
[2025年02月20日] 最新をゲットせよ!C_S43_2023認定練習テスト問題と試験問題集
リアルC_S43_2023試験問題集解答で有効なC_S43_2023問題集PDF
質問 # 48
You want to create a new functional location.
Which setting is part of the Customizing for the functional location category? Note: There are 3 correct answers to this question.
- A. Status profile
- B. Warranty category
- C. Usage period
- D. Object information
- E. Measuring point category
正解:A、D、E
解説:
Technical Objects
質問 # 49
Which of the following objects can you directly assign when you define the work center?
Note: There are 2 correct answers to this question.
- A. Capacity category
- B. Planner group
- C. Calculation key
- D. Organizational unit (HR)
正解:A、D
解説:
Topic: 6
Managing Clean Core
質問 # 50
You want to create a single-cycle plan with a cycle of 12 months. You use the scheduling indicator Time - key date.
The orders should be called 3 months before the planned date.
How can you set up the maintenance plan?
Note: There are 2 correct answers to this question.
- A. Set the call horizon to 25%.
- B. Set the call horizon to 75%.
- C. Set the offset to 3 months.
- D. Set the call horizon to 90 days.
正解:A
解説:
Preventive Maintenance
質問 # 51
What are characteristics of the Preparation and Scheduling phase within phase-based maintenance?
Note: There are 2 correct answers to this question.
- A. The order moves to the Preparation phase once it is approved and released.
- B. Maintenance Planning Buckets give you a list of non-approved notifications.
- C. If you use the Resource Scheduling apps, you always dispatch orders and operations.
- D. The configuration of the order type decides whether you use Resource Scheduling or not.
正解:A、C
解説:
Maintenance Processing - Advanced Functions
質問 # 52
What do you have to consider when setting up phase-based maintenance?
- A. It is not possible to configure the nine delivered phases.
- B. It comes preconfigured when using the relevant Best Practices scope items.
- C. It is mandatory for breakdown and preventive maintenance.
- D. It can be used with any existing order type.
正解:A
解説:
Phase-based maintenance is a new concept introduced in SAP S/4HANA Cloud that allows you to track the life cycle of the maintenance processes using nine predefined phases and sub-phases. These phases are set up by SAP and you cannot change them. However, you can control the transition of phases using phase control codes. Phase-based maintenance is only applicable to the new order types Reactive Maintenance and Proactive Maintenance,which are delivered with the relevant Best Practices scope items. It is not mandatory for breakdown and preventive maintenance, nor can it be used with any existing order type. References: New Phase Model for the Maintenance Processes in S/4HANA Cloud, Phase Model for the Maintenance Process, Maintenance Process Phases, Explaining the Phase-based Process
質問 # 53
Which functionalities are available in the SAP Service and Asset Manager (SAP Asset Manager) for a maintenance worker? Note: There are 2 correct answers to this question.
- A. Schedule resources
* Change task list - B. Change BOM
* Create a work order on the ESRI map - C. Display maps
* Display and maintain Technical Objects - D. Confirm time sheets
* Attach documents
正解:C、D
解説:
Topic: 3
Preventive Maintenance
質問 # 54
Which steps support the maintenance technician in the Report and Repair Malfunction app (3 tiles)? Note:
There are 3 correct answers to this question
- A. Plan repair work for the responsible work center
- B. Assign a production resource tool (PRT) to the operation
- C. Find malfunction records already created in a list
- D. Complete the malfunction report
- E. Verify planned and actual costs
正解:A、C、D
解説:
The Report and Repair Malfunction app supports the maintenance technician in the following steps:
* Plan repair work for the responsible work center: The app allows the technician to assign the work items to the work center that is responsible for the repair work. The work center can be a person, a group of persons
質問 # 55
You want to create a single-cycle plan with a cycle of 12 months. You use the scheduling indicator Time-key date. The orders should be called 3 months before the planned date.How can you set up the maintenance plan?
Note: There are 2 correct answers to this question
- A. Set the call horizon to 75%
- B. Set the call horizon to 90 days.
- C. Set the offset to 3 months
- D. Set the call horizon to 25%.
正解:A、B
質問 # 56
Which of the following parameters are available when you define a new maintenance plan category? Note:
There are 3 correct answers to this question.
- A. Order type
- B. Call object
- C. Maintenance activity type
- D. Completion data
- E. Change documents
正解:B、D、E
質問 # 57
Which operations can the responsible person perform after a maintenance order is technically completed?
Note: There are 2 correct answers to this question.
- A. Update the estimated costs
- B. Change the planned costs
- C. Change the settlement rule
- D. Lock or unlock the order
正解:C、D
解説:
Maintenance Processing - Basic Functions
質問 # 58
You want to implement SAPUI5 apps in your SAP Fiori Launchpad.
Which are mandatory elements?
Note: There are 2 correct answers to this question.
- A. Transactions
- B. Web Dynpro Apps
- C. Tile Groups
- D. Catalogs
正解:C、D
解説:
User Interface and Mobile Maintenance
質問 # 59
You want to assign components to a General Maintenance Task List.
What are prerequisites for assigning material components to a task list operation? Note: There are 2 correct answers to this question.
- A. Assign a piece of equipment with allocated material BOM to a task list operation.
- B. Assign the header material of a material BOM to the assembly field of the task list header.
- C. Assign the BOM usage for free assignment of material in Customizing.
- D. Assign the header material of a material BOM as assembly to a task list operation.
正解:B、C
解説:
Preventive Maintenance
質問 # 60
The planner adds stock materials in the maintenance order. What are possible options for handling of reservations within a maintenance order? Note: There are 2 correct answers to this question
- A. All open reservations are closed when the maintenance order is set to TECO.
- B. Open reservations can be cleared when a maintenance order operation is finally confirmed.
- C. For the combination of order type and planner group, you can decide when reservations are created
- D. Reservations are created only after a material availability check has been performed
正解:A、B
質問 # 61
How does the work center influence cost calculation in the maintenance order?
Note: There are 2 correct answers to this question.
- A. Via cost center assigned to a personnel number
- B. Via organizational unit and personal hourly rate
- C. Via cost center and activity type
- D. Via activity type and hourly rate
正解:C、D
解説:
Organizational Units and Master Data
質問 # 62
Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question.
- A. Within a maintenance order
- B. In the report Material: Where-Used List
- C. In the list editing (single-level) for maintenance orders
- D. In the material reservation list in inventory management
正解:A、B
解説:
Maintenance Processing - Basic Functions
質問 # 63
Which operations can the responsible person perform after a maintenance order is technically completed?
Note: There are 2 correct answers to this question
- A. Update the estimated costs
- B. Change the planned costs
- C. Change the settlement rule
- D. Lock or unlock the order
正解:C、D
解説:
After a maintenance order is technically completed, the responsible person can perform the following operations1:
* Lock or unlock the order: This prevents or allows further changes to the order data, such as actual costs, settlement rule, or confirmation data.
* Change the settlement rule: This allows the responsible person to adjust the distribution of costs to the relevant receivers, such as cost centers, assets, or orders.
* Post goods movements: This allows the responsible person to record the consumption or return of materials that were used for the maintenance work.
* Enter measurement documents: This allows the responsible person to record the measurement readings of the technical objects that were maintained.
The responsible person cannot perform the following operations after a maintenance order is technically completed1:
* Update the estimated costs: This is only possible before the order is released or during the execution phase.
* Change the planned costs: This is only possible before the order is released or during the execution phase.
* Change the order type: This is only possible before the order is released.
* Change the order status: This is only possible before the order is technically completed or after it is reversed.
Therefore, the correct answers are A and C. References: 1: Maintenance Order Types | SAP Help Portal
質問 # 64
You want to set up a scenario for regular maintenance. The first event should take place after 1 year, after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system?
- A. Package hierarchy
- B. Scheduling indicator
- C. Cycle modification factor
- D. Maintenance package offset
正解:D
解説:
To set up a scenario for regular maintenance, the first event should take place after 1 year, and after that, it is a regular cycle of 6 months, you have to use the maintenance package offset parameter to map this in the system. The maintenance package offset is used to define the time interval between the start of the maintenance plan and the first call date of the maintenance package1. A maintenance package is a set of data that defines the frequency and scope of the maintenance tasks2.
For example, if you want to create a maintenance plan with two maintenance packages, one for annual inspection and one for semi-annual inspection, you can use the following settings:
* Maintenance package 1: Cycle length = 12 months, Offset = 0 months, Scheduling indicator = Time- based
* Maintenance package 2: Cycle length = 6 months, Offset = 12 months, Scheduling indicator = Time- based This means that the first maintenance package will be called at the start of the maintenance plan, and then every 12 months thereafter. The second maintenance package will be called after 12 months from the start of the maintenance plan, and then every 6 months thereafter.
The other parameters that are not relevant for this scenario are:
* Package hierarchy: This is used to define the relationship between different maintenance packages within a maintenance plan. It allows you to create nested or parallel maintenance packages that are dependent on each other3.
* Scheduling indicator: This is used to define the type of scheduling for the maintenance package, such as time-based, performance-based, or condition-based4.
* Cycle modification factor: This is used to modify the cycle length of the maintenance package by a certain percentage or factor5.
References: 1: SAP Help Portal - Maintenance Package Offset 2: SAP Help Portal - Maintenance Package 3: SAP Help Portal - Package Hierarchy 4: SAP Help Portal - Scheduling Indicator 5: SAPHelp Portal - Cycle Modification Factor
質問 # 65
......
C_S43_2023試験問題集でPDF問題とテストエンジン:https://www.passtest.jp/SAP/C_S43_2023-shiken.html
最新C_S43_2023試験問題集には合格保証付きます:https://drive.google.com/open?id=1TzHfTcdCv2Eyy1GoaBSj8xwmtLvz7mXi