無料で使えるC_TS422_2021サンプル問題で100%カバー率のリアル試験問題(更新された82問あります) [Q41-Q66]

Share

無料で使えるC_TS422_2021サンプル問題で100%カバー率のリアル試験問題(更新された82問あります)

今すぐダウンロード!リアルSAP C_TS422_2021試験問題集テストエンジン試験問題

質問 # 41
For what production type are production orders used?

  • A. Process manufacturing processes
  • B. Replenishment controlled by control cycles
  • C. Period and quantity-oriented production
  • D. Discrete manufacturing processes

正解:D


質問 # 42
When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?

  • A. The cross-plant status
  • B. The plant-specific status
  • C. The last restrictive status
  • D. The most restrictive status

正解:D


質問 # 43
What detremines whatherthe planned independent requirements in MRP are consumed by other requrements?

  • A. Requirements type
  • B. Order type
  • C. Requirements profile
  • D. Consumption sequence procedure

正解:A


質問 # 44
Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements?

  • A. Total replenishment lead time
  • B. Planed delivery time
  • C. Operation duration
  • D. In-house production time

正解:B、D


質問 # 45
What are some uses for the low-level code assigned to each material?

  • A. It is used in MRP to determine the sequence in which materials are planned.
  • B. It is used by product costing to determine how coast are rolled up.
  • C. it is used by ATP to determine the priority of alternative components.
  • D. It is used by engineering to indentify subitems in an engineering bill of material (BOM).

正解:A、B


質問 # 46
Which of the following is valid sequence of the main activities in production order processing?

  • A. Creation, availability check, release, material widrawal, confirmation
  • B. Creation, printing, release, goods issue, confirmation, goods receipt
  • C. Creation, release, printing, goods issue, confirmation, goods receipt
  • D. Creation, release, settlement, goods issue, confirmation, goods receipt

正解:A、C


質問 # 47
Which item statuses can you select inside a material BOM?

  • A. Quality management
  • B. Engineering
  • C. Service
  • D. Sales

正解:B、D


質問 # 48
What are the consequences when you assgn a planned order to a production line manually, using the planning table in repetitive manufacturing?

  • A. The planed order is converted to production order.
  • B. The planned order's components are copied to the picking list.
  • C. The planed order generates capacity requirements
  • D. The planed order's component availability is checked.

正解:C


質問 # 49
You want to schedule an operation finitely, without moving other operations. Which scheduing strategy do you select?

  • A. Schedule in working time only
  • B. Squeeze in
  • C. Find slot
  • D. Insert operation

正解:C


質問 # 50
When do you use variant bills of materials (BOMs)?

  • A. When multiple materials also have similar BOMs
  • B. When a material has a configurable BOM
  • C. When a material has multiple BOMs
  • D. When multiple materials have multiple BOMs

正解:D


質問 # 51
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?

  • A. 100% check
  • B. Simultaneous
  • C. By usage probability
  • D. First in first out (FIFO)

正解:A、C


質問 # 52
How can you set up the supply source for the Kanban process in SAP S/4HANA?

  • A. Using purchasing costs for automated source prioritization
  • B. Using quotations for internal and external procurement
  • C. Using stock transfer reservations for stock transfer
  • D. Using purchase orders for external procurement
  • E. Using run schedule quantities for in-house production

正解:C、D、E


質問 # 53
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing?

  • A. Run PP/DS heuristics for repetitive manufacturing.
  • B. Run MRP with automatic selection of production version.
  • C. Assign planned orders manual lying the planning table.
  • D. Run MRP with quota arrangement.

正解:A、D


質問 # 54
Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?

  • A. Assign the alert profile to the overall profile.
  • B. Create object selection variant for transportation lane-related alerts.
  • C. Assign the overall profile to the authorization profile.
  • D. Create object selection variant for product-related alerts.

正解:A、D


質問 # 55
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

  • A. Make-to-order production (20)
  • B. Planning with final assembly (40)
  • C. Planning at assembly level (70)
  • D. Planning without final assembly (50)

正解:D


質問 # 56
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP creates capacity requirements without checking the capacity of a work center.
  • B. MRP creates capacity requirements only if the work center has sufficient capacity.
  • C. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • D. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.

正解:A


質問 # 57
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.

  • A. Finiteness level
  • B. Scheduling control
  • C. Direction
  • D. Fixed pegging
  • E. Planning mode

正解:B、C、E


質問 # 58
You set up a material as a phantom assembly by entering the special procurement key in the material master.
How can you switch off the phantom assembly in a specific bill of material (BOM)?

  • A. Change the explosion type of the phantom assembly in the BOM.
  • B. Change the special procurement key of the phantom assembly in the BOM.
  • C. Change the phantom item indicator for the phantom assembly in the BOM.
  • D. Change the item category of the phantom assembly in the BOM.

正解:A


質問 # 59
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?

  • A. Fill up to the reorder stock level
  • B. Fill up based on the lot size procedure
  • C. Fill up to the safety stoc level
  • D. Fill up to the maximum stock level

正解:B


質問 # 60
Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. WBS item
  • B. Non-stock item
  • C. Variable-size item
  • D. Work item

正解:B、C


質問 # 61
You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

  • A. Production order release
  • B. Backflushing
  • C. Material requirements planning
  • D. Kanban

正解:C


質問 # 62
What does forecasting in demand planning cycle include?

  • A. Past procurment quantities
  • B. Past sales order quantites
  • C. Past quotation quantities
  • D. One-off events
  • E. Market intelligence

正解:B、D、E


質問 # 63
Your quality department detect a deviation in a raw material batch. Unfortunately, this batch has already been used in producion. How can you indentify all affected finish goods stocks?

  • A. Use the material staging report.
  • B. Use batch determination.
  • C. Use the batch information cockpit.
  • D. Use the material where-used report.

正解:C


質問 # 64
In the Schedule Production app which setting can you make for the planning strategy?

  • A. Fitness level
  • B. Scheduling control
  • C. Direction
  • D. Fixed pegging
  • E. Planning mode

正解:B、C、E


質問 # 65
During production order creation, several valid production versions are found. How does the system choose the production version?

  • A. Planned order or material number
  • B. Alphanumeric or quota arrangement
  • C. Valid period or sale order
  • D. Lot size or material cost

正解:B


質問 # 66
......

最新C_TS422_2021テスト問題集を試そう!更新されたSAP試験が合格できます:https://www.passtest.jp/SAP/C_TS422_2021-shiken.html

検証済み!C_TS422_2021問題集と解答でC_TS422_2021テストエンジン正確解答付き:https://drive.google.com/open?id=18q0vv599IJPRh3u4Ftw2Lh22qIbLDjTe