質問 # 14
You are the NACE Coating Inspector ona tank lining project where desiccant dehumidificationis being used.
Since the first shift ofabrasive Wasting your readings have indicated relative humidity below 40%; however on the second shift of coating application your readings are indicting 80%.
Your FIRST preferred course of action is to:

  • A. Call your supervisor
  • B. Advise the coating applicator supervisor of your readings
  • C. Document the readings at the end of the shift
  • D. Check to see if the dehumidification equipment is operating correctly

正解:B


質問 # 15
Which product Is used in conjunction with other coatings such as FBE when the lines run through wetlands or a body of water?

  • A. Coal Tar Enamel
  • B. Concrete
  • C. 2-Layer Polyethylene (PE)
  • D. 3-Layer Polyethylene (PE)

正解:A


質問 # 16
When performing Inspection in accordance with ASTM D 4138 the Inspector will use:

  • A. A destructive paint inspection Tooke gauge
  • B. A set of 14 pencils of varying hardness
  • C. A mechanical adhesion tester
  • D. A hardness tester

正解:A


質問 # 17
When observing design defects the NACE Inspector should:

  • A. Request that the item be rebuilt with a better design for coating
  • B. Stop the job immediately
  • C. Ignore the defect as the inspector can't change the design
  • D. Document the defect and the potential problems that could result

正解:D


質問 # 18
The Concrete Repair Institute's comparators can be used to assess:

  • A. Contamination levels prior to coating
  • B. Surface cleanliness prior to coating
  • C. Surface profile prior to coating
  • D. Compressive and tensile strength prior to coating

正解:B


質問 # 19
Which type of pipelines collect the gas from the transmission system so utility companies can distribute the gas to end users?

  • A. Distribution
  • B. Gathering
  • C. Midstream
  • D. Transmission

正解:C


質問 # 20
Steel shot grit contaminated with oil or grease used in a cetrifugal blast cleaning should be

  • A. washed with dean potable water prior to use.
  • B. disposed of properly.
  • C. run through the air wash separator.
  • D. mixed with uncontaminated abrasive

正解:A


質問 # 21
In powder coatings, when the particles of powder begin to flow but are not fully liquid, they are in what stage?

  • A. Cure stage
  • B. Flow stage
  • C. Getstage
  • D. Wetting stage

正解:B


質問 # 22
All of these ate advantages of using repair patches EXCEPT

  • A. inert to common acids, alkalis, and solvents.
  • B. barrier to moisture and corrosion.
  • C. special tools or equipment are required.
  • D. excellent abrasion resistance.

正解:C


質問 # 23
II Is always possible to see moisture on a steel substrate:

  • A. False
  • B. True

正解:A


質問 # 24
The number of air turns in an enclosure can be affected by all of these EXCEPT

  • A. type of dehumidification equipment (refrigerant or desiccant).
  • B. manufacturer of the equipment.
  • C. coating type.
  • D. time of the year (winter/summer).

正解:A


質問 # 25
Inspectors perform tests on linings that they may not perform on exterior coatings because

  • A. coatings are expected to degrade over time.
  • B. coatings are more durable than linings.
  • C. linings protect the contents and the container.
  • D. linings are more durable than coatings.

正解:C


質問 # 26
Coating application to concrete substrates is:

  • A. Less challenging than coating steel
  • B. More challenging than coating steel
  • C. Not required as concrete is Inorganic
  • D. The same as coating steel

正解:B


質問 # 27
When completing the Final Inspection report the Inspector should write the report using:

  • A. Language that only those directly Involved in the project would understand
  • B. Language that the most people would understand
  • C. Language that only technical experts would understand
  • D. Language that another NACE Inspector would understand

正解:B


質問 # 28
Inspection and Test plans are developed by referencing:

  • A. The Specification, Safety Manual, Relevant Standards and Codes
  • B. The Specification, SDS, relevant Standards and Codes
  • C. The Specification, TDS, relevant Standards and Codes
  • D. The Specification, Application Guidelines, Relevant Standards and Codes

正解:D


質問 # 29
When conducting inspections the Inspector should follow which standards:

  • A. Australian standards in Australia
  • B. The specified standards
  • C. ISO standards in Europe and Asia
  • D. NACE and 55PC standards in North America

正解:B


質問 # 30
......