質問 56
A critical program for a company fails lo delivers its intended benefits. The CEO and program sponsor are both held accountable and. ultimately, their employment is terminated by the board of directors What should the program manager do before formally closing the program?
- A. Update the benefits register
- B. Establish a program management information system (PMIS)
- C. Transfer all program documentation to the deputy program manager
- D. Share lessons learned with an program team members
正解: D
質問 57
What is the MINIMUM distance from the edge of a pool or other water hazards for a weatherproof enclosure?
- A. 4 m (13 ft)
- B. 10 m (30 ft)
- C. 6 m (20 ft)
- D. 1 m (3 ft)
- E. 2 m (7 ft)
正解: C
質問 58
An ICT distribution designer is representing a client during a project execution. What is the designer's role in the Vendor and Contractor Coordination?
- A. lf specific questions arise regarding coordination of the installation with structural, architectural, and site conditions and work between trades, submit RFIs to the GC with appropriate documentation to demonstrate the concern along with the proposed installation.
- B. Oversee the sequence of the work and ensure that the job proceeds as anticipated in accordance with the project execution schedule
- C. Holds two critical meetings to begin the project and allow all parties to introduce themselves The first meeting usually is conducted with the owner and design team, and the second meeting is with the field personnel and subcontractors
- D. Synchronizes the daily activities of all trades through daily or weekly meetings (depending on project size, complexity, or criticality) with individual trade PMs. Fore people, supervisors and designers as necessary
正解: A
質問 59
An initiative involves the development of new technology and leverages existing technologies It is determined critical by the program governance board and the program sponsor that a comprehensive risk management plan be put in place. In what phase is the nsk management plan created?
- A. Program definition
- B. Program execution management
- C. Program risk management planning
- D. Program delivery
正解: A
質問 60
How many classes of telecommunications administration are there?
- A. 0
- B. 1
- C. 2
- D. 3
正解: A
質問 61
The program manager plans to address a negative cost variance generating a red flag in the program management status report. What should the program manager do?
- A. Gather all the details, analyze impacts, determine corrective actions and present the findings to the governance board for direction
- B. Ask the program team to compile all details, analyze impacts, determine corrective actions and present to the governance board for direction
- C. Work with program sponsor to compile impact analysis data to obtain additional funding for the program
- D. Contact the project sponsors to present the details, impacts, and possible corrective actions regarding the negative cost variance
正解: A
質問 62
A program manager takes over a global program from another program manager. Upon arriving on-site, the program manager immediately sees that stakeholders are upset because of a lack of updates and communications about the program.
What should the program manager do first?
- A. Notify the executive sponsor and update the program issue tog
- B. Review the stakeholder engagement plan and stakeholder matrix
- C. Review the program governance plan and communication log
- D. Review the program communications management plan and stakeholder register
正解: D
質問 63
A program manager needs to establish direction and identity the essential aspects of a program. In addition, they must ensure that the context and framework of the program are properly defined assessed and documented Which document will be created to support this activity?
- A. Program master schedule
- B. Program resource management plan
- C. Program management plan
- D. Program scope statement
正解: D
質問 64
The customer of a three-year program does not want to receive any intermediate details on the program. The program appears to be in trouble and the customer is concerned about a new system's cost. The program manager has provided monthly performance reports throughout the program's lite cycle.
Which of the following would the customer be interested in reviewing?
- A. Estimate to complete
- B. Original cost baseline
- C. Cost performance index
- D. Estimate at completion
正解: D
質問 65
A program to implement a new payroll processing system at a healthcare company is nearing completion and is under budget. What should the program manager do next?
- A. Request permission from the program governance board to initiate program closure activities
- B. Present additional opportunities to the program sponsor
- C. Apply the remaining budget to deferred enhancement requests
- D. Apply the remaining budget to operational activities
正解: A
質問 66
A program manager is responsible for constructing a USS50 million building Management suggests it will take three years to complete The program manager can select a design-build option to optimize the construction schedule to 1 5 years However heavy demand for steel is causing price increases and delivery delays. II this trend continues, it could take as long as 4.5 years to complete construction. You learn that a new technology can yield a definitive delivery schedule of 1 25 years What is the expected time of delivery?
- A. 1 50 years
- B. 1 00 years
- C. 175 years
- D. 1.25 years
正解: D
質問 67
A company's marketing department Tails an internal compliance audit To comply with the auditor's remediation plan the legal department mandates that a content management system (CMS) be implemented After initiating the program for CMS implementation the program manager discovers that the marketing department has already preselected which CMS technology will be implemented.
What should the program manager do to ensure the success of the program?
- A. Host a kick-off meeting, request preliminary requirements from the marketing department, conduct a design session present the steering committee with a solution that meets the requirements: and meet with interested vendors
- B. Initiate the program and begin a formal request for proposal (RFP) to validate the chosen solution and gam the confidence of the legal department
- C. Meet with the vice president of purchasing to discuss the risks associated with preselecting a solution before the requirements have been gathered
- D. Ask a senior marketing executive to act as the program sponsor and participate on the steering committee: require steering committee representation from the IT legal, and other key departments, validate that the chosen solution meets the requirements
正解: A
質問 68
In a design type Scope of Work (SoW) the ICT distribution designer is responsible for providing
- A. specific products and materials
- B. a safety plan
- C. a user needs analysis
- D. stakeholder requirements
正解: A
質問 69
An organization must accelerate a product to market. The program manager completes the preliminary program slaps and holds a kick-off meeting Project managers submit their preliminary schedules for review What should the program manager do next?
- A. Work with the project managers to refine the project schedules and deliverables to align with the program milestones
- B. Integrate the project schedules into the program schedule and report the revised delivery date to the project managers
- C. Revise the project schedules to meet the program schedule and communicate to stakeholders
- D. Assign resources lo the schedule and report the revised delivery date to the project managers
正解: C
質問 70
The program sponsor requests a weekly performance report. The tools and techniques to monitor and control program performance include which of the following?
- A. Interviewing, SWOT analysis, run chart and matrix-based charts
- B. Earned value management financial reporting systems, performance measurement techniques and program management information systems
- C. Delphi technique, scatter diagram. Pareto chart, and organization charts
- D. Program management performance variances business criteria reweighting, root cause identification, and statistical sampling
正解: B
質問 71
An aircraft manufacturer is engaged by an airline to build a fleet of new airliners. The program charter has been approved but the stakeholders are concerned that the delivery method of the program may not meet their expectations Using the program master schedule what will the program manager incorporate to align the program with the expectations of the stakeholders?
- A. PWBS, benefits management plan, and program financial management plan
- B. Program work breakdown structure (PWBS) program scope statement, and benefits management plan
- C. Program scope statement benefits management plan, and program financial management plan
- D. Program charter PWBS, and program scope statement
正解: B
質問 72
A program manager for the construction of an international event venue that will impact the local community needs to determine the best approach for communications. One of the conditions of the program is that after the event takes place a park will be built for the community's use.
What should the program manager do to ensure community support?
- A. Ensure community representatives are part of the steering committee
- B. Negotiate the program scope with community representatives
- C. Organize an advocacy group and facilitate community engagement
- D. Review the scope with the program sponsor and community representatives
正解: C
質問 73
What should a program manager do to ensure that the program meets the organization's strategic goals?
- A. Assess the program reports
- B. Analyze the benefits management plan
- C. Engage the program steering committee
- D. Manage the program delivery phase
正解: B
質問 74
Which of the following is a consideration for lighting telecommunication spaces?
- A. To ensure worker safety within TEs. Light level requirements are higher tor these than other spaces
- B. The lighting layout shall be coordinated with the equipment and pathway locations
- C. The electrical power for lighting shall be connected to the same electrical panel as the telecommunications equipment.
- D. The light fixtures within telecommunications spaces shall be fluorescent type fixtures.
正解: B
質問 75
For the MAXIMUM flexibility of a cabling system in a hierarchical star topology, ALL backbone cables and links to FR's should be terminated at the
- A. TR
- B. HC (FD).
- C. MC (CD)
- D. IC (BD).
正解: C