100%合格率リアルC-TS414-2023試験成功を掴み取れ![2024年11月]
SAP C-TS414-2023のPDF問題格別な練習SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Quality Management
質問 # 37
Your customer wants material -dependent code selected from a catalog to show when a Where can you control and limit the codes?
- A. Catalog profile
- B. Product hierarchy
- C. Catalog groups
- D. Catalog settings
正解:A
質問 # 38
Which automatic interface does the system use to record results during production with notification
- A. Quality management =- statistical interface (QM-ST)
- B. Process industry - process control system (PI-PCS)
- C. Quality management information system (QMIS)
- D. Quality management -impaction data interface (QM-IDI)
正解:D
質問 # 39
For which of the following QM elements can the short text be maintained in only one language
- A. Code group and code
- B. Inspection Plan header
- C. Inspection Method
- D. MIC
正解:B
質問 # 40
You can assign objects to the item of a quality notification.Which of the following object categories are supported in the SAP S/4HANA standard system?Note: There are 3 correct answers to this question.
- A. Batch
- B. Purchase order item
- C. Material
- D. Serial number
- E. Delivery item
正解:A、C、D
質問 # 41
You use a status profile in the quality info record in procurement, under which circumstances does the system create an inspection lot of the next supplier relationship during gr processing?
- A. When the vendor attains an A in the vendor Evolution
- B. When the usage decision for the previous inspection lot was rej
- C. When the UD for the previous inspection lot was accepted
- D. When there is an open inspection lot for the current supplier relationship status
正解:C
質問 # 42
In the material master, at which organizational level do you create Quality management (QM) data for inspection type.
- A. Client level
- B. Plant level
- C. Business area level
- D. Company code level
正解:B
質問 # 43
Which of the following QM business processes can require a user's digital signature?(3 Correct Ans)
- A. UD for an inspection lot
- B. Manual confirmation of a physical sample drawing
- C. Approval of quality notification
- D. Defective recording in the inspection Lot
- E. Result recording in the inspection Lot
正解:A、B、E
質問 # 44
Your business requirements demand production triggers.
Which of the following events in production can create an inspection lot(3 Correct Ans)
- A. ATP check
- B. Goods Movement
- C. Order Release
- D. Order Creation
- E. Dead line monitoring /batch monitoring
正解:B、C、E
質問 # 45
Which of the following documents can you use as a reference document. When creating a vender notification? Correct 3
- A. Quotation
- B. Material order
- C. Purchase order
- D. Framework order
- E. Outline agreement
正解:A、D、E
質問 # 46
which copy model must user maintain in a Master inspection character to forbid changes in Inspection plan
- A. Reference characteristics
- B. Inspection qualification
- C. Complete copy model
- D. incomplete copy model
正解:A
質問 # 47
During the creation of an inspection lot which quality management master data automatically trigger Physical sample documents?
- A. Sample drawing procedure
- B. Sample Scheme
- C. Sample procedure
- D. Dynamic Modification rule
正解:A
質問 # 48
To use an inspection plan without multiple specification , you must assign a material master and plant. What additional data can you assign to an inspection plan?(2 correct Ans)
- A. Inspection type
- B. Notification type
- C. Search field
- D. Customer
- E. Vendor
正解:D、E
質問 # 49
Your customer wants to add the quality score of a material as criterion for the vendor evaluation Where do you set the calculation procedure for the quality score:?
- A. Quality info record in procurement
- B. Material master
- C. Dud code
- D. Vendor master
正解:C
質問 # 50
Your customer record defects a characteristic level with in result recording and wants to correct all defects for each inspection ,,,,,,,,,, How do you satisfy the customer requirement?
- A. In the implementation guide IMG select the active quality notification checkbox in the defect class for
- B. Use the same report type for all inspection operations
- C. Active defect recoding in the control indicators of the characteristics used in the inspection plan
- D. In the implementation guide, select the one Q-Notification per inspection type
正解:C
質問 # 51
Which of the following does the system automatically do when you complete a stability? Correct 3
- A. Trigger a subsequent stability Study
- B. Lock the test schedule
- C. Set the usage decision for all stability inspection lots
- D. Set the system status to completed
- E. Lock all the storage conditions
正解:B、D、E
質問 # 52
During which of the following steps in a business process does a dynamic modification rule change severely
- A. The creation of a inspection Lot
- B. The creation of a certification
- C. Creation of a batch
- D. The creation of a notification
正解:A
質問 # 53
During quality notification processing, the activities from the action box can be used. How can the activities be documented in the quality notification? Note: There are 2 correct answers to this question.
- A. As item
- B. As activity
- C. As task
- D. As cause
正解:C、D
質問 # 54
Which QM master data must you maintain to separate a sample into a primary and reserve sample?
- A. Sample processes
- B. Sample drawing procedure
- C. Sample determination
- D. Sample size
正解:B
質問 # 55
What must you do in configuration to enable defects recording during an inspection with inspection lots? Note : 2 correct answer
- A. Define the defect report type
- B. Activate reference to Existing notifications.
- C. Assign the notification type to the inspection type.
- D. Activate the work flow template
正解:A、C
質問 # 56
Your customer user action boxes in the notification processing and wants relationships to exist between the different............' In which implementation guide activity do you define these relationships ?
- A. Customer status scheme
- B. Activity catalog
- C. Functions for action box
- D. Task catalog
正解:C
質問 # 57
You must assign a certificate profile for outgoing certificates to a key combination. What key combination can be used without additional settings?
- A. Material/Customer, Material, Material Group
- B. Material, Customer, Material Group
- C. Customer, Material, Material Group
- D. Material/Customer, Material, Material Type
正解:D
質問 # 58
Which object must combined in test scheduling in the stability study Correct 3
- A. Initial sample
- B. Inspection plans
- C. Physical samples
- D. Physical drawing procedure
- E. Strategy
正解:B、C、E
質問 # 59
The quality inspector records defects in results recording for a material inspection. When creating notification the system determines the catalog profile by consulting objects in which of following sequences?
- A. Notification Type - report type - Material
- B. report type - Notification Type - Material
- C. Material - Notification Type - report type
- D. report type - Material - Notification Type
正解:C
質問 # 60
From which tables does quality management information system (QMIS) retrieve data?
- A. Early warning processes
- B. Info structure
- C. Structure figures
- D. Control charts
正解:B
質問 # 61
Which type of inspection point exist in the system.(3 correct ans)
- A. Inspection point for equipment
- B. Inspection point for incoming certificates
- C. Inspection point for defects recording
- D. Inspection point for Physical sample
- E. Inspection point for functional location
正解:A、D、E
質問 # 62
......
SAP C-TS414-2023 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|---|
| トピック 1 |
|
| トピック 2 |
|
| トピック 3 |
|
| トピック 4 |
|
C-TS414-2023問題集PassTest100%合格率保証:https://www.passtest.jp/SAP/C-TS414-2023-shiken.html
C-TS414-2023試験問題集を使って最速合格:https://drive.google.com/open?id=1dYBJP4L6R2mRiIJp5hQbRfkJ-ZBhgVy7