 1.
- D. Does not change.
正解:D
質問 # 27
Which of the following is NOT required when performing weekly or monthly schedule updates?
- A. Remaining duration of activities.
- B. Original duration of activities.
- C. Actual finish of activities.
- D. Percent complete.
正解:B
解説:
Update Process Essentials:
* Schedule updates track the current status of the project using actuals (start/finish dates), progress (percent complete), and future plans (remaining duration).
* The original duration does not change and is part of baseline data, not required for routine updates.
PSP Study Guide References:
* Scheduling update procedures are discussed, emphasizing active progress tracking elements like actual start, percent complete, and remaining duration.
Conclusion: The correct answer is D, as original duration is not a variable considered in regular updates.
質問 # 28
Which protocol divides the information into packets, sequentially numbers each packet, and inserts some error control information?
- A. Transmission Control protocol
- B. Information Control protocol
- C. File Transfer protocol
- D. None of the above
正解:A
質問 # 29
Which statement is true?
- A. Where compensability cannot be established, excusability is a given.
- B. Where compensability can be established, excusability is assumed.
- C. Where compensability cannot be established, excusability is assumed.
- D. Where compensability can be established, excusabltity cannot be assumed.
正解:B
解説:
* Compensability and Excusability:
* Excusable delays are those beyond the contractor's control, while compensable delays are excusable delays for which the owner bears responsibility.
* If a delay is compensable, it inherently qualifies as excusable.
* PSP Study Guide References:
* The relationship between excusability and compensability is clarified in delay analysis discussions.
* Conclusion: The correct answer is D, as compensability implies excusability.
質問 # 30
Using the "normal" schedule, theoretically construct a hammock for activities 2001 through 2004. What is the duration of the hammock?
- A. 168 days
- B. 183 days
- C. 91 days
- D. 193 days
正解:B
解説:
Hammock Activities (2001-2004):
* Activity 2001 ("River Diversion Stage 1"): Duration = 92 days.
* Activity 2002: Starts immediately after 2001, duration = 38 days.
* Activity 2003: Starts immediately after 2002, duration = 15 days.
* Activity 2004: Starts immediately after 2003, duration = 38 days.
Calculate the Duration:
* Total duration = 92 + 38 + 15 + 38 = 183 days.
Cross-Verification with Answer Options:
* Option A: Incorrect. Underestimates.
* Option C: Incorrect. Overestimates.
* Option D: Incorrect. Overestimates.
* Option B: Correct. Matches the calculated duration.
質問 # 31
These are the activities on the critical path:
- A. A, D, & I.
- B. A, B, G, & H.
- C. A, B, F, & J
- D. A, C, E, & H.
正解:B
解説:
Critical Path Identification:
* The critical path is the longest sequence of activities that determines the project's minimum duration.
* Path: A # B # G # H.
Exclusion of Other Options:
* Paths involving F, J, or non-critical activities do not align with the longest duration.
Verification with PSP Guidelines:The PSP Study Guide emphasizes identifying the critical path for schedule optimization (Ref: PSP Study Guide, Chapter 2A: Critical Path Analysis)
質問 # 32
Which of the following phases does NOT describe the commonly accepted construction life cycle?
- A. Turnover and start-up phase.
- B. Planning and design phase.
- C. Installation phase.
- D. Claims and disputes phase.
正解:D
解説:
Construction Life Cycle Phases:
* Common phases: planning and design, installation (execution), and turnover/start-up.
* Claims and disputes may arise during the project but are not a defined phase of the construction life cycle.
PSP Study Guide References:
* The study guide outlines standard phases without including claims and disputes as a formal phase.
Conclusion: The correct answer is A, as claims and disputes are not an inherent phase of the construction life cycle.
質問 # 33
A system of discussion groups in which individual articles are distributed throughout the world is called:
- A. Usenet
- B. Telnet
- C. Web net
- D. Widespread net
正解:A
質問 # 34
An earned value-based project control system can use either of which two budgets as the basis of its calculations?
- A. Earned or budgeted cost yearly.
- B. Labor hours or dollars.
- C. Direct or indirect cost.
- D. Linear feet or dollars.
正解:B
解説:
An earned value management (EVM) system can base its calculations on labor hours or monetary values, depending on the nature of the project. Both methods are valid for tracking performance and forecasting outcomes.
* Option B (direct or indirect cost) does not align with EVM's focus on performance metrics.
* Option C confuses timeframes with budgeting principles.
* Option D (linear feet or dollars) applies to physical progress tracking but not directly to EVM systems.
This is consistent with EVM principles as outlined in project control methodologies within the PSP materials.
質問 # 35
......
ASIS PSP認定は、セキュリティ専門家の知識と専門知識を包括的に評価するように設計されています。この試験では、物理的なセキュリティ評価、セキュリティ設計と実装、セキュリティ管理の実践、リスク評価と管理など、幅広いトピックをカバーしています。この試験は、エントリーレベルのセキュリティ担当者から上級セキュリティマネージャーまで、あらゆるレベルのセキュリティ専門家の知識とスキルをテストするように設計されています。
PSP時間限定!無料アクセス:https://www.passtest.jp/ASIS/PSP-shiken.html
PSP認定有効な試験問題集と解答学習ガイド:https://drive.google.com/open?id=1CdPnHW08lmLSsRFuKWyz64APEaeVNzes