質問 48
Which statement is correct about the SAP Fiori tile group? Note: There are 2 correct Answers to this question.
- A. It can be assigned directly to the user via personalization.
- B. It provides only SAPUI5-based apps.
- C. It is based on an SAP Fiori tile catalog.
- D. It is assigned via a portal role.
正解: B,C
質問 49
Which of the following statements about orders with operation account assignment (OAA) are correct?
Note: There are 3 correct Answers to this question.
- A. The settlement rule is maintained on the header level.
- B. A technical object must be assigned to an order operation.
- C. Overall costs are dynamically summed up on the header level.
- D. Purchase requisitions have the operation as account assignment.
- E. Costs are stored only for the operation object.
正解: B,C,E
質問 50
You are analyzing the data transfer of the cost center of a piece of equipment. What are the possible data origins? Note: There are 2 correct Answers to this question.
- A. The reference functional location of the superior functional location
- B. The individual maintenance of the cost center in the equipment master record
- C. The cost center of the superior equipment
- D. The cost center of the related maintenance work center
正解: B,C
質問 51
What can you assign in a notification item? Note: There are 2 correct Answers to this question.
- A. Only one cause of damage
- B. One or more object parts
- C. One or more causes of damage
- D. Only one object part
正解: B,C
質問 52
Which statements are correct about UI technologies in SAP S/4HANA Asset Management? Note: There are 2 correct Answers to this question.
- A. SAP GUI transactions can be used in the SAP Fiori launchpad.
- B. SAP Fiori launchpad supports only SAPUI5 apps.
- C. Web Dynpro apps can be used in the SAP Fiori launchpad.
- D. The cloud version can also use SAP GUI for Windows.
正解: B,C
質問 53
Which parameter in the material master is a prerequisite for refurbishment?
- A. Valuation category C (condition-based)
- B. Valuation class 8000
- C. Valuation type H (origin)
- D. Valuation category B (in-house/external procurement)
正解: A
質問 54
Which functionalities belong to the current portfolio of SAP BusinessObjects Business Intelligence?
Note: There are 2 correct Answers to this question.
- A. Plant Maintenance Information Systems (PMIS)
- B. SAP QuickViewer
- C. SAP Crystal Reports
- D. SAP Lumira
正解: C,D
質問 55
Which statement is correct when planning maintenance work that is to be carried out by an external company?
- A. In the control key assigned to the order operation, the "Service" indicator must always be activated.
- B. If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.
- C. If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system.
- D. A service master record must always be assigned to the external order operation.
正解: B
質問 56
How does a performance-based maintenance plan calculate the interval between start date and planned date?
- A. Cycle length divided by annual performance
- B. Cycle length divided by (annual performance / 365)
- C. Cycle length divided by monthly performance
- D. Cycle length divided by ((scheduling period) x (cycle modification factor))
正解: B
質問 57
Which of the following objects can you directly assign when you define the work center? Note: There are 2 correct Answers to this question.
- A. Fixed price of the activity type
- B. Capacity category
- C. Calculation key
- D. Organizational unit (HR)
正解: B,D
質問 58
How does the work center influence cost calculation in the maintenance order? Note: There are 2 correct Answers to this question.
- A. Via cost center and activity type
- B. Via activity type and hourly rate
- C. Via business partner and hourly price
- D. Via organizational unit and personal hourly rate
正解: A,B
質問 59
Which SAP UI technology is used for the Report and Repair Malfunction app?
- A. SAP GUI for Windows
- B. Web Dynpro
- C. SAPUI5
- D. SAP GUI for HTML
正解: B
質問 60
Which functions are available in the Resource Scheduling for Maintenance Planners app? Note: There are 2 correct Answers to this question.
- A. Monitor maintenance order operations due in the next 4 weeks.
- B. Schedule and dispatch maintenance operations by shifts.
- C. Cancel dispatched maintenance order operations.
- D. Print job papers from a maintenance order.
正解: A,C
質問 61
You want to see historical information relating to the phases when equipment was installed at a functional location. Where can you find this information?
- A. Object Statistics
- B. Usage List
- C. Structure Display
- D. Location Analysis List
正解: B
質問 62
Which parameter in a maintenance strategy do you use to set the start/end date of the maintenance order?
- A. Package offset
- B. Scheduling type
- C. Initial/subsequent buffer
- D. Call horizon
正解: C
質問 63
In which component do you have to perform most of the configuration to set up SAP Asset Manager?
- A. SAP ERP on HANA
- B. SAP BTP (formerly Cloud Platform)
- C. SAP Mobile Platform
- D. SAP S/4HANA
正解: B
質問 64
Which of the following statements are correct for SAP S/4HANA Cloud - Asset Management? Note:
There are 2 correct Answers to this question.
- A. You have access to the SAP S/4HANA back-end system.
- B. You can configure SAP S/4HANA Cloud via the SAP Asset Intelligence Network.
- C. You do NOT have access to the SAP S/4HANA back-end system.
- D. You can configure SAP S/4HANA Cloud via the self-service configuration UI.
正解: C,D
質問 65
Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)?
Note: There are 3 correct Answers to this question.
- A. Assign a production resource tool (PRT) to the operation.
- B. Verify planned and actual costs.
- C. Find malfunction records already created in a list.
- D. Plan repair work for the responsible work center.
- E. Complete the malfunction report.
正解: C,D,E
質問 66
You want to display vehicle-specific data for a piece of equipment. How do you proceed?
- A. Assign a view profile to an equipment category for fleet equipment.
- B. Assign a view profile to the combination of fleet object type and equipment category.
- C. Assign a view profile to the combination of equipment category and vehicle class.
- D. Define the field selection for the vehicle equipment master data.
正解: B
質問 67
You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note:
There are 2 correct Answers to this question.
- A. Scheduling period
- B. Counter overflow reading
- C. Estimated annual performance
- D. Start counter reading
正解: C,D
質問 68
Which of the following is a prerequisite for external refurbishment?
- A. Define the order type for external refurbishment.
- B. Select the material group for externally refurbished materials.
- C. Create the purchasing info record for the external provider.
- D. Activate the subcontracting indicator in an external activity.
正解: D
質問 69
The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? Note: There are 2 correct Answers to this question.
- A. All open reservations are closed when the maintenance order is set to TECO.
- B. Reservations are created only after a material availability check has been performed.
- C. For the combination of order type and planner group, you can decide when reservations are created.
- D. Open reservations can be cleared when a maintenance order operation is finally confirmed.
正解: A,D