質問 # 54
In the Automation Scripts application, which launch point can be triggered?

  • A. Integration
  • B. Formula
  • C. Cron Task
  • D. Escalation

正解:A

解説:
In the IBM Maximo Automation Scripts application, several types of launch points can be configured to trigger scripts, including Integration launch points. The supported launch points in Maximo are:
* Object Launch Point: Triggers on events related to specific objects (MBOs), such as creation, modification, or deletion
* Attribute Launch Point: Triggers when specific attributes within an MBO are accessed or modified
* Action Launch Point: Executes custom actions, often triggered by workflows or escalations, allowing for automation without custom Java code
* Condition Launch Point: Activates when a defined condition is met, commonly used for security or workflow condition logic
* Integration Launch Point: Designed specifically to interact with Maximo Integration Framework (MIF) components, including publish channels, enterprise services, and invocation channels. This enables automation scripts to respond to data exchanges between Maximo and external systems, making it a powerful tool for integration-related automations The Integration launch point is thus the correct answer as it allows scripts to be triggered by data flow events through MIF.


質問 # 55
In the Assets application a used engine needs to be replaced with a rebuilt engine, how might the rebuilt engine inherit the depreciation schedule from the used engine?

  • A. Use the action Exchange Depreciation Schedules.
  • B. Use the action Split Depreciation Schedules.
  • C. Use the action Swap Depreciation Schedules.
  • D. Use the action Copy Depreciation Schedules.

正解:C

解説:
To replace a used engine with a rebuilt engine in the Assets application in IBM Maximo Manage v8.0 implementation and inherit the depreciation schedule from the used engine, you can use the "Copy Depreciation Schedules" action. This action allows you to copy the depreciation schedules from the old asset to the new asset, including the depreciation terms and any calculation information.


質問 # 56
In the Assets application when reporting downtime, what is an example of a Downtime Type?

  • A. Starting Up
  • B. Line Change Over
  • C. Non-Operational
  • D. Shutting Down

正解:C


質問 # 57
What are three available associations in the Hazards application?

  • A. Tag Outs
  • B. Safety Plans
  • C. Hazardous Materials
  • D. Material Safety Data Sheets (MSDS)
  • E. Precautions
  • F. Lock Outs

正解:A、C、E

解説:
The Hazards application in IBM Maximo Manage v8.0 allows users to associate Material Safety Data Sheets (MSDS), Hazardous Materials, and Precautions with a particular hazard. These associations help in managing safety information related to hazards and in ensuring compliance with safety regulations.


質問 # 58
How is the Lock Out / Tag Outs application structured?

  • A. Specify a Lock Out on the Location or Asset and define the Tag Out Operations.
  • B. Specify a Lock Out on an Asset with a Locking Device and define the Tag Out Operations.
  • C. Specify a Tag Out on the Location or Asset and define the Lock Out Operations.
  • D. Define the isolation procedures on a set of related assets and specify a sequence.

正解:A

解説:
In IBM Maximo Manage v8.0 implementation, the Lock Out / Tag Out application is structured such that you specify a Lock Out on the Location or Asset and define the Tag Out operations. This application is used to manage the procedures and controls put in place to protect personnel from injury due to unintended or inadvertent equipment or system operation.


質問 # 59
In the Preventive Maintenance (PM) application, how is the Estimated Next Due Date calculated when Adjust Next Due Date is selected?

  • A. Extended Date + Alert Lead (Days)
  • B. Extended Date + Frequency
  • C. Extended Date -Alert Lead (Days)
  • D. Extended Date + Target Start Time

正解:B


質問 # 60
Select all that apply
What is the appropriate order of phases in order to create a workflow process?

正解:

解説:

Explanation:
The appropriate order of phases in order to create a workflow process in IBM Maximo Manage is:
* Create the process: This involves designing the workflow process using the Workflow Designer application, including creating the activities, transitions, and conditions that make up the process.
* Validate the process: This involves ensuring that the process has been designed correctly and meets the desired requirements. This can be done by testing the process and making any necessary adjustments.
* Enable the process: This involves making the process available for use in the system by enabling it in the Workflow Designer application.
* Activate the process: This involves activating the process in the Workflow Administration application so that it is ready for use by the system.


質問 # 61
Which application in the IBM Maximo Application Suite uses both Al and remote human-based interactions to help technicians receive on-demand assistance?

  • A. Maximo Assist
  • B. Maximo Manage
  • C. Maximo Safety
  • D. Maximo Monitor

正解:A

解説:
Maximo Assist uses both Al and remote human-based interactions to help technicians receive on-demand assistance.


質問 # 62
What three types of periods can be defined for a Budget Monitoring record? (Choose three.)

  • A. Financial Periods
  • B. Year
  • C. A period defined with a start date and end date.
  • D. Quarter
  • E. Budget Period
  • F. Month

正解:A、B、C


質問 # 63
How can a Master Preventive Maintenance record be associated with multiple non-rotating assets?

  • A. Add the Assets to the Multiple Assets table on the Master Preventive Maintenance record.
  • B. Use the Apply Down Hierarchy action on the Master Preventive Maintenance record.
  • C. Use the Move/Modify Assets action.
  • D. Use an Asset Template.

正解:D


質問 # 64
In the Work Order Tracking application, when using the Select Value on the Safety Plans field from where can the safety plan be derived?

  • A. Safety Plans where the Location or Asset on the Work Order is referenced as a Work Asset on the Safety Plan.
  • B. It always shows Active Safety Plans that are in the same site as the work order.
  • C. The Safety Plan that is associated with the Preventive Maintenance record.
  • D. Safety Plans that are referenced in the Location Hierarchy.

正解:A


質問 # 65
In the Inventory Usage application when the type is TRANSFER, if a user changes the status to COMPLETE what type of transaction record is created?

  • A. Transaction Type SHIPTRANSFER in MATRECTRANS table
  • B. Transaction Type RETURN in MATUSETRANS table
  • C. Transaction Type ISSUE in MATUSETRANS table
  • D. Transaction Type TRANSFER in MATRECTRANS table

正解:D

解説:
https://maximosecrets.com/2020/07/03/a-summary-of-the-financial-processes-in-inventory-usage/


質問 # 66
In which status can a Job Plan be modified to add a new task?

  • A. PNDREV
  • B. INACTIVE
  • C. NEW
  • D. REVISED

正解:D


質問 # 67
Where can Default Values be specified for Service Requests created using the Service Request Work Center?

  • A. Service Desk Application
  • B. Application Designer
  • C. in the users Profile
  • D. Administration Work Center

正解:D


質問 # 68
In the Purchase Orders application, what is the result of the action Complete Receipts?

  • A. It will set the Receipt status to COMPLETE and create the receiving lines for the remaining items.
  • B. The status of the Purchase Order will be changed to CLOSED.
  • C. It will send a notification to the requester that the Purchase Order has been completed.
  • D. It will set the Receipt status to COMPLETE, but will not create the receipt lines.

正解:D


質問 # 69
Apart from Standard and Average, what other three costing methods can be used in the Inventory application?

  • A. Asset
  • B. FIFO
  • C. LILO
  • D. LIFO
  • E. Weighted Average
  • F. FILO

正解:A、B、D

解説:
Apart from Standard and Average costing methods in IBM Maximo Manage's Inventory application, three other costing methods that can be used are FIFO (First In First Out), LIFO (Last In First Out) and Weighted Average.


質問 # 70
Which Maximo application can be used to generate replacement plans for assets?

  • A. Maximo Health
  • B. Maximo Manage
  • C. Maximo Health, Safety and Environmental (HSE)
  • D. Maximo Predict

正解:A

解説:
IBM Maximo Health, part of the Maximo Application Suite, is specifically designed to enable comprehensive asset performance monitoring, including the capability to generate replacement plans for assets. With Maximo Health, users can assess an asset's remaining useful life, criticality, and health scores to make data-driven decisions about whether to repair, refurbish, or replace an asset.
Key features in Maximo Health that facilitate replacement planning include:
* Expected Life and Replacement Planning: Users can evaluate assets approaching the end of their lifecycle. For assets flagged for replacement or nearing their projected end of life, Maximo Health offers views like the "Expected Life" or "Plan Costs" to initiate a replacement plan. This process allows for strategic planning of asset replacements to ensure operational reliability and cost-effectiveness IBM GitHub Maximo Health integrates data from asset condition monitoring, usage history, and criticality analysis, allowing for a proactive approach to asset management and enabling organizations to optimize maintenance budgets by planning replacements only when necessary. Thus, option B (Maximo Health) is the correct answer.


質問 # 71
If a Service Request has a follow-up Work Order, by default at what two Work Order internal statuses would the Service Requests status be updated? (Choose two.)

  • A. CLOSE
  • B. APPR
  • C. INPRG
  • D. CAN
  • E. comp

正解:C、E


質問 # 72
At which data storage level are locations, assets and storerooms defined?

  • A. Organization
  • B. Set
  • C. System
  • D. Site

正解:D

解説:
Locations, assets and storerooms are defined at the Site level in IBM Maximo Manage.


質問 # 73
In the Item Master application can an item be associated with a meter?

  • A. It cannot be associated with any item.
  • B. A meter field can only be associated with rotating items.
  • C. A meter field can only be associated with non-rotating items.
  • D. It can be associated with all items.

正解:C


質問 # 74
How many failure reports can be created for the same Work Order?

  • A. just one failure report
  • B. unlimited failure reports for either a work order or any of its tasks
  • C. one failure report for the work order and only one for each task of the work order
  • D. unlimited failure reports for each work order, but none for a task

正解:C

解説:
In IBM Maximo Manage, you can create one failure report for a Work Order and only one for each task of the Work Order.


質問 # 75
At what database level does a Job Plan exist?

  • A. SYSTEM
  • B. SYSTEMORGSITE
  • C. ORG
  • D. SITE

正解:B

解説:
https://maximosecrets.com/2022/04/28/job-plans/


質問 # 76
The loT Connector provides Maximo Manage, Maximo Health and Maximo Predict the ability to connect to which two data sources?

  • A. IBM Watson loT Platform
  • B. Maximo Assist
  • C. Maximo Safety
  • D. Maximo Monitor
  • E. Maximo Spatial

正解:A、D

解説:
IoT Connector provides Maximo Manage, Maximo Health and Maximo Predict the ability to connect to C. IBM Watson IoT Platform and E. Maximo Monitor data sources. The IoT Connector in the Administration Work Center can be used to configure a connection to an IoT platform such as IBM Watson IoT Platform and IBM Maximo Asset Monitor1.


質問 # 77
What is the default status in the Quick Reporting Application?

  • A. ENTERED
  • B. APPR
  • C. INPRG
  • D. DRAFT

正解:D

解説:
The default status in the Quick Reporting Application in IBM Maximo Manage is DRAFT.


質問 # 78
......


IBM Maximo Manage v8.0ソフトウェアは、組織が資産を効率的に管理するのに役立つ包括的な企業資産管理ツールです。このソフトウェアは、資産の調達から廃棄までの完全なライフサイクルを追跡・管理することができます。また、資産のパフォーマンスについてリアルタイムの可視性を提供し、メンテナンスや修理に関する情報を提供することで、組織が情報に基づいた意思決定を行えるよう支援します。


IBM C1000-132 試験は、60問の多肢選択問題から構成され、90分間のテストです。この試験は、候補者が IBM Maximo Manage v8.0 の知識と、ビジネス要件を満たすためにソフトウェアを実装・設定する能力を測定するために設計されています。また、データ管理、セキュリティ、レポート作成などのトピックも扱います。


IBM C1000-132認定試験は、EAMドメインでのキャリアを強化したい専門家にとって貴重な機会です。この試験では、IBM Maximo Manage V8.0の実装に関連するさまざまなトピックをカバーしており、試験に合格すると、この分野での個人の専門知識が示されています。この認定はグローバルに認識されており、競争力のある雇用市場で専門家が際立っているだけでなく、EAMドメインの最新の開発を最新の状態に保つために排他的なIBMリソースにアクセスすることができます。

 

無料C1000-132試験問題集試験点数を伸ばそう:https://www.passtest.jp/IBM/C1000-132-shiken.html

2025年最新の実際に出るC1000-132問題集には試験のコツがあるPDF試験材料:https://drive.google.com/open?id=1eYE7qoeUzjwLSaBGKDXctPD6FttLIPzK