2023年10月19日合格確定ガイド準備1z0-1066-22試験知能問題集 [Q53-Q72]

Share

2023年10月19日合格確定ガイド準備1z0-1066-22試験知能問題集

無料最新Supply Chain Planning Cloud 1z0-1066-22リアル試験問題と回答2023年更新

質問 # 53
Should value in Adjusted Shipments Forecast measure always be equal to the Final Shipments Forecast measure?

  • A. Yes,if the demand plan hasn't been run again after adjustment.
  • B. No, both measures will always be different.
  • C. Yes, if the adjustment is made below the aggregation level at which it is viewed.
  • D. Yes,if the adjustment is made at the same aggregation level at which itis viewed, or below.
  • E. Yes,if the demand plan is approved and values are locked.

正解:D


質問 # 54
Which KPIs are available to measure forecasting accuracy and specify how these measures aggregated from item-organization level to higher levels.

  • A. MAPE, MAD, and Bias are used to measure forecast accuracy. MAD and Bias are aggregated using sum. MAPE is aggregated using weighted average.
  • B. MAPE, MFE, and Bias are used to measure forecast accuracy. MAPE and MFE are aggregated using weighted average. Bias is aggregated using sum.
  • C. MAPE, MAD, and Bias are used to measure forecast accuracy. MAPE and Bias are aggregated using weighted average. MAD is aggregated using sum.
  • D. MAPE, MFE, and Bias are used to measure forecast accuracy. MAPE and Bias are aggregated using weighted average. MFE is aggregated using sum.

正解:A


質問 # 55
Which three statements are true regarding exceptions? (Choose three.)

  • A. You can drill down into Supplies and Demand from an exception line.
  • B. The conditions under which exceptions are generated can be modified.
  • C. You can act on an exception by selecting it and clicking 'Resolve exception'. A list of ways to resolve will be generated.
  • D. The calculation logic for exceptions can be modified.
  • E. You can create custom exceptions.
  • F. You can export exception tables to Excel.

正解:B、D、F


質問 # 56
Which feature is NOT available for Sales and Operations Planning plans?

  • A. Configure Exceptions
  • B. Load Planning Data from Files
  • C. View Segmentation Summary
  • D. Collect Planning Data

正解:A


質問 # 57
The structure of the Plan Summary Layout is a predefined __________.

  • A. Supply Demand Workbench
  • B. Set of Exceptions
  • C. Material Plan view
  • D. Group of Reports
  • E. Set of Infotiles

正解:E


質問 # 58
Which statement is NOT true about Collect Planning Data?

  • A. During a Targeted collection for a specific business object, the existing data is first purged from the planning data repository.
  • B. If only a few business objects are selected for collection, their data dependencies are not automatically included in the data collection.
  • C. Net Change collection does not collect Shipment and Booking history data.
  • D. If you use a predefined template, you can't change the business objects being collected, but you can change the Collection Type.

正解:D


質問 # 59
Which three statements are true regarding Managing Units of Measure? (Choose three.)

  • A. Non-standard, intraclass conversion rates can't be item specific.
  • B. A unit of measure standard conversion specifies the conversion factor by which the unit of measure is equivalent to the unit of measure class.
  • C. You must define a unit of measure class with a base unit of measure.
  • D. A unit of measure conversion is a mathematical relationship between two different units of measure.
  • E. If you want to transact items in units of measure that belong to classes other than their primary UOM class, you must also define conversions between the base units of measure of the different UOM classes.

正解:C、D、E


質問 # 60
Which set of transaction types data are uploaded in Contract Manufacturing Collaboration?

  • A. Component Material Issues, Work-order Completions
  • B. Work-order Completions
  • C. Planned orders, Planned Order Commits
  • D. Component Material Issues, Work-order Completions, Shipment Confirmations

正解:A


質問 # 61
What are two characteristics of an 'Item' organization? (Choose two.)

  • A. It includes parameter definition, including lot. serial number, and item sourcing rules.
  • B. It does not physically of financially track material storage or movement.
  • C. It is ideal for deployments where inventory management may not be installed.
  • D. It requires financial and accounting setups.

正解:B、C


質問 # 62
A global company is subject to differing regulations regarding hazardous materials in a product. Version 1 of the product can be sold in North America and Europe. Version 2 of the product can only be sold in Europe.
Which sequence of setups could help a planner ensure that supply is available in a timely fashion per these constraints?

  • A. Define segment groups based on region and version; execute segmentation; map the segmentation results to an attribute-based netting rule; associate the rule to a supply plan; run the plan.
  • B. Define region and version as planning attributes; map them to collectible attributes; create an attribute-based netting rule using region and version; associate the rule to a supply plan; run the plan.
  • C. Create an attribute-based netting rule using region and version; map the rule to collectible attributes; associate the rule to a supply plan; run the plan.
  • D. Define region and version as planning attributes; create an attribute-based netting rule using region and version; associate the rule to a supply plan; run the plan.

正解:A


質問 # 63
Your client uses product categories and global sourcing rules for supply planning. However, their newest product doesn't follow these rules. For a specific item in the category, it needs to be sourced from a different supplier globally.
How should they set this up for the easiest maintenance, going forward?

  • A. Create a new global sourcing rule for the item; assign it to the assignment set at the item-organization level; alter the category to be category-organization for the remainder of the products.
  • B. Create a new global sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is for the remainder of the products.
  • C. Create a new global sourcing rule for the item; assign it to the assignment set at the item-organization level; leave the category as is for the remainder of the products.
  • D. Create a new local sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is for the remainder of the products.
  • E. Create a new global sourcing rule for the item; remove the category level assignments and create new item level assignments for all items in the category pointing each to the correct global sourcing rule.

正解:B


質問 # 64
You have executed Planning Data Collection and want to confirm that data has successfully been collected. Identify the three data combinations that can be viewed using the Maintain Supply Network Model Page. (Choose three.)

  • A. Calendar and Master Organization
  • B. Sales Channel and Demand Class
  • C. Customer Location and Carriers
  • D. Safety Stock and Subinventories
  • E. Supplier Site and Service Level

正解:A、C、E


質問 # 65
Your Manufacturing Organization makes bicycles and ships 50% of its output directly to large chain retailer customers. Your organization also ships products to your Distribution Center so that it can fulfill many other smaller customers. Your Manufacturing Organizations uses Oracle SCM Planning Cloud, but your Distribution Center does not.
Which setups should you recommend to the Manufacturing Organization?

  • A. Map the Distribution Center as a customer in Maintain Supply Network Model; Select 'include transfer orders' in Edit Plan Options.
  • B. Map the Manufacturing Organization as a supplier in Maintain Supply Network Model; Select 'Include transfer orders' in Edit Plan Options.
  • C. In Edit Plan Options, ensure both organizations are included in plan scope, and select, 'include transfer orders'.
  • D. Select 'include transfer orders' in Edit Plan Options' advanced supply options.

正解:A


質問 # 66
You have created several infotiles based on the client requirements. You now want to group them together for display. How do you accomplish this?

  • A. First build them into a planning group in Manage Planning Groups. Then open the planning group on the plan by going to Open (choose area) > Choose planning group.
  • B. First build them into an info set in Manage Infosets. Then open the info set on the plan by going to Open (choose area) > Choose info set.
  • C. No need to group them. Open them directly on the plan going to Open (choose area) > Choose Infotile.
  • D. First build them into a tile set in Manage Table, Graphs, and Analysis Sets. Then open the tile set on the plan by going to Open (choose area) > Choose tile set.
  • E. First build them into a planning measure in Manage Planning Measures. Then open the planning measure on the plan by going to Open (choose area) > Choose planning measure.

正解:D


質問 # 67
Your client wants to utilize product categories on sourcing rules. They have created a new category for this and populated the items for it.
Where do they set up the category planning uses when evaluating sourcing rules?

  • A. Manage Sourcing Rules
  • B. Manage Planning Source Systems
  • C. Manage Assignment Sets
  • D. Manage Plans
  • E. Manage Planning Profile Options

正解:C


質問 # 68
Demand planner opens the pre-seeded plan summary of the demand plan and wants to analyze the forecast results. Describe the steps to review and analyze the forecast results.

  • A. Click "Demand at Risk in thousands" tile. Review "Demand at Risk by Product Category" graph and pick a product category. Right-click on product category, click Drill To -> Default Group -> Demand Analysis to open the table and review the details.
  • B. Click "Revenue and Margin" tile. Review the "Revenue by Period" graph and pick a specific period. Right-click on a period, click Drill To -> Default Group -> Revenue Analysis to open the table and review the details.
  • C. Click "Forecast Comparison in the thousands" tile. Review "Forecast Comparison by Product Category" graph and pick a product category. Right-click on product category, click Drill To -> Default Group -> Forecast Analysis to open the table and review the details.
  • D. Click "Revenue and Forecast" tile. Review "Revenue by Period" graph and pick a specific period. Right-click on a period, click Drill To -> Default Group -> Forecast Analysis to open the table and review the details.

正解:C

解説:


質問 # 69
It is now January 2023. Your customer has loaded 3 years worth of shipment history (for 1/1/20 through 12/31/22) and wants to generate a monthly forecast for 2023 based on two years of shipment history.
When creating a demand plan, which two plan scope and demand plan options should your customer use? (Choose two.)

  • A. For demand plan option, add forecast shipments as forecasting profile, enter history start date as 1/1/21. enter history end date as 12/31/22. and enter forecast start date as 1/1/23.
  • B. For plan scope, select plan horizon as 12 months, forecasting calendar as Gregorian, and forecasting time level as month.
  • C. For demand plan option, add forecast shipments as forecasting profile, and enter historical buckets as 24.
  • D. For demand plan option, add forecast shipments as forecasting profile, enter historical buckets as 24. and enter forecast buckets as 12.
  • E. For demand plan option, add forecast shipments as forecasting profile, enter history start date as 1/1/21. forecast start date as 1/1/23. and enter forecast end date as 12/31/23.
  • F. For plan scope, select plan horizon days as 365. forecasting calendar as Gregorian, and forecasting time level as month.

正解:B、D


質問 # 70
Your client has a requirement to restrict Supply Plan data access. Identify three Data Access Set detail entities that can be used to restrict plan data access. (Choose three.)

  • A. Demand Class
  • B. Customer
  • C. Supplier
  • D. Transaction Type
  • E. Item
  • F. Material Planner

正解:B、C、E

解説:


質問 # 71
Which option outlines changes you can make a simulation plan when evaluating demand and supply?

  • A. Add demands, cancel demands, reschedule demands, and supply, cancel supply, reschedule supplies
  • B. Change item specification values, change item lead times, change item-organization specification values
  • C. Change item specification values, change item lead times, create mass changes for items
  • D. Change item specification values, change item lead times, create mass changes for items all at once, change item-organization specification values
  • E. Add demands, cancel demands, reschedule demands, add new planned orders, reschedule supplies

正解:A


質問 # 72
......

究極な準備用ガイド1z0-1066-22認定試験Supply Chain Planning Cloud:https://www.passtest.jp/Oracle/1z0-1066-22-shiken.html

1z0-1066-22究極な学習ガイド:https://drive.google.com/open?id=19fSL_M1g8DZxo2mHOtRCR-NiReCadUxx