質問 # 41
For what production type are production orders used?
- A. Process manufacturing processes
- B. Replenishment controlled by control cycles
- C. Period and quantity-oriented production
- D. Discrete manufacturing processes
正解:D
質問 # 42
When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?
- A. The cross-plant status
- B. The plant-specific status
- C. The last restrictive status
- D. The most restrictive status
正解:D
質問 # 43
What detremines whatherthe planned independent requirements in MRP are consumed by other requrements?
- A. Requirements type
- B. Order type
- C. Requirements profile
- D. Consumption sequence procedure
正解:A
質問 # 44
Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements?
- A. Total replenishment lead time
- B. Planed delivery time
- C. Operation duration
- D. In-house production time
正解:B、D
質問 # 45
What are some uses for the low-level code assigned to each material?
- A. It is used in MRP to determine the sequence in which materials are planned.
- B. It is used by product costing to determine how coast are rolled up.
- C. it is used by ATP to determine the priority of alternative components.
- D. It is used by engineering to indentify subitems in an engineering bill of material (BOM).
正解:A、B
質問 # 46
Which of the following is valid sequence of the main activities in production order processing?
- A. Creation, availability check, release, material widrawal, confirmation
- B. Creation, printing, release, goods issue, confirmation, goods receipt
- C. Creation, release, printing, goods issue, confirmation, goods receipt
- D. Creation, release, settlement, goods issue, confirmation, goods receipt
正解:A、C
質問 # 47
Which item statuses can you select inside a material BOM?
- A. Quality management
- B. Engineering
- C. Service
- D. Sales
正解:B、D
質問 # 48
What are the consequences when you assgn a planned order to a production line manually, using the planning table in repetitive manufacturing?
- A. The planed order is converted to production order.
- B. The planned order's components are copied to the picking list.
- C. The planed order generates capacity requirements
- D. The planed order's component availability is checked.
正解:C
質問 # 49
You want to schedule an operation finitely, without moving other operations. Which scheduing strategy do you select?
- A. Schedule in working time only
- B. Squeeze in
- C. Find slot
- D. Insert operation
正解:C
質問 # 50
When do you use variant bills of materials (BOMs)?
- A. When multiple materials also have similar BOMs
- B. When a material has a configurable BOM
- C. When a material has multiple BOMs
- D. When multiple materials have multiple BOMs
正解:D
質問 # 51
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
- A. 100% check
- B. Simultaneous
- C. By usage probability
- D. First in first out (FIFO)
正解:A、C
質問 # 52
How can you set up the supply source for the Kanban process in SAP S/4HANA?
- A. Using purchasing costs for automated source prioritization
- B. Using quotations for internal and external procurement
- C. Using stock transfer reservations for stock transfer
- D. Using purchase orders for external procurement
- E. Using run schedule quantities for in-house production
正解:C、D、E
質問 # 53
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing?
- A. Run PP/DS heuristics for repetitive manufacturing.
- B. Run MRP with automatic selection of production version.
- C. Assign planned orders manual lying the planning table.
- D. Run MRP with quota arrangement.
正解:A、D
質問 # 54
Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?
- A. Assign the alert profile to the overall profile.
- B. Create object selection variant for transportation lane-related alerts.
- C. Assign the overall profile to the authorization profile.
- D. Create object selection variant for product-related alerts.
正解:A、D
質問 # 55
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
- A. Make-to-order production (20)
- B. Planning with final assembly (40)
- C. Planning at assembly level (70)
- D. Planning without final assembly (50)
正解:D
質問 # 56
What does it mean for the production planner when MRP works with infinite capacities?
- A. MRP creates capacity requirements without checking the capacity of a work center.
- B. MRP creates capacity requirements only if the work center has sufficient capacity.
- C. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
- D. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
正解:A
質問 # 57
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.
- A. Finiteness level
- B. Scheduling control
- C. Direction
- D. Fixed pegging
- E. Planning mode
正解:B、C、E
質問 # 58
You set up a material as a phantom assembly by entering the special procurement key in the material master.
How can you switch off the phantom assembly in a specific bill of material (BOM)?
- A. Change the explosion type of the phantom assembly in the BOM.
- B. Change the special procurement key of the phantom assembly in the BOM.
- C. Change the phantom item indicator for the phantom assembly in the BOM.
- D. Change the item category of the phantom assembly in the BOM.
正解:A
質問 # 59
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
- A. Fill up to the reorder stock level
- B. Fill up based on the lot size procedure
- C. Fill up to the safety stoc level
- D. Fill up to the maximum stock level
正解:B
質問 # 60
Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. WBS item
- B. Non-stock item
- C. Variable-size item
- D. Work item
正解:B、C
質問 # 61
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?
- A. Production order release
- B. Backflushing
- C. Material requirements planning
- D. Kanban
正解:C
質問 # 62
What does forecasting in demand planning cycle include?
- A. Past procurment quantities
- B. Past sales order quantites
- C. Past quotation quantities
- D. One-off events
- E. Market intelligence
正解:B、D、E
質問 # 63
Your quality department detect a deviation in a raw material batch. Unfortunately, this batch has already been used in producion. How can you indentify all affected finish goods stocks?
- A. Use the material staging report.
- B. Use batch determination.
- C. Use the batch information cockpit.
- D. Use the material where-used report.
正解:C
質問 # 64
In the Schedule Production app which setting can you make for the planning strategy?
- A. Fitness level
- B. Scheduling control
- C. Direction
- D. Fixed pegging
- E. Planning mode
正解:B、C、E
質問 # 65
During production order creation, several valid production versions are found. How does the system choose the production version?
- A. Planned order or material number
- B. Alphanumeric or quota arrangement
- C. Valid period or sale order
- D. Lot size or material cost
正解:B
質問 # 66
......