質問 # 35
What is a core application in Maximo Manage?
- A. Maintenance Version Control
- B. Graphical Scheduling
- C. Customer Billing
- D. Permit to Work
正解:D
解説:
The Permit to Work application is a core application in IBM Maximo Manage v8.0. This application allows users to manage work permits, ensure compliance with safety regulations, and ensure that work is authorized before it is started. Other core applications in Maximo Manage include Work Order Tracking, Asset Management, and Inventory Management.
質問 # 36
Which Maximo application can be used to generate replacement plans for assets?
- A. Maximo Health
- B. Maximo Predict
- C. Maximo Health, Safety and Environmental (HSE)
- D. Maximo Manage
正解:A
解説:
The Maximo Health application can be used to generate replacement plans for assets.
質問 # 37
In the Receiving application, what are the three statuses that show the overall receipt status of the purchase order?
- A. COMPLETE
- B. NONE
- C. RETURNED
- D. WINSP
- E. VOID
- F. PARTIAL
正解:A、B、F
解説:
In the Receiving application in IBM Maximo Manage, the three statuses that show the overall receipt status of the purchase order are COMPLETE, PARTIAL and NONE.
質問 # 38
What information can be updated in the Master PM application for an associated Preventive Maintenance record (PM)?
- A. Generate Work Orders
- B. Work Order Status
- C. PM Hierarchy
- D. PM Forecast
正解:D
解説:
The PM Forecast field on the Master PM record is used to specify how many days ahead you want to forecast work orders for associated PMs2. This field can be updated in the Master PM application and affects how many work orders are generated from the associated PMs.
質問 # 39
When working with Purchase Requests, which statement is correct?
- A. All Purchase Requests must be approved by an authorized person.
- B. Purchase Request must have a vendor specified.
- C. One Purchase Request can contain both Item and Material type lines
- D. Purchase Request Description is mandatory in the header section.
正解:C
解説:
When working with Purchase Requests in IBM Maximo Manage, one Purchase Request can contain both Item and Material type lines.
質問 # 40
In the Inventory Usage application when the type is TRANSFER, if a user changes the status to COMPLETE what type of transaction record is created?
- A. Transaction Type TRANSFER in MATRECTRANS table
- B. Transaction Type SHIPTRANSFER in MATRECTRANS table
- C. Transaction Type RETURN in MATUSETRANS table
- D. Transaction Type ISSUE in MATUSETRANS table
正解:B
解説:
In the Inventory Usage application when the type is TRANSFER, if a user changes the status to COMPLETE a transaction record of type SHIPTRANSFER is created in the MATRECTRANS table.
質問 # 41
The loT Connector provides Maximo Manage, Maximo Health and Maximo Predict the ability to connect to which two data sources?
- A. Maximo Monitor
- B. Maximo Assist
- C. IBM Watson loT Platform
- D. Maximo Spatial
- E. Maximo Safety
正解:A、C
解説:
IoT Connector provides Maximo Manage, Maximo Health and Maximo Predict the ability to connect to C. IBM Watson IoT Platform and E. Maximo Monitor data sources. The IoT Connector in the Administration Work Center can be used to configure a connection to an IoT platform such as IBM Watson IoT Platform and IBM Maximo Asset Monitor1.
質問 # 42
What are three integration End Points Handlers available in Maximo Manage?
- A. XMLFILE
- B. WSDL
- C. EMAIL
- D. FLATFILE
- E. XLS
- F. KAFKA
正解:A、C、D
解説:
Three integration End Points Handlers available in Maximo Manage are XMLFILE, EMAIL and FLATFILE.
質問 # 43
What happens if the Specification of a rotating item is updated in the Item Master application?
- A. By default, all locations and assets referencing the rotating item will be updated with the changes.
- B. By default, existing assets referencing the rotating item will be updated with the changes, there are no changes to existing locations.
- C. Only locations inherit the specification from a rotating item and only when new locations are created. Assets only inherit the specification from an asset template.
- D. New locations and assets that reference the rotating item will inherit the changes, there are no changes to existing locations and assets.
正解:D
解説:
If the Specification of a rotating item is updated in the Item Master application, new locations and assets that reference the rotating item will inherit the changes. There are no changes to existing locations and assets.
質問 # 44
What is the result of selecting the Validate GL Component Combinations in the Chart of Accounts application on financial transactions?
- A. Any GL component can be used.
- B. Any valid GL component can be used.
- C. Only valid GL accounts can be used.
- D. Validates transactions occurred during an active financial period.
正解:C
解説:
When selecting the Validate GL Component Combinations in the Chart of Accounts application on financial transactions in IBM Maximo Manage, only valid GL accounts can be used.
質問 # 45
When creating a new Inspection form, a client requires a Work Order to be created if certain responses are recorded. Which two actions are required for this to be achieved?
- A. In Form Settings add an Action Script.
- B. In the Question Options, set the Require action flag.
- C. Choose Work Order on question action.
- D. Create an escalation on the QRESPONSE Object.
- E. Make the question response interactive.
正解:B、C
解説:
According to the IBM documentation, you can create inspection forms that detail the questions and types of responses that you want to collect. The inspection forms that you create are then available to inspectors in the Conduct an Inspection tool. You can also add conditions to the response fields of existing questions on inspection forms to gather more information. You can determine which additional response fields appear to inspectors, depending on the answers they gave to inspection form questions.
To create a work order based on certain responses, you need to do two things:
Choose Work Order on question action: This option allows you to specify an action that is triggered when a certain response is selected by the inspector. For example, if a question asks "Is there any damage?", and the inspector selects "Yes", you can choose Work Order as the action that is triggered by this response. This will create a work order for repairing the damage.
In the Question Options, set the Require action flag: This option allows you to indicate that an action is required for a question. For example, if a question asks "Is there any damage?", and you set the Require action flag to Yes, then the inspector must select a response that triggers an action, such as Work Order or Notification. If they select a response that does not trigger an action, such as "No" or "N/A", they will see an error message and will not be able to submit the inspection form.
質問 # 46
Which application in the IBM Maximo Application Suite can be used to perform criticality scoring?
- A. Maximo Prevent
- B. Maximo Health
- C. Maximo Manage
- D. Maximo Supervision
正解:B
解説:
The Maximo Health application in the IBM Maximo Application Suite can be used to perform criticality scoring.
質問 # 47
Select all that apply
What is the priority order for selecting a Safety Plan when a Job Plan is applied to a Work Order?
正解:
解説:
1 - Use the Safety Plan associated with the Asset referenced on the Work Order.
2 - Use the Safety Plan associated with the Location referenced on the Work Order.
3 - Use the Safety Plan associated with the Asset's Rotating Item, for the Asset referenced on the Work Order.
4 - Use the Safety Plan associated with the Location's Rotating Item, for the Location referenced on the Work Order.
質問 # 48
What are the three default values used with the position of a Crew Type or Crew?
- A. Apprentice
- B. Helper
- C. Leader
- D. Technician
- E. Driver
- F. Supervisor
正解:A、B、C
解説:
In IBM Maximo Manage v8.0 implementation, the three default values used with the position of a Crew Type or Crew are Helper, Leader, and Apprentice. These values represent the different roles that members of a crew can assume.
質問 # 49
In the Organizations application, which action is used to create Inventory Usage documents for new reservations?
- A. Inventory Usage Options
- B. Inventory Options
- C. Reservation Options
- D. Work Order Options
正解:C
解説:
In the Organizations application in IBM Maximo Manage, you should use Reservation Options to create Inventory Usage documents for new reservations.
質問 # 50
When a Service Level Agreement is applied to a WORKORDER object, what Commitment Type will be missing from the lookup?
- A. CONTACT
- B. DELIVERY
- C. DOWNTIME
- D. AVAILABILITY
正解:B
解説:
When a Service Level Agreement (SLA) is applied to a WORKORDER object in IBM Maximo Manage v8.0 implementation, the Commitment Type that will be missing from the lookup is DELIVERY. The other possible Commitment Types in Maximo Manage are DOWNTIME, AVAILABILITY, and CONTACT.
質問 # 51
If additional attributes are added to the Work View, how can they be automatically updated from changes made to a corresponding Ticket and Work Order fields?
- A. by adding a Crossover Domain to TICKETID or WONUM
- B. by modifying the existing Object Launch Point automation script UpdateWV
- C. by updating the existing Cron Task UpdateWorkView that has two instances TKT2WV and W02WV that use the Crossover Domains of the same name
- D. by modifying the existing Crossover Domains TKT2WV or W02WV
正解:D
解説:
In IBM Maximo Manage v8.0 implementation, if you add additional attributes to the Work View and want them to be automatically updated from changes made to corresponding Ticket and Work Order fields, you can modify the existing Crossover Domains TKT2WV or W02WV. Crossover Domains define a mapping between fields on two different objects, allowing data to be synchronized between them.
質問 # 52
To what type of objects can a Service Level Agreement be applied?
- A. only the Main Object that are Internal
- B. only the objects based on the Work Order or Ticket Classes, and Assets, Locations and Configuration Items
- C. only the objects based on the Work Order or Ticket Classes
- D. any Main Object
正解:B
解説:
A Service Level Agreement can be applied only to objects based on the Work Order or Ticket Classes, and Assets, Locations and Configuration Items.
質問 # 53
In what Maximo Manage application are the specifications of an asset for calibration entered?
- A. Data Sheet Template
- B. Classifications
- C. Improvements
- D. Asset
正解:A
解説:
In IBM Maximo Manage, the specifications of an asset for calibration are entered in the Data Sheet Template application.
質問 # 54
What is a licensing method used to obtain the Maximo Asset Suite?
- A. Monthly license
- B. Cloud based license
- C. Feature based license
- D. User credits license
正解:B
解説:
One licensing method used to obtain the Maximo Asset Suite is a Cloud based license.
質問 # 55
Which statement is true regarding Master Preventative Maintenance (PM) records?
- A. Associated PM records can only be created for a rotating item's location.
- B. Associated PM records can only be created for a rotating item's asset.
- C. Associated PM records can be created for a Master PM which does not have an item
- D. Associated PM records are temporary and expire after 90 days.
正解:C
解説:
Regarding Master Preventative Maintenance (PM) records in IBM Maximo Manage, associated PM records can be created for a Master PM which does not have an item.
質問 # 56
......
C1000-132試験問題集で100%高得点させるC1000-132試験解答がこちら:https://www.passtest.jp/IBM/C1000-132-shiken.html
検証済みのC1000-132試験問題成功確定させます:https://drive.google.com/open?id=1eYE7qoeUzjwLSaBGKDXctPD6FttLIPzK