質問 27
Which statements related to the creation of maintenance orders are correct? Note: There are 2 correct Answers to this question.
- A. The long text of the reference notification can be automatically copied as the long text of the order.
- B. The document within the document management system can be assigned only at operational level.
- C. The assignment of the header notification to an order CANNOT be deleted.
- D. When an order is created based on a single notification, this notification becomes the header notification.
正解: A,D
質問 28
You are analyzing the data transfer of the cost center of a piece of equipment. What are the possible data origins? Note: There are 2 correct Answers to this question.
- A. The reference functional location of the superior functional location
- B. The individual maintenance of the cost center in the equipment master record
- C. The cost center of the superior equipment
- D. The cost center of the related maintenance work center
正解: B,C
質問 29
You have created a new equipment category, "linear", with the corresponding view profile. Which fields appear in the equipment linear data tab? Note: There are 3 correct Answers to this question.
- A. Segment
- B. Object network
- C. Unit of measure
- D. Start marker
- E. Type of offset
正解: C,D,E
質問 30
You require stock material to carry out maintenance tasks. Which of the following statements regarding material planning in the maintenance order are correct? Note: There are 3 correct Answers to this question.
- A. Material can be assigned at the order operation level.
- B. A control key for internal workforce is required when assigning stock material to an order operation.
- C. A goods receipt can be entered for a technically completed maintenance order.
- D. The pick list for materials can be printed before order release.
- E. Material can be assigned at the order header level.
正解: A,B,C
質問 31
Which of the following are standard functionalities of SAP Asset Manager? Note: There are 3 correct Answers to this question.
- A. Work orders and operations
- B. Cost analytics
- C. Technical objects
- D. ESRI maps
- E. Breakdown analytics
正解: A,C,D
質問 32
In which component do you have to perform most of the configuration to set up SAP Asset Manager?
- A. SAP ERP on HANA
- B. SAP BTP (formerly Cloud Platform)
- C. SAP Mobile Platform
- D. SAP S/4HANA
正解: B
質問 33
What can be determined using the offset within a maintenance strategy?
- A. The basic start date of the maintenance order
- B. The scheduled start date of the maintenance order
- C. The first due date of a maintenance package
- D. The call date for the maintenance order
正解: C
質問 34
Which of the following statements about SAP Asset Manager are true? Note: There are 3 correct Answers to this question.
- A. SAP Asset Manager is available for SAP S/4HANA and SAP ERP.
- B. SAP Asset Manager can be used offline.
- C. SAP Asset Manager can run on smart watches.
- D. SAP Asset Manager provides single sign-on functionality.
- E. SAP Asset Manager is available only for the iOS platform.
正解: A,C,D
質問 35
Which steps are available for the maintenance technician when using the Report Malfunction tile? Note:
There are 3 correct Answers to this question.
- A. View details of the technical object by navigating to the Asset Viewer.
- B. Input estimated costs for repair malfunction.
- C. Select and print the maintenance order shop papers.
- D. Display the current location of the technical object.
- E. Add a URL to provide further information.
正解: A,D,E
質問 36
What is the correct receiver object type for the settlement of a refurbishment order?
- A. The cost center
- B. The material
- C. The fixed asset
- D. The WBS element
正解: B
質問 37
Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)?
Note: There are 3 correct Answers to this question.
- A. Assign a production resource tool (PRT) to the operation.
- B. Verify planned and actual costs.
- C. Find malfunction records already created in a list.
- D. Plan repair work for the responsible work center.
- E. Complete the malfunction report.
正解: C,D,E
質問 38
Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 3 correct Answers to this question.
- A. Lock or unlock the order.
- B. Change the settlement rule.
- C. Update the estimated costs.
- D. Create an invoice receipt for delivered materials.
- E. Change the planned costs.
正解: A,B,D
質問 39
What do you need to configure to enable entries in the action log of a piece of equipment?
- A. Define the corresponding history-related field for the equipment reference category.
- B. Define an additional business view for the equipment category.
- C. Activate the change documents for the equipment category.
- D. Select the time segment check box for the equipment category.
正解: C
質問 40
Which parameter in the material master is a prerequisite for refurbishment?
- A. Valuation category C (condition-based)
- B. Valuation class 8000
- C. Valuation type H (origin)
- D. Valuation category B (in-house/external procurement)
正解: A
質問 41
How do you set up the visible tiles for a specific user in SAP Fiori launchpad? Note: There are 2 correct Answers to this question.
- A. By assigning a portal role with an SAP Fiori catalog
- B. By assigning a PFCG role with an SAP Fiori catalog
- C. By assigning the tiles directly
- D. By assigning a PFCG role with an SAP Fiori tile group
正解: B,D
質問 42
What happens if you change the primary key of a functional location?
- A. The user must define a new labelling system for the new primary key.
- B. The functional location is immediately assigned to a new superior functional location when the new label is entered.
- C. The user must decide whether the functional location is assigned to a new superior functional location.
- D. Changing the superior functional location via alternative labeling is not possible.
正解: B
質問 43
Which of the following statements about orders with operation account assignment (OAA) are correct?
Note: There are 3 correct Answers to this question.
- A. The settlement rule is maintained on the header level.
- B. A technical object must be assigned to an order operation.
- C. Overall costs are dynamically summed up on the header level.
- D. Purchase requisitions have the operation as account assignment.
- E. Costs are stored only for the operation object.
正解: B,C,E
質問 44
The planner adds stock materials in the maintenance order. Which statements regarding reservations in maintenance orders are correct? Note: There are 2 correct Answers to this question.
- A. All open reservations are closed when the maintenance order is set to TECO.
- B. Reservations are created only after a material availability check has been performed.
- C. For the combination of order type and planner group, you can decide when reservations are created.
- D. Open reservations can be cleared when a maintenance order operation is finally confirmed.
正解: A,D
質問 45
......