最新CCPテスト材料には有効なCCPテストエンジン [Q53-Q72]

Share

最新CCPテスト材料には有効なCCPテストエンジン

CCP更新された試験問題集で[2023年最新] 練習には有効な試験問題集

質問 53
What do you call a person authorized to represent another (the principal) in some capacity? He/she can only act within this capacity or "scope of authority" to bind the principal.

  • A. Engineer
  • B. Agent
  • C. Alternate
  • D. Project Manager

正解: B

 

質問 54
The four steps to writing are:

  • A. Abstract, body conclusion, bibliography
  • B. Plan, write, cool, revise
  • C. Introduction, paragraph, conclusion, works cited
  • D. Start, write, complete, revise

正解: B

 

質問 55

The following question requires your selection of CCC/CCE Scenario 28 (3.7.50.1.7) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
If the owner in A has a primary goal of completion within budget, the following contract types with the engineer/contractor would be best:

  • A. Engineer fixed price, contactor cost plus
  • B. Engineer - cost plus, contractor cost plus
  • C. Engineer - fixed price, contractor fixed price
  • D. Engineer - cost plus, contractor fixed price

正解: C

 

質問 56
An agricultural corporation that paid 53% in income tax wanted to build a grain elevator designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000.
Answer the question using a straight line depreciation and a 10% interest rate.
The following question requires your selection of CCC/CCE Scenario 17 (4.2.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
Annual estimated tax would be:

  • A. $5,565
  • B. $3,869
  • C. $10,500
  • D. $11,925

正解: A

 

質問 57
An agricultural corporation that paid 53% in income tax wanted to build a grain elevator designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000.
Answer the question using a straight line depreciation and a 10% interest rate.
The following question requires your selection of CCC/CCE Scenario 17 (4.2.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
Assuming a 53% tax rate, how much cumulative depreciation will have been claimed at the end of the grain elevator's life span?

  • A. $37,600
  • B. None
  • C. $80,000
  • D. $42,400

正解: C

 

質問 58
Two of the most important things to know when planning a speech or lecture are the ______________and______________ of your audience.

  • A. Motivation, professionalism
  • B. Background, attitude
  • C. Culture, understanding
  • D. Political preference, sense of humor

正解: C

 

質問 59
An agricultural corporation that paid 53% in income tax wanted to build a grain elevator designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000.
Answer the question using a straight line depreciation and a 10% interest rate.
The main financial objective of many enterprises is:

  • A. Dependent on the backlog projects and the availability of resources
  • B. To balance opportunities and risks
  • C. Subject to a well-conceived quality control plan
  • D. To maximize the total long-term economic return

正解: D

 

質問 60
Money is value. Having money when you need it is very important. Money can also be valuable when used wisely by knowing when to spend and when to conserve Also, planning now for future expenses can be a plus to the company rather than a debit.
There are several ways to capitalize money and spending. Basically there is the single payment method that has a compound amount factor and a present worth factor. There is the uniform annual series that has a sinking fund factor, capital recovery factor and also the compound amount factor and present worth factor. At this point, we can assure money is worth 10%.
The following question requires your selection of CCC/CCE Scenario 7 (4.8.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
If $10,000 is scheduled to be paid out 5 years from now, what is the minimum amount we can invest today?

  • A. $3,791
  • B. $3,855
  • C. $6,209
  • D. $8,129

正解: C

 

質問 61
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
Resource planning must take all of the following into account except:

  • A. Cash flow (expenditures) limitations for completing work on the project
  • B. Earned value techniques established for the project
  • C. Time available to complete the project
  • D. Types of materials, equipment and labor skills required to complete the project

正解: B

 

質問 62
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
You are reporting on a roadway project, which was estimated to be 10 miles of road. It was scheduled to be completed in 16 weeks, which is this week. According to your calculations, the project has a schedule performance index of 0.80. What would you advise the management about the scheduled completion date?

  • A. Project will be completed in 4 more weeks
  • B. Project will be completed this week - on schedule
  • C. Project will be completed in 12.8 more weeks
  • D. Project will be completed in 20 more weeks

正解: A

 

質問 63
If you deposit $100 per month for two (2) years and earn interest at 12% APR (Annual Percentage Rate) compounded monthly, how much will you have at the end of the period?

  • A. $2,688
  • B. $2,424
  • C. $2,697
  • D. $2,976

正解: B

 

質問 64
An agricultural corporation that paid 53% in income tax wanted to build a grain elevator designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000.
Answer the question using a straight line depreciation and a 10% interest rate.
Which of the following should be included in the life-cycle cost analysis of a power plant?

  • A. Resources, work activities, final cost objects
  • B. Construction cost, operating cost, maintenance cost
  • C. Factory expenses, distribution expenses, mark-up
  • D. Capacity factor, end product units, physical dimensions

正解: B

 

質問 65
Which of the following is NOT a type of float?

  • A. Open end
  • B. Total
  • C. Free
  • D. Negative

正解: A

 

質問 66
An agricultural corporation that paid 53% in income tax wanted to build a grain elevator designed to last twenty-five (25) years at a cost of $80,000 with no salvage value. Annual income generated would be $22,500 and annual expenditures were to be $12,000.
Answer the question using a straight line depreciation and a 10% interest rate.
The following question requires your selection of CCC/CCE Scenario 17 (4.2.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
Present worth calculations is represented by which of the following equations?

  • A. Option C
  • B. Option B
  • C. Option A
  • D. Option D

正解: D

 

質問 67
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
The following is NOT an advantage of the critical path method:

  • A. The ability to identify activities that cannot have their schedules slip if the desired project end date is to be achieved
  • B. The ability to show slippage in the progress of key activities
  • C. The ability to determine cost overruns of critical path activities
  • D. Reveals activities that additional resources need to be dedicated toward

正解: C

 

質問 68
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
The following question requires your selection of CCC/CCE Scenario 26(2.5.50.1.2) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
Select the statement that best describes the meaning of the +/-notations associated with an estimate. The actual cost is expected:

  • A. To fall within the percentage range stated
  • B. To be exactly the percentages stated
  • C. To be higher or lower that the percentages stated
  • D. To be outside the percentages stated

正解: A

 

質問 69
Money is value. Having money when you need it is very important. Money can also be valuable when used wisely by knowing when to spend and when to conserve Also, planning now for future expenses can be a plus to the company rather than a debit.
There are several ways to capitalize money and spending. Basically there is the single payment method that has a compound amount factor and a present worth factor. There is the uniform annual series that has a sinking fund factor, capital recovery factor and also the compound amount factor and present worth factor. At this point, we can assure money is worth 10%.
The following question requires your selection of CCC/CCE Scenario 7 (4.8.50.1.1) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
A contractor must purchase a piece of equipment for $150,000. It has an estimated life of 10 years with no salvage value at the end. Ten years from now it will be necessary to purchase another piece of equipment, but this time it will cost $250,000. How much will the contractor need to invest at the end of each year in order to have the right amount?

  • A. $9,412
  • B. $12,550
  • C. $16,273
  • D. $15,687

正解: C

 

質問 70
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
The following question requires your selection of CCC/CCE Scenario 26 (2.5.50.1.2) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
What information is needed to develop a Class 2 definitive estimate?

  • A. Square footage of facilities, factored indirects and home office costs
  • B. Preliminary quantities with labor, material, and factors applied, square footage of facilities, minimum contingency detailed indirect costs
  • C. Vendor quotes, home office detailed estimate, preliminary quantities with labor, material, and factors applied
  • D. Soil data, detailed construction drawings, quantity takeoffs, minimum contingency detailed indirect costs, detailed engineering estimates

正解: D

 

質問 71
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
The following question requires your selection of CCC/CCE Scenario 26 (2.5.50.1.2) from the right side of your split screen, using the drop down menu, to reference during your response/choice of responses.
What class of estimate is used for the preliminary design phase of a project?

  • A. Class 1 - order of magnitude with +30% / -30% accuracy
  • B. Class 5 - order of magnitude estimate with +50% / -30% accuracy
  • C. Class 4 - budget estimate with +30% / -15% accuracy
  • D. Class 2 - definitive estimate with +15%/-5% accuracy

正解: B

 