
C_TS422_2021試験問題集を使って一日でSAP Certified Application Associate試験合格目指す(最新の82解答)
C_TS422_2021試験正確な問題集、学習ノートと理論
SAP C-TS422-2021認証試験は世界的に認識されており、認定保有者は雇用市場で需要が高くなっています。この認定は、生産プランナー、製造管理者、サプライチェーンコンサルタントなど、専門家にさまざまなキャリアの機会を開きます。雇用主は、個人が高いレベルの専門知識を持ち、継続的な専門能力開発にコミットしていることを示すため、SAP認定を重視しています。
SAP C_TS422_2021 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
| トピック 5 |
|
質問 # 11
Your quality department detect a deviation in a raw material batch. Unfortunately, this batch has already been used in producion. How can you indentify all affected finish goods stocks?
- A. Use the batch information cockpit.
- B. Use the material where-used report.
- C. Use the material staging report.
- D. Use batch determination.
正解:A
質問 # 12
How would you define pegging in the context of Advanced Planning?
- A. An evaluation to verify if there are material or capacity shortages in the network after the production planning run.
- B. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements
- C. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements
- D. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run
正解:C
質問 # 13
Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. Non-stock item
- B. Variable-size item
- C. WBS item
- D. Work item
正解:A、B
質問 # 14
What could be the reason for multiple commitment of invidula capacities, where several operations have the same scheduled dates on a work center (or resource) after planing?
- A. The Change Planning Direction indicator is set in strategy profile.
- B. Alternative work centers are fully occupied.
- C. The finite Scheduling indicator is NOT set in the strategy profile.
- D. The work center has several invidula capacities.
正解:C、D
質問 # 15
What type of time element can be reduced by strategy settings while dispatching?
- A. Transportation time
- B. Setup time
- C. Wait time
- D. Queue time
正解:C、D
質問 # 16
You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched. How does the insertion take place?
- A. The previously dispatched operation stays as is; the new operation is inserted after the the dispatched operation.
- B. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
- C. The previously dispatched operation stays as is; the new operation is inserted before the the dispatched operation.
- D. The new operation is inserted at the desired time; the previously dispatched operation is moved backward.
正解:D
質問 # 17
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
- A. Fill up based on the lot size procedure
- B. Fill up to the reorder stock level
- C. Fill up to the safety stoc level
- D. Fill up to the maximum stock level
正解:A
質問 # 18
You need to model goods receipt processing time in detailed scheduling. Whic modeling options do you have?
- A. Model a handling resource in the location master and goods receipt time in the material master.
- B. Model a resource inbound in the location master.
- C. Model a seperate resource in the production data structure.
- D. Model a transportation resorce in the location master.
正解:A、D
質問 # 19
When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?
- A. The cross-plant status
- B. The last restrictive status
- C. The most restrictive status
- D. The plant-specific status
正解:C
質問 # 20
How can you carry out cost object controlling for production orders?
- A. Milestone-related
- B. Product-related
- C. Order-related
- D. Cost-related
正解:B、C
質問 # 21
You want to use capacity availability checks for production orders. Which settings have to be made for this?
- A. An overall profile must be assigned in the checking control.
- B. The PRT Availability Check must be set in the checking control.
- C. A checking rule must be assigned in the checking control
- D. The Relevant for Finite Scheduling indicator must be set
正解:A、D
質問 # 22
Why would you use phantom assemblies?
- A. To make the assignment of components easier
- B. To reduce the number of changes required in bills of materials
- C. To increase the number of planning levels
- D. To reduce the number of material masters
- E. To simplify the structure of bills of materials
正解:A、B、E
質問 # 23
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
- A. First in first out (FIFO)
- B. By usage probability
- C. 100% check
- D. Simultaneous
正解:B、C
質問 # 24
What happens to this dependent requirement when you convert the planned order into a production order?
- A. They are converted into a production order.
- B. They are converted into a schedule line.
- C. They are converted into a reservation.
- D. They are converted into a planned order.
正解:C
質問 # 25
What is a work center hierarchy in planning in SAP S/4HANA?
- A. A group of work centers in a parallel sequence that is used to split production quantities and work on them in parallel
- B. A group of alternative work centers for production, structured in hierarchy levels by priorities
- C. A group of work centers in a production line being used in sequence for production
- D. A group of alternative work centers providing a cumulative available capacity for production.
正解:D
質問 # 26
......
SAP C_TS422_2021試験は、80の複数選択肢と複数回答問題から構成されています。試験時間は180分で、合格スコアは64%です。試験は英語と日本語で利用可能です。
C_TS422_2021問題集PDFで最速合格希望C_TS422_2021:https://www.passtest.jp/SAP/C_TS422_2021-shiken.html
100% 高得点合格保証C_TS422_2021無制限82解答:https://drive.google.com/open?id=1MaCZkglwIIUeqbs7DbYwaFc9joLBpc70