質問 # 46
Which views can you assign to an equipment category via a view profile?
Note: There are 2 correct answers to this question.

  • A. Configuration
  • B. Warranty
  • C. Serial data
  • D. Manufacturer data

正解:B、D

解説:
Technical Objects


質問 # 47
You require stock material to carry out maintenance tasks. What do you have to consider regarding material planning in the maintenance order? Note: There are 2 correct answers to this question?

  • A. A goods issue can be entered for planned and unplanned material
  • B. For stock material you always need a reservation
  • C. Material can be assigned at the order header level.
  • D. The pick list for materials can be printed before order release.

正解:A、B

解説:
Material planning in the maintenance order is the process of determining the type, quantity, and availability of the materials required for carrying out the maintenance tasks. There are some considerations regarding material planning in the maintenance order, such as:
* Material can be assigned at the operation level or the sub-operation level, but not at the order header level. This is because the material requirement is linked to the specific work that needs to be done in the order. Therefore, option A is incorrect1.
* For stock material, you always need a reservation to ensure that the material is available when needed.
A reservation is a request to the warehouse to keep a certain amount of material ready for withdrawal at a certain time. Therefore, option B is correct1.
* A goods issue is the physical withdrawal of material from the warehouse. It can be entered for both planned and unplanned material in the maintenance order. Planned material is the material that is specified in the order before the actual execution of the work. Unplanned material is the material that is added to the order during or after the execution of the work. Therefore, option C is correct2.
* The pick list is a document that lists all the materials that are required for a maintenance order. It can be printed after the order release, not before. The order release is the step that confirms that the order is ready to be executed and the materials can be withdrawn from the warehouse. Therefore, option D is incorrect3.
References: 1: Modelling Maintenance Processing - SAP Learning 2: [Manage Maintenance Orders - SAP Help Portal] 3: SAP S/4HANA Asset Management: Plants from a Maintenance ... - SAP PRESS


質問 # 48
You want to display vehicle-specific data for a piece of equipment. How do you proceed?

  • A. Set the relevant flags in Customizing activity "Define Additional Business Views for Equipment Categories".
  • B. Assign a view profile to the combination of vehicle type and equipment category.
  • C. Assign a view profile to the combination of equipment category and vehicle class.
  • D. Assign a view profile to an equipment category for fleet equipment.

正解:B


質問 # 49
To which objects can a personnel number be directly assigned? Note: There are 2 correct answers to this question?

  • A. Business partner
  • B. Maintenance plan
  • C. Work center
  • D. Planner group

正解:A、C

解説:
* A personnel number is a unique identifier for an employee in the SAP system. A personnel number can be directly assigned to the following objects:
* C. Work center. A work center is a location where maintenance activities are performed. A work center can have one or more personnel numbers assigned to it, which represent the employees who work at that location. The personnel numbers can be used for capacity planning, scheduling, and confirmation of maintenance orders1.
* D. Business partner. A business partner is a person or an organization that has a business relationship with the company. A business partner can have one or more roles, such as customer, vendor, or contact person. A personnel number can be assigned to a business partner role, which allows the system to identify the employee who is responsible for the business partner or who acts as a contact person for the business partner2.
* A personnel number cannot be directly assigned to the following objects:
* A. Planner group. A planner group is a group of employees who are responsible for planning and processing maintenance orders. A planner group is assigned to a maintenance order header, but not to a personnel number. A planner group can have one or more work centers assigned to it, which in turn can have personnel numbers assigned to them3.
* B. Maintenance plan. A maintenance plan is a document that defines the frequency and scope of preventive maintenance activities for technical objects. A maintenance plan is assigned to a maintenance item, which contains the technical object and the task list for the maintenance activities. A maintenance plan does not have a direct assignment to a personnel number, but it can have a planner group assigned to it, which can have work centers and personnel numbers assigned to it. References: 1: Work Center 2: Business Partner 3: Planner Group : [Maintenance Plan]


質問 # 50
Which functionalities are available in the SAP Service and Asset Manager (SAP Asset Manager) for a maintenance worker? Note: There are 2 correct answers to this question

  • A. Confirm time sheets
    *Attach documents
  • B. Change BOM
    *Create a work order on the ESRI map
  • C. Schedule resources
    *Change task list
  • D. Display maps
    *Display and maintain technical objects

正解:A、D

解説:
The SAP Service and Asset Manager application enables maintenance workers to perform various tasks related to asset management, such as:
* Confirm time sheets: Maintenance workers can record the time spent on work orders and operations, and submit them for approval. They can also view the status of their time confirmations and edit or delete them if needed. This functionality helps to track the labor costs and efficiency of the maintenance work1.
* Attach documents: Maintenance workers can attach documents, such as photos, videos, audio files, or PDFs, to work orders, notifications, or equipment. This functionality helps to provide additional information or evidence for the maintenance work2.
* Display maps: Maintenance workers can view the location of assets, work orders, or notifications on a map. They can also use the map to navigate to the destination, filter the map items, or switch between different map layers. This functionality helps to improve the spatial awareness and planning of the maintenance work3.
* Display and maintain technical objects: Maintenance workers can view the details of technical objects, such as equipment, functional locations, or linear assets, and perform actions on them, such as creating notifications, work orders, or measurements. They can also edit the technical object data, such as the status, serial number, or manufacturer. This functionality helps to manage the lifecycle and performance of the assets.
The functionalities that are not available in the SAP Service and Asset Manager application for a maintenance worker are:
* Schedule resources: This functionality is available in the SAP S/4HANA Asset Management application, which is a web-based application that supports the planning and scheduling of maintenance work. Maintenance planners and schedulers can use this application to assign resources, such as technicians, tools, or materials, to work orders and operations, and optimize the resource utilization and availability.
* Change task list: This functionality is also available in the SAP S/4HANA Asset Management application, which allows maintenance planners and engineers to create and modify task lists, such as general task lists, equipment task lists, or functional location task lists. Task lists are used to define the sequence of operations and activities for recurring maintenance work.
* Change BOM: This functionality is also available in the SAP S/4HANA Asset Management application, which allows maintenance engineers and technicians to create and change bills of materials (BOMs) for technical objects, such as equipment or functional locations. BOMs are used to list the components and materials that are required for the maintenance work.
* Create a work order on the ESRI map: This functionality is not available in the SAP Service and Asset Manager application, which only supports viewing the existing work orders on the map. To create a work order on the map, the maintenance worker would needto use the SAP Work Manager application, which is another mobile application that integrates with the ESRI ArcGIS platform. The SAP Work Manager application allows the maintenance worker to create a work order by tapping on a map location, and assign the work order to a technician or a crew.
References: 1: SAP Service and Asset Manager User Guide - Maintenance Persona - Time Management 2: SAP Service and Asset Manager User Guide - Maintenance Persona - Attachments 3: SAP Service and Asset Manager User Guide - Maintenance Persona - Maps : [SAP Service and Asset Manager User Guide - Maintenance Persona - Technical Objects] : [SAP S/4HANA Asset Management - Resource Scheduling] : [SAP S/4HANA Asset Management - Task Lists] : [SAP S/4HANA Asset Management - Bills of Material] : [SAP Work Manager User Guide - Creating Work Orders on the Map]


質問 # 51
What are some SAP recommended guiding principles to achieve clean core operations?
Note: There are 3 correct answers to this question.

  • A. Establish release management.
  • B. Integrate clean core practices in the end-to-end value process chain.
  • C. Establish an organizational structure, technical foundation, and transformation methodology for clean core.
  • D. Define roles and responsibilities as part of a process transformation office.
  • E. Establish regular housekeeping tasks and procedures.

正解:B、D、E

解説:
Topic: 7
Maintenance Processing - Basic Functions


質問 # 52
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.

  • A. Start date
  • B. Scheduling indicator
  • C. Scheduling period
  • D. Factory calendar

正解:A、C


質問 # 53
In which maintenance object can you use an activity type? Note: There are 2 correct answers to this question.

  • A. Work center
  • B. Maintenance order operation
  • C. Notification activity
  • D. Maintenance order header

正解:B、D

解説:
Maintenance activity type is a key for the type of maintenance activity provided, such as repairs, shutdowns, regular activities, inspections, and so on. It is used to classify data according to the type of maintenance activity in cost evaluations, for example, total costs or number of orders for each technical object1.
Maintenance activity type can be used in the maintenance order header and the maintenance order operation.
In the maintenance order header, it is used to specify the overall type of maintenance activity for the order. In the maintenance order operation, it is used to specify the type of maintenance activity for each operation within the order. The maintenance activity type in the operation can be different from the one in the header2.
Maintenance activity type cannot be used in the notification activity or the work center. Notification activity is a key for the type of activity performed in response to a notification, such as inspection, repair, or preventive maintenance. It is not related to the maintenance activity type. Work center is a key for the location where an operation is performed, such as a workshop, a laboratory, or a machine. It is also not related to the maintenance activity type.
References: 1: maintenance activity type (PM) (SAP Library - Glossary) 2: maintenance activity type in SAP
- Everything you need to know : notification activity (PM) (SAP Library - Glossary) : work center (SAP Library - Glossary)


質問 # 54
You want to create a new functional location. Which selling is part of the Customizing for the functional location category? Note: There are 3 correct answers to this question

  • A. Measuring point category
  • B. Status profile
  • C. Object information
  • D. Warranty category
  • E. Usage period

正解:A、B、C

解説:
The Customizing for the functional location category includes the following settings: usage period, object information, and status profile.
* The usage period defines the start and end dates of the functional location's usage. It can be used to control the validity of maintenance plans and orders, and to calculate the age of the functional location. You can define the usage period in the Customizing activity Define Functional Location Categories1.
* The object information defines the additional data that can be entered for the functional location, such as manufacturer, construction type, serial number, and equipment number. You can define the object information in the Customizing activity Define Functional Location Categories1.
* The status profile defines the user statuses that can be assigned to the functional location. The user statuses can be used to control the business transactions that are allowed for the functional location, such as creating orders, notifications, or measuring documents. You can define the status profile in the Customizing activity Define Status Profile2.
References: 1: Define Functional Location Categories 2: Define Status Profile


質問 # 55
What do you have to consider when setting up the refurbishment process?

  • A. Assign a stock determination rule to the PM order type.
  • B. Mark the order type for refurbishment in customizing.
  • C. Assign valuation type C to the order type.
  • D. Assign a view profile for refurbishment to the order type.

正解:B

解説:
Maintenance Processing - Advanced Functions


質問 # 56
Which of these are necessary steps of the Inspection Checklist process? Note: There are 2 correct answers to this question

  • A. Generate Inspection Lots assigned to maintenance order headers.
  • B. Link PM task list with assigned inspection point type to a maintenance item.
  • C. Generate Inspection Lols within the checklists view.
  • D. Record the usage decision for an Inspection Lot

正解:C、D

解説:
The inspection checklist process is an end-to-end process from the creation of inspection plans to results recording and follow-up actions in Plant Maintenance. The necessary steps of the inspection checklist process are:
* Generate object lists for the maintenance order, which contain the technical objects to be inspected.
* Generate inspection checklists for the maintenance order, which contain the inspection lots based on the inspection plans assigned to the technical objects.
* Record the inspection results for the inspection characteristics in the inspection lots.
* Record the usage decision for the inspection lots, which determines whether the technical objects are accepted or rejected.
Therefore, option A (Generate Inspection Lots within the checklists view) and option C (Record the usage decision for an Inspection Lot) are correct, while option B (Link PM task list with assigned inspection point type to a maintenance item) and option D (Generate Inspection Lots assigned to maintenance order headers) are not part of the inspection checklist process.
References:
* Explaining Inspection Checklists
* Set up your SAP S/4HANA system for EAM Inspection Checklists


質問 # 57
Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note: There are 3 correct answers to this question?

  • A. Analyze confirmed maintenance orders that have NOT been settled.
  • B. Analyze overdue maintenance orders that have NOT been finally confirmed
  • C. Display approved purchase requisitions for which purchase orders have been generated.
  • D. Display approved purchase requisitions for which NO purchase orders have been generated
  • E. Analyze maintenance orders that are still in planning and have NOT been released.

正解:B、D、E

解説:
The Maintenance Planning Overview app allows the planner to analyze critical factors in a chosen reference period, such as outstanding notifications, maintenance orders, purchase requisitions, and purchase orders. The app displays the data in multiple cards that show the number of objects and their status. The planner can use the default filters or adapt them according to their needs.
The activities that the planner can perform by using the app with the default filters are:
* Display approved purchase requisitions for which NO purchase orders have been generated. This is shown in the card "Purchase Requisitions Not Released" which displays the number of purchase requisitions that have been approved but not converted into purchase orders. The planner can navigate to the list of purchase requisitions and take further actions, such as creating purchase orders or changing the requirement date.
* Analyze overdue maintenance orders that have NOT been finally confirmed. This is shown in the card
"Overdue Orders" which displays the number of maintenance orders that have been released but not completed within the planned end date. The planner can navigate to the list of overdue orders and check the status of the operations, confirmations, and goods movements.
* Analyze maintenance orders that are still in planning and have NOT been released. This is shown in the card "Orders in Planning" which displays the number of maintenance orders that have not been released for execution. The planner can navigate to the list of orders in planning and complete the planning activities, such as assigning task lists, materials, and resources.
The activities that the planner cannot perform by using the app with the default filters are:
* Display approved purchase requisitions for which purchase orders have been generated. This is not shown in any of the cards in the app. The planner can use the app "Manage Purchase Requisitions" to display this information.
* Analyze confirmed maintenance orders that have NOT been settled. This is not shown in any of the cards in the app. The planner can use the app "Maintenance Order Costs Analysis" to display this information.
References:
* SAP S/4HANA : New app in Plant Maintenance (Asset Management) - Maintenance Planning Overview
* Highlights for Asset Management in SAP S/4HANA 2021
* Maintenance Management | SAP Help Portal


質問 # 58
You schedule a Maintenance Service Plan. Which call object is generated?

  • A. Customer Service Order with assigned DIP profile
  • B. Customer Service Order with an external order operation
  • C. Maintenance Order which is linked to a Service Order Item
  • D. Maintenance Order which is linked to a Service Order Header

正解:C

解説:
A Maintenance Service Plan is a type of Maintenance Plan that is used to schedule periodic services for external customers. When a Maintenance Service Plan is scheduled, a Maintenance Service Call is generated, which contains a Customer Service Order Header and a Maintenance Order. The Maintenance Order is linked to a Service Order Item, which represents the serviceable material or asset. The Maintenance Order contains the technical details of the service, such as operations, components, and confirmations. The Service Order Item contains the commercial details of the service, such as pricing, billing, and credit check. The Maintenance Order and the Service Order Item are integrated through the Dynamic Item Processor (DIP), which transfers the costs and revenues between them. References: Maintenance Service Plan and Maintenance Service Order in SAP Help Portal.


質問 # 59
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100%.
Which date is relevant for the calculation of future planned dates if the maintenance work is delayed?

  • A. The date of the final confirmation
  • B. Actual finish date of the maintenance order
  • C. Planned date of the next call, independent of maintenance order dates
  • D. Technical completion date of the maintenance order

正解:D

解説:
Preventive Maintenance


質問 # 60
The maintenance technician wants to document work steps for a technical object in a notification. What are the best options to be used in regard to code-based reporting? Note: There are 2 correct answers to this question?

  • A. An activity in the notification header
  • B. A task in the notification item
  • C. An entry in the object list
  • D. A text in the subject long text screen

正解:A、B


質問 # 61
The planner adds stock materials in the maintenance order. What are possible options for handling of reservations within a maintenance order? Note: There are 2 correct answers to this question

  • A. All open reservations are closed when the maintenance order is set to TECO.
  • B. Open reservations can be cleared when a maintenance order operation is finally confirmed.
  • C. For the combination of order type and planner group, you can decide when reservations are created
  • D. Reservations are created only after a material availability check has been performed

正解:A、B


質問 # 62
Which are the prerequisites for Inspection Checklist Processing? Note: There are 2 correct answers to this question

  • A. Master inspection characteristics assigned to PM task list operations
  • B. Inspection point type assigned to the task list header
  • C. Classification data assigned to a technical object
  • D. QM inspection plan with assigned inspection characteristics

正解:C、D

解説:
* This is required to define the inspection scope and the checklist type for the technical object. The inspection plan must be classified with the same class as the technical object and have matching characteristic values1.
* Classification data assigned to a technical object: This is required to identify the relevant inspection plan and checklist type for the technical object. The technical object must be classified with the same class as the inspection plan and have matching characteristic values1.
The other options are not correct because:
* Inspection point type assigned to the task list header: This is not a prerequisite for inspection checklist processing, but an optional setting that allows the user to define inspection points for the checklist items2.
* Master inspection characteristics assigned to PM task list operations: This is not a prerequisite for inspection checklist processing, but an optional setting that allows the user to use master inspection characteristics as checklist items2.
References:
1: Explaining Inspection Checklists - SAP Learning 2: Generating Inspection Checklists | SAP Help Portal


質問 # 63
What do you have to consider when implementing UI technologies in SAP S/4HANA Asset Management?
Note: There are 2 correct answers to this question.

  • A. The cloud version can also use SAP GUI for Windows.
  • B. SAP Fiori launchpad supports only SAPUI5 apps.
  • C. SAP GUI for HTML can be used in the SAP Fiori launchpad.
  • D. Web Dynpro apps can be used in the SAP Fiori launchpad.

正解:C、D

解説:
User Interface and Mobile Maintenance


質問 # 64
......