質問 27
Which statements related to the creation of maintenance orders are correct? Note: There are 2 correct Answers to this question.

  • A. The long text of the reference notification can be automatically copied as the long text of the order.
  • B. The document within the document management system can be assigned only at operational level.
  • C. The assignment of the header notification to an order CANNOT be deleted.
  • D. When an order is created based on a single notification, this notification becomes the header notification.

正解: A,D

 

質問 28
You are analyzing the data transfer of the cost center of a piece of equipment. What are the possible data origins? Note: There are 2 correct Answers to this question.

  • A. The reference functional location of the superior functional location
  • B. The individual maintenance of the cost center in the equipment master record
  • C. The cost center of the superior equipment
  • D. The cost center of the related maintenance work center

正解: B,C

 

質問 29
You have created a new equipment category, "linear", with the corresponding view profile. Which fields appear in the equipment linear data tab? Note: There are 3 correct Answers to this question.

  • A. Segment
  • B. Object network
  • C. Unit of measure
  • D. Start marker
  • E. Type of offset

正解: C,D,E

 

質問 30
You require stock material to carry out maintenance tasks. Which of the following statements regarding material planning in the maintenance order are correct? Note: There are 3 correct Answers to this question.

  • A. Material can be assigned at the order operation level.
  • B. A control key for internal workforce is required when assigning stock material to an order operation.
  • C. A goods receipt can be entered for a technically completed maintenance order.
  • D. The pick list for materials can be printed before order release.
  • E. Material can be assigned at the order header level.

正解: A,B,C

 

質問 31
Which of the following are standard functionalities of SAP Asset Manager? Note: There are 3 correct Answers to this question.

  • A. Work orders and operations
  • B. Cost analytics
  • C. Technical objects
  • D. ESRI maps
  • E. Breakdown analytics

正解: A,C,D

 

質問 32
In which component do you have to perform most of the configuration to set up SAP Asset Manager?

  • A. SAP ERP on HANA
  • B. SAP BTP (formerly Cloud Platform)
  • C. SAP Mobile Platform
  • D. SAP S/4HANA

正解: B

 

質問 33
What can be determined using the offset within a maintenance strategy?

  • A. The basic start date of the maintenance order
  • B. The scheduled start date of the maintenance order
  • C. The first due date of a maintenance package
  • D. The call date for the maintenance order

正解: C

 

質問 34
Which of the following statements about SAP Asset Manager are true? Note: There are 3 correct Answers to this question.

  • A. SAP Asset Manager is available for SAP S/4HANA and SAP ERP.
  • B. SAP Asset Manager can be used offline.
  • C. SAP Asset Manager can run on smart watches.
  • D. SAP Asset Manager provides single sign-on functionality.
  • E. SAP Asset Manager is available only for the iOS platform.

正解: A,C,D

 

質問 35
Which steps are available for the maintenance technician when using the Report Malfunction tile? Note:
There are 3 correct Answers to this question.

  • A. View details of the technical object by navigating to the Asset Viewer.
  • B. Input estimated costs for repair malfunction.
  • C. Select and print the maintenance order shop papers.
  • D. Display the current location of the technical object.
  • E. Add a URL to provide further information.

正解: A,D,E

 

質問 36
What is the correct receiver object type for the settlement of a refurbishment order?

  • A. The cost center
  • B. The material
  • C. The fixed asset
  • D. The WBS element

正解: B

 

質問 37
Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)?
Note: There are 3 correct Answers to this question.

  • A. Assign a production resource tool (PRT) to the operation.
  • B. Verify planned and actual costs.
  • C. Find malfunction records already created in a list.
  • D. Plan repair work for the responsible work center.
  • E. Complete the malfunction report.

正解: C,D,E

 

質問 38
Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 3 correct Answers to this question.

  • A. Lock or unlock the order.
  • B. Change the settlement rule.
  • C. Update the estimated costs.
  • D. Create an invoice receipt for delivered materials.
  • E. Change the planned costs.

正解: A,B,D

 

質問 39
What do you need to configure to enable entries in the action log of a piece of equipment?

  • A. Define the corresponding history-related field for the equipment reference category.
  • B. Define an additional business view for the equipment category.
  • C. Activate the change documents for the equipment category.
  • D. Select the time segment check box for the equipment category.

正解: C

 

質問 40
Which parameter in the material master is a prerequisite for refurbishment?

  • A. Valuation category C (condition-based)
  • B. Valuation class 8000
  • C. Valuation type H (origin)
  • D. Valuation category B (in-house/external procurement)

正解: A

 

質問 41
How do you set up the visible tiles for a specific user in SAP Fiori launchpad? Note: There are 2 correct Answers to this question.

  • A. By assigning a portal role with an SAP Fiori catalog
  • B. By assigning a PFCG role with an SAP Fiori catalog
  • C. By assigning the tiles directly
  • D. By assigning a PFCG role with an SAP Fiori tile group

正解: B,D

 

質問 42
What happens if you change the primary key of a functional location?

  • A. The user must define a new labelling system for the new primary key.
  • B. The functional location is immediately assigned to a new superior functional location when the new label is entered.
  • C. The user must decide whether the functional location is assigned to a new superior functional location.
  • D. Changing the superior functional location via alternative labeling is not possible.

正解: B

 

質問 43
Which of the following statements about orders with operation account assignment (OAA) are correct?
Note: There are 3 correct Answers to this question.

  • A. The settlement rule is maintained on the header level.
  • B. A technical object must be assigned to an order operation.
  • C. Overall costs are dynamically summed up on the header level.
  • D. Purchase requisitions have the operation as account assignment.
  • E. Costs are stored only for the operation object.

正解: B,C,E

 

質問 44
The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? Note: There are 2 correct Answers to this question.

  • A. All open reservations are closed when the maintenance order is set to TECO.
  • B. Reservations are created only after a material availability check has been performed.
  • C. For the combination of order type and planner group, you can decide when reservations are created.
  • D. Open reservations can be cleared when a maintenance order operation is finally confirmed.

正解: A,D

 