質問 # 40
Which is the proper fulfillment strategy to plan for supply using the appropriate lead times required for processing material at a third party, based on the manufacturing work definition?

  • A. outside processing operations
  • B. back-to-back orders
  • C. drop shipments
  • D. contract manufacturing
  • E. expense destination transfers

正解:A


質問 # 41
You ran a demand plan and you are reviewing the shipments forecast value measure. It is always zero for a particular item. Identify the root cause of this problem.

  • A. In plan parameters, Item List Price marked as primary does not have price defined for the particular item.
  • B. In planning measures catalog, shipment forecast value measure is not enabled at item and organization level.
  • C. In plan parameters, shipment forecast value measure expression is not defined.
  • D. In planning measures catalog, shipment forecast measure is not enabled at item and organization level.

正解:B


質問 # 42
Your client wants their supply plans to have a customized group of exceptions. What two steps must you complete in order to make sure only these exceptions are included when running all of your client's supply plans? (Choose two.)

  • A. Manage Plans > Select each supply plan > Edit each supply plan > Add your exception set to Plan Options for each supply plan
  • B. Configure Exceptions > Expand Supply Planning Exceptions > Highlight lines with exceptions specified by client > Click 'Add to Exception Set'
  • C. Manage Plans > Select each supply plan > Edit each supply plan > Manually add each exception specified by client
  • D. Configure Exception Sets > Create exception set > Add exceptions specified by client
  • E. Select 'Add to Supply Plan' button > Select which supply plans you want to have this group of exceptions

正解:A、D


質問 # 43
As part of the agreement with one of our suppliers, you are supposed to order product by the 100s. But if the required supply is only 149, how many should be planned to purchase, and which item attribute will cause this to happen?

  • A. Planned Order for 200. Maximum Order Quantity enabled
  • B. Planned Order for 150, with Rounding enabled
  • C. Planned Order for 149, with Fixed Order Quantity enabled
  • D. Planned Order for 100. with Minimum Order Quantity enabled
  • E. Planned Order for 200. with Fixed Lot Size Multiplier enabled

正解:E


質問 # 44
Which statement is correct regarding S&OP plan options?

  • A. Calculating Safety Stock can optionally be included.
  • B. Forecasting profile's input demand measure can only be set to 'consensus forecast' or 'approved consensus forecast'.
  • C. Lead time compression can optionally be included as a legitimate plan constraint.
  • D. Supply Planning Mode 'aggregated' can be turned off.

正解:C


質問 # 45
Demand is high leading up to the Christmas holiday every year between Dec 20 and Dec 24 and not on Christmas day (Dec 25). Your customer has two demand plans. Describe the steps to model Christmas causal factor in both demand plans.

  • A. Open a demand plan and add a new customer specific Christmas causal factor. Create a table displaying the causal factor measure and relevant time period and modify as required. Causal factor changes are plan specific, so repeat the steps in the 2nd demand plan.
  • B. Open a demand plan and edit Christmas casual factor measure. Place value of one from Dec 20 to Dec 24 and zero for non-impacted days including Dec 25. Causal factor changes are plan specific, so repeat the steps in the 2nd demand plan.
  • C. Use FBDI to create a new customer specific Christmas causal factor. Place value of 1 from Dec 20 to Dec 34. Causal factor upload to one demand plan will reflect in the 2nd demand plan also.
  • D. Open a demand plan and edit Christmas casual factor measure. Place value of one from Dec 20 to Dec 24 and zero for non-impacted days including Dec 25. Causal factor changes in this demand plan will reflect in the 2nd demand plan also.
  • E. Open a demand plan and add a new customer specific Christmas causal factor. Create a table displaying the causal factor measure and relevant time period and modify as required. Causal factor changes in this demand plan will reflect in the 2nd demand plan also.
  • F. Use FBDI to create a new customer specific Christmas causal factor. Place value of 1 from Dec 20 to Dec 24. Causal factor changes are plan specific, so repeat the steps in the 2nd demand plan.

正解:E

解説:
Reference:


質問 # 46
Your customer has loaded shipment history of 1/1/14 through 12/31/16 and wants to generate a monthly forecast of 1/1/17 through 12/31/17 based on two-year shipment history.
When creating a demand plan, which two plan scopes and demand plan options should your customer use? (Choose two.)

  • A. For demand plan option, add forecast shipments as forecasting profile, enter history start date as 1/1/15, enter history end date as 12/31/15, and enter forecast start date as 1/1/17.
  • B. For demand plan option, add forecast shipments as forecasting profile, enter history start date as 1/1/15, forecast start date as 1/1/17, and enter forecast end date as 12/31/17.
  • C. For demand plan option, add forecast shipments as forecasting profile, and enter historical buckets as 24.
  • D. For demand plan option, add forecast shipments as forecasting profile, enter historical buckets as 24, and enter forecast buckets as 12.
  • E. For plan scope, select plan horizon as 12 months, forecasting calendar as Gregorian, and forecasting time level as month.
  • F. For plan scope, select plan horizon days as 365, forecasting calendar as Gregorian, and forecasting time level as month.

正解:D、F

解説:


質問 # 47
As a new planner, you want to test simulation set functionality. You have created a simulation set named 'Test Simulation Set.' In this simulation set, you have already added Item 98573. You would like to change the item specification 'Fixed Order Quantity' to 10 within this simulation set.
Which sequence will allow you to accomplish this task?

  • A. Select and open 'Test Simulation Set' > Search and select Item 98573 > Highlight line for Item 98573 and scroll right until you find 'Fixed Order Quantity' > Change value to 10
  • B. Select and open 'Test Simulation Set' > Search and select Item 98573 > Highlight item > Select 'View' > Select 'Columns' > Check box next to Fixed Order Quantity specification> the 'Fixed Order Quantity' will now show on the Item 98573 line > Highlight line for Item 98573 and scroll right until you find 'Fixed Order Quantity' > Change value to 10
  • C. Select and open 'Test Simulation Set' > Search and select Item 98573 > Highlight item > Select 'Action' > Select 'Edit' > Find Fixed Order Quantity specification> under the 'Action' column select 'reset to original' > under the 'Value' column enter 10
  • D. Select and open 'Test Simulation Set' > Search and select Item 98573 > Highlight item > Select 'Action' > Select 'Edit' > Find Fixed Order Quantity specification> under the 'Action' column select 'set value as' > under the 'Value' column enter 10

正解:D


質問 # 48
Your customer wants to be able to manually change the input values in purchase orders and transfer orders for the suggested plan recommendations. Which two recommendations are released by supply chain planning to Oracle Supply Chain Orchestration Cloud? (Choose two.)

  • A. Schedule planned orders for make, buy, and transfer of supplies
  • B. New planned orders for make, buy, and transfer of supplies
  • C. Reschedules of existing make, buy, and transfer supplies
  • D. Reschedules of sales orders, make, and buy

正解:B、C


質問 # 49
When duplicating a supply plan, which parameters can you modify if Copy Type is "copy plan options only"?

  • A. Name, Description. Access. Supply Planning Mode, and Owner
  • B. Name, Description. Access. Owner. Include Archive, and Notes
  • C. Name, Description. Access (but if the original plan was private, you can't edit the Users list), and Notes
  • D. Name, Access. Owner, and Notes

正解:D


質問 # 50
How does the Demand Fulfillment view prioritize at-risk demands?

  • A. Based on the number of associated recommendations required to make the demand no longer at risk
  • B. Based on order value weighted by the number of compression days required to make the demand no longer at risk
  • C. Based on order value weighted by the number of associated recommendations required to make the demand no longer at risk
  • D. Based on the order value per customer weighted by the number of associated recommendations required to make the demand no longer at risk

正解:C

解説:
Review and Improve Your Demand Fulfillment
To improve the demand fulfillment of your plan, use the Demand Fulfillment table to review the at-risk demands in your plan and their related recommendations. You can take actions to accept recommendations from this page.
In the Demand Fulfillment UI, you can:
View prioritized at-risk demands based on order values weighted by the number of associated recommendations.
Take actions to accept or mark recommendations as complete.
Review summary information provided for the current demand fulfillment position of your plan to analyze the potential for improvement based on selected at-risk demands. The information also provides an understanding of the expected demand fulfillment position based on accepted and completed recommendations.
To review and improve your demand fulfillment:
In a Supply Planning, Planning Central, or Demand and Supply work area, select the Manage Plans task.
On the Manage Plans page, search for and open your plan.
In the Page Layout list, select Plan Summary.
Note that the tiles in the Plan Summary layout include a Demand at Risk in thousands tile.
In the Demand at Risk in thousands tile, click the Select Tile bar to review the Demand at Risk Summary data.
You can review the demand at risk data through a treemap view or a table view, the treemap view is the default. To switch to the table view, click the Show Table icon.
To review the demand at risk data:
Using the treemap: Click an area in the treemap. Typically, you want to start with the area that has the highest demand at risk value. From the Drill To actions, click Demand Fulfillment.
Using the table: Click the Show Table icon. In the Demand at Risk Summary table, click a cell. Typically, you want to start with the cell that has the highest demand at risk value. From the Drill To actions, click Demand Fulfillment.
The Demand Fulfillment UI shows the individual orders that are at-risk and their related recommendations.
Tip: You can open the Demand Fulfillment table directly without drilling from the Plan Summary. After you open a plan, click the Open button at the page level. In the Open Table, Graph, or Tile Set dialog box, search for and select the Demand Fulfillment table. In the Demand Fulfillment UI, you can search for at-risk demands by using the filter fields in the search panel.


質問 # 51
Which statement applies only to the planning of back-to-back items and not standard items?

  • A. Planning analyzes supply shortages and capacity overloads using any of the standard planning tools.
  • B. Planning collects bookings or shipments history to forecast items.
  • C. Must use Global Order Promising and Supply Chain Orchestration to release and create new supplies
  • D. Must have added sourcing rules to the Global Order Promising assignment set.
  • E. Planning pegs reserved supplies to sales orders.

正解:C

解説:


質問 # 52
You are viewing a drop shipment plan for your organization and you want to know which customer the purchase order will be shipped to. Where can you see that?

  • A. It is not viewable at this time.
  • B. You can see the supplier on the sales order, but not vice-versa.
  • C. You can see the customer on the supply in Supplies and Demand.
  • D. You need to first drill down to the sales order from the supply-demand link, then open the sales order to get the customer.
  • E. It is visible in the drop ship analytics.

正解:D


質問 # 53
Which is NOT a legitimate way to launch a plan?

  • A. When editing plan options, click Save and Run.
  • B. From Manage Plans, select a plan in the search results, and select Run Plan from the Actions menu.
  • C. From Setup & Maintenance, in the Planning functional area, select a plan and click the Run icon.
  • D. Launch via a scheduled process.

正解:C


質問 # 54
In order for Supply and Demand Plans to run successfully, which three Configure Planning Analytic tasks must be completed? (Choose three.)

  • A. Set up Dimension Catalogs
  • B. Set up Measure Catalogs
  • C. Set up Hierarchy Attributes
  • D. Run the Configure Dimension Catalog process
  • E. Set up Levels and Attributes
  • F. Set up Default Catalogs

正解:A、B、E


質問 # 55
Where do you view the collected data for Organizations, Customers, Suppliers, Carriers, and Interlocation Shipping Networks?

  • A. View Simulation Sets
  • B. View Collected Data
  • C. Maintain Supply Network Model
  • D. Planning Analytics
  • E. Review Plan Inputs

正解:C


質問 # 56
Which statement applies only to the planning of back-to-back items and not standard items?

  • A. Planning analyzes supply shortages and capacity overloads using any of the standard planning tools.
  • B. Planning collects bookings or shipments history to forecast items.
  • C. Must use Global Order Promising and Supply Chain Orchestration to release and create new supplies
  • D. Must have added sourcing rules to the Global Order Promising assignment set.
  • E. Planning pegs reserved supplies to sales orders.

正解:C

解説:


質問 # 57
You are in Implementation project and your customer is a global company with a complex supply chain network. Planners work across different geographies and different line of products. Each planner works with their own set of data and analysis and dashboards.
How do you configure the application so each planner can have their own custom dashboard view-able only to themselves?

  • A. Create private page layouts that are tailored to specific business needs.
  • B. Create public page layouts that are tailored to specific business needs.
  • C. Enable layout security checkbox in the Administer Planning Security.
  • D. You cannot create custom dashboards by user.

正解:A


質問 # 58
Your customer has seasonal demand and wants to generate forecast for next six months. You ran a demand plan for first time using six months of shipments history but the forecast accuracy was low.
Identify two statements that are true in this scenario. (Choose two.)

  • A. Running a demand plan with 18 to 36 months of shipments history is recommended.
  • B. Running a demand plan with six months of booking history instead of six months of shipment history is required for seasonal demand.
  • C. Running a demand plan with both shipments and booking forecast profile is required to forecast seasonal demand.
  • D. Running a demand plan with both shipments and seasonal shipments forecast profile is required to forecast seasonal demand.
  • E. Running a demand plan with less than one year of history will impact seasonal analysis.

正解:A、B


質問 # 59
Which is the correct sequence of possible solutions that a constrained plan might consider when attempting to resolve a capacity or resource overload?

  • A. First subscribe components, then alternate resources, then alternate work definitions and item structures, and finally, alternate suppliers and source organizations.
  • B. First alternate resources, then substitute components, then alternate work definitions and item structures, and finally, alternate suppliers and source organizations.
  • C. First alternate item structures, and work definitions, then substitute components, then alternate resources, and finally, alternate suppliers and source organizations.
  • D. First alternate suppliers, then alternate resources, then substitute components, then alternate work definitions and item structures, and finally, alternate source organizations.

正解:B


質問 # 60
When planning for customer demand to be fulfilled from internal organizations or from a contract manufacturer, what are the four types of planned orders that can be generated? (Choose four.)

  • A. Transfer orders for finished goods being transferred from contract manufacturer organizations to internal organizations.
  • B. Return orders for items being manufactured in the contract manufacturer organization.
  • C. Transfer orders for internally owned components being transferred from contract manufacturer to internal organizations.
  • D. Transfer orders for internally owned components being transferred from internal organizations to contract manufacturer organizations.
  • E. Buy orders for components purchased at internal organizations and contract manufacturer organizations.
  • F. Make orders for items being manufactured in the contract manufacturer organization.

正解:A、D、E、F

解説:


質問 # 61
A customer would like to account for the production loss in the supply planning process using the item shrinkage rate planning specification.
Which statement reflects the system behavior to meet this requirement?

  • A. Planning calculation does not support shrinkage functionality.
  • B. Planning process reduces the demand based on shrinkage factor and keeps the supply quantity as is.
  • C. Planning calculation creates scrap demand to compensate for loss and maintains supply.
  • D. Planning calculates no additional demand but creates the additional required supply based on shrinkage factor.

正解:C


質問 # 62
Another planner has previously created a supply plan, but you now need to make some changes so that you can do some 'what-if' analysis. How can you go about duplicating this plan?

  • A. You cannot duplicate a plan that is not owned by you.
  • B. You cannot duplicate plans. You must create a completely new supply plan.
  • C. Manage Plans > Search and select supply plan > Actions > Edit Plan Options > Select Copy.
  • D. Manage Plans > Search and select supply plan > Actions > Duplicate.
  • E. Run process "Duplicate supply plans" with existing plan as parameter.

正解:D


質問 # 63
The structure of the Plan Summary Layout is a predefined __________.

  • A. Set of Infotiles
  • B. Material Plan view
  • C. Group of Reports
  • D. Set of Exceptions
  • E. Supply Demand Workbench

正解:A